HomeMy WebLinkAboutZ-6245-B Staff AnalysisSeptember 27, 2007
ITEM NO.: A.1
NAME: Kanis/Kirby Rezoning from R-2 to C-3 and 0-3
LOCATION: Located on the Northwest corner of Kanis and Kirby Roads
DEVELOPER:
LGR Investment, LLC
404 E. Kiehl Avenue
North Little Rock, AR 72020
ENGINEER:
White Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 5.6 acres
CURRENT ZONING:
PLANNING DISTRICT
CENSUS TRACT:
FILE NO.: Z -6245-B
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
C-1, Neighborhood Commercial and R-2, Single-family
18 — Ellis Mountain
42.10
VARIANCES/WAIVERS REQUESTED: None requested.
SURROUNDING LAND USE AND ZONING
North — R-2, Single-family District — Single-family Residences and PD -0 for an office use
South — Vacant - Conceptual PCD presently at the Board of Directors for approval to
establish uses and create lots (August 6, 2007)
East — R-2, Single-family District — Single-family Residences
West — C-1, Neighborhood Commercial - Vacant - PCD zoning for a convenience store with
gas pumps at the Board of Directors on appeal of the Planning Commission's
recommendation of denial (August 6, 2007)
J '
September 27, 2007
SUBDIVISION
ITEM NO.: A.1 Cont. FILE NO.: Z -6245-B
A. PUBLIC WORKS COMMENTS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required. Per the Master
Street Plan an additional 10 feet of right-of-way is required to be dedicated for the
right turn lane onto Kirby Road.
2, Asbury Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
3. Kirby Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
4. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Kirby Road.
5. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Asbury Road.
6. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to Kanis Road including 5 -
foot sidewalks with the planned development. The back of curb should be
located 33 feet from centerline. A right turn lane should be installed at the Kanis
Road -Kirby Road intersection. The right turn lane should be provided with 150
feet of stacking distance and 100 foot taper.
7. With site development, provide the design of the street conforming to the Master
Street Plan. Construct one-half street improvements to Kirby Road including 5 -
foot sidewalks with the planned development. The back of curb should be
located 18 feet from the centerline.
8. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to Asbury Road including 5 -
foot sidewalk with the planned development. The back of curb should be located
18 feet from centerline.
9. The future driveway on Kanis Road must align with Woodlands Edge Trail. If
future driveways are proposed on Kanis Road they must be right in/right out only
and meet the City driveway spacing criteria.
10. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1805 (Travis Herbner).
11. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
2
September 27, 2007
SUBDIVISION
ITEM NO.: A.1 (Cont.
FILE NO.: Z -6245-B
12. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
13. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
14. Street Improvement plans shall include signage and striping. Traffic Engineering
must approve completed plans prior to construction.
15. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501)
379-1805 (Travis Herbner) for more information.
PUBLIC TRANSPORTATION ELEMENT:
The site is not located on a dedicated CATA Bus Route.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The Parkway Place Property Owners Association, the Gibralter
Heights/Point West/Timber Ridge Neighborhood Association, all owners of property
located within 200 feet of the site and all residents, who could be identified, located
within 300 feet of the proposed development were notified of the public hearing.
D. LAND USE ELEMENT:
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Mixed Office Commercial for this property. The applicant has
applied for a rezoning from R-2, Single-family to C-3, General Commercial District and
0-3, General Office District.
A land use plan amendment for a change to Commercial and Office is a separate item
on this agenda (LU07-18-01).
Master Street Plan: Kanis Road is shown as a Minor Arterial on the plan. A Minor
Arterial provides connections to and through an urban area and their primary function
is to provide short distance travel within the urbanized area. Kirby Road is shown as a
Collector. The primary function of a Collector is to provide a connection from Local
Streets to Arterials. These streets may require dedication of right-of-way and may
require street improvements for entrances and exits to the site. Entrances and exits
should be limited to minimize negative effects of traffic and pedestrians on Kanis Road
since it is a Minor Arterial.
3
September 27, 2007
SUBDIVISION
ITEM NO.: A.1 (Cont.) FILE NO.: Z -5245-B
Bicycle Plan: A Class III bike route is planned along Kirby Road and south across
Kanis Road. A Class III bikeway is a signed route on a street shared with traffic. No
additional paving or right-of-way is required. Class III bicycle route signage may be
required.
City Recognized Neighborhood Action Plan: The property under review is covered
under the Rock Creek Neighborhood Action Plan. The Plan's Office and Commercial
goal states: "Aggressively use Planned Zoning Districts (PZDs) to influence more
neighborhood -friendly and better quality developments."
E. STAFF ANALYSIS:
The applicant owns approximately 10 acres located north of Kanis Road at the
intersections of Kirby and Asbury Roads. The property is currently zoned R-2, Single-
family and C-1, Neighborhood Commercial and the applicant is requesting to rezone
the property to 0-3, General Office District and C-3, General Commercial District
excluding Convenience food store with gas pumps, Beverage shop and Bar, lounge or
tavern as allowable uses for the property with Planning Commission site plan review
and approval prior to development. As separate items on this agenda the applicant is
seeking preliminary plat approval (S-1582) to allow the creation of two lots with
3.49 acres proposed for C-3 zoning and .97 acres proposed for office zoning and an
amendment to the City's Future Land Use Plan (LU07-18-01) to change the Plan from
Mixed Office Commercial to Commercial. This rezoning request is proposed to allow
future development of the property.
Ordinance No. 17,442 adopted by the Little Rock Board of Directors on April 1, 1997,
rezoned a portion of this site (0.34 acres) from R-2. Single-family to C-1,
Neighborhood Commercial. The site contains a number of residences both site built
and manufactured homes and a building constructed for a commercial use a number
of years ago now being used as a residence. There is a property to the north on
Asbury Road zoned PD -O currently being used as an office for Davis Forestry. To the
north on Kirby Road the property is zoned R-2 with a CUP which was approved to
allow a manufactured home on the property. To the southeast is a newly developing
single-family subdivision with attached and detached residential structures. South of
the site is property presently zoned 0-3, General Office District and C-1,
Neighborhood Commercial District being considered for rezoning by the Board of
Directors on August 6, 2007, to PCD to create lots and establish uses for the
Woodlands Edge overall Master Plan. To the west of the site is a vacant property
currently zoned C-1, Neighborhood Commercial District. The property is to be
considered by the Board of Directors on August 6, 2007, for a rezoning to PCD to
allow a convenience store with gas pumps and a carwash. Northwest of the site is a
property zoned PD -R which was approved to allow the construction of attached
single-family homes.
The City's Future Land Use Plan designates this property as "Mixed Office
Commercial". A land use plan amendment for a change to a portion of this site to
Commercial is a separate item on this agenda (LU07-18-01).
S
September 27, 2007
SUBDIVISION
ITEM NO.: A.1 Cont.' FILE NO.: Z -6245-B
Staff is not supportive of the C-3, General Commercial District portion of the rezoning
request. The entirety of the property is identified on the City's Future Land Use Plan
as Mixed Office Commercial, which provides for a mixture of office and commercial
uses to occur. Acceptable uses include office or mixed office and commercial uses. A
planned zoning district is required if the use is mixed office and commercial. As
previously stated the applicant is seeking a change to the City's Future Land Use Plan
as a separate item on this agenda for the commercial portion of the rezoning
application. Staff is not in support of the change to the City's Future Land Use Plan
allowing this area to become designated as Commercial. The Kanis Road corridor has
been reviewed a number of times in the recent past and it has generally been
determined the current land use designations are acceptable to allow for the future
growth and development of the area. An established single-family neighborhood is
located immediately north of the site, which in staff's opinion, should be coddled to
limit the potential impacts of intense commercial activities in their back yard. South
and southwest of the site is property currently being considered by the Board of
Directors for rezoning to a Planned Commercial Development to establish uses and
create lot layouts for future development. This area is being developed as a part of
the overall Master Plan for the Woodlands Edge Subdivision. This item is scheduled to
be heard by the Little Rock Board of Directors on August 6, 2007.
Staff feels the zoning of the property should not be approved and the future
development be in-line with the City's Future Land Use Plan designation of Mixed
Office Commercial. The present designation would allow for office development on
the property. Staff would support a rezoning to 0-3, General Office District for the
entirety of the property or development in some manner as a Planned Zoning District
as required by present Future Land Use designation. Staff feels that C-3, General
Commercial District zoning at this location could have an adverse impact on the
surrounding residential uses.
F. STAFF RECOMMENDATIONS:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (AUGUST 16, 2007)
The applicant was present. There were no registered objectors present. Staff presented the
item stating the applicant had submitted a request dated August 10, 2007, requesting a
deferral of this item to the September 27, 2007, public hearing. Staff stated they were
supportive of the deferral request.
There was no further discussion of the item. The chair entertained a motion for placement of
the item on the consent agenda for deferral. The motion carried by a vote of 7 ayes, 0 noes,
3 absent and 1 open position.
5
September 27, 2007
SUBDIVISION
ITEM NC.: A.1 (Cont.
STAFF UPDATE:
FILE NO.: Z -6245-B
(SEPTEMBER 27, 2007)
The applicant has amended the application from a proposed rezoning from C-1,
Neighborhood Commercial District and R-2, Single-family District to C-3, General
Commercial District and 0-3, General Office District to a rezoning from C-1, Neighborhood
Commercial District and R-2, Single-family District to Conceptual PCD. The site plan
includes an overall development plan with two lots currently proposed. A single drive is
indicated from Kanis Road and the applicant has indicated at the time of development they
will work with Public Works staff to determine the best location for any additional drives.
The total project will not exceed 80,000 square feet of gross building area and 40 percent
building coverage. The maximum commercial building area will not exceed 60,000 square
feet with office uses occupying a minimum of 20,000 square feet. Restaurant square
footage will not exceed 6,000 square feet if constructed as a stand alone building and if
located within strip center the total square footage for the restaurant use shall not exceed the
minimum parking standards as established by the zoning ordinance.
The request includes the utilization of the permitted uses listed in the 0-3, General Office
District and the permitted uses in the C-3, General Commercial District classification
excluding the following listed uses: Bar, lounge or tavern, Beverage shop, Cabinet or wood
working shop, Cigar, tobacco and candy store, College dormitory, College fraternity or
sorority, Convenience store with gas pumps, Establishment for the care of alcoholic, narcotic
or psychiatric patients, Feed store, Group care facility, Hospital, Lodge or fraternal
organization, Parking, commercial lot or garage, Pawnshop, Private club with dining or bar
service, Recycling facility, automated and Service station.
The development of the overall property will be completed in phases. With the Conceptual
PCD plan, each phase of development, beginning with Phase I, will require review and
approval by the Planning Commission and Board of Directors. As part of the conceptual PCD
proposal, the applicant has agreed to a set of development criteria to be placed of the future
development of the property. The development criteria includes conditions related to right of
way improvements, grading/excavation, landscaping/buffering, signage, site lighting,
dumpsters, building design/orientation, as well as other issues. The following list the
proposed development criteria:
All portions of the property shall be landscaped in compliance with the City's minimum
landscape and buffer ordinances. The landscape and buffer ordinance review will be
based on the site as a whole rather than individual lots, therefore distances of the required
buffers will be based on the depth or width of the entire site as applicable.
■ A landscape plan stamped with the seal of a registered landscape architect and an
automatic irrigation system will be required as each building permit is submitted or a plan
for the entire project may be submitted with the first phase of the development.
Ce]
September 27, 2007
SUBDIVISION
ITEM NO.: A.1
FILE NO.: Z -6245-B
• The site development must be designed to provide adequate internal pedestrian
circulation.
• All wall signage and directional signage must comply with the City's Zoning Ordinance,
unless otherwise approved by the Planning Commission during the site plan review
process.
• The development will be limited to two ground mounted monument signs located at the
street intersections with a single development sign located at the entrance to the
proposed development. All signs shall be a maximum of 100 square feet in area and a
maximum of 8 feet in height.
• The total project building construction shall not exceed 80,000 square feet.
• The commercial/retail portion of the development shall not exceed a total of 60,000 gross
square feet of floor area with a maximum of 6,000 square feet of restaurant space if
constructed in a stand alone building. The square footage of a restaurant located within a
strip center shall not exceed the minimum parking standards as established by the zoning
ordinance.
• Buildings constructed on the office portion of the development shall be at least 25% of the
total development or a total of 20,000 square feet of the total gross floor area of the
project.
• All site lighting must be low level and directional, directed downward and into the site.
• Any dumpster or trash receptacle must be oriented away from the abutting roadways and
must be screened as per the City's Zoning Ordinance requirements.
• Servicing of the dumpster or trash receptacles must be during daylight hours only.
• The design of the buildings must be approved by the Planning Commission during the site
plan review process. The buildings must be designed as 360 degree building when the
rear of the building is proposed abutting an adjoining roadway.
• All service/loading dock doors shall be oriented away from the abutting streets and
provide proper screening.
• The maximum building height on the property will not exceed 35 feet unless approved by
the Planning Commission.
Staff is supportive of the proposed "Conceptual PCD" zoning. Staff feels the list of
development criteria adequately addresses the future development of the site. Staff feels the
review and development of each phase adhering to these conditions/criteria will assure
orderly development of the site. Staff feels the conceptual PCD is a good option for
development of this property and although a not much used process has worked well in the
past. A good example of a conceptual PCD is "The Village at Rahling Road". This
development had an initial commercial phase, with additional office and commercial uses
being phased in. Each phase of development is reviewed and approved by the Planning
Commission and Board of Directors prior to construction. Staff feels the proposed
7
September 27, 2007
SUBDIVISION
ITEM NO.: A.1 (Cont.) FILE NO.: Z -6245-B
Conceptual PCD zoning will have no adverse impact on the surrounding properties or the
general area.
The accompanying amendment to the City's Future Land Use Plan is to be withdrawn since
the current amended application request to Planned Commercial Development to allow an
office/commercial mixed use development complies with the land use plan classification for
the property of Mixed Office Commercial.
Staff recommends approval of the amended request as outlined in the staff update to rezone
the site from R-2, Single-family and C-1, Neighborhood Commercial to PCD subject to
compliance with the comments and conditions as noted in the agenda staff report.
PLANNING COMMISSION ACTION: (SEPTEMBER 27, 2007)
The applicant was present. There were no registered objectors present. Staff presented the
item with a recommendation of approval of the amended application request to rezone the
site from R-2, Single-family and C-1, Neighborhood Commercial to PCD as outlined in the
staff update subject to compliance with the comments and conditions as noted in the agenda
staff report.
There was no further discussion of the item. The chair entertained a motion for placement of
the item on the consent agenda for approval. The motion carried by a vote of 9 ayes, 0 noes,
1 absent and 1 open position.
FILE NO.: Z -6245-B
NAME: Kanis/Kirby Rezoning from R-2 to C-3 and 0-3
LOCATION: Located on the Northwest corner of Kanis and Kirby Roads
DEVELOPER:
LGR Investment, LLC
404 E. Kiehl Avenue
North Little Rock, AR 72020
ENGINEER:
White Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 5.6 acres
CURRENT ZONING:
PLANNING DISTRICT:
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
C-1, Neighborhood Commercial and R-2, Single-family
18 — Ellis Mountain
CENSUS TRACT: 42.10
VARIANCES/WAIVERS REQUESTED: None requested.
SURROUNDING LAND USE AND ZONING
North — R-2, Single-family District — Single-family Residences and PD -O for an office use
South — Vacant - Conceptual PCD presently at the Board of Directors for approval to
establish uses and create lots (August 6, 2007)
East — R-2, Single-family District — Single-family Residences
West — C-1, Neighborhood Commercial - Vacant - PCD zoning for a convenience store with
gas pumps at the Board of Directors on appeal of the Planning Commission's
recommendation of denial (August 6, 2007)
FILE NO.: Z -6245-B (Cont.
0
PUBLIC WORKS COMMENTS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required. Per the Master
Street Plan an additional 10 feet of right-of-way is required to be dedicated for the
right turn lane onto Kirby Road.
2. Asbury Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
3. Kirby Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
4. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Kirby Road.
5. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Asbury Road.
6. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to Kanis Road including 5 -
foot sidewalks with the planned development. The back of curb should be
located 33 feet from centerline. A right turn lane should be installed at the Kanis
Road -Kirby Road intersection. The right turn lane should be provided with 150
feet of stacking distance and 100 foot taper.
7. With site development, provide the design of the street conforming to the Master
Street Plan. Construct one-half street improvements to Kirby Road including 5 -
foot sidewalks with the planned development. The back of curb should be
located 18 feet from the centerline.
8. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to Asbury Road including 5 -
foot sidewalk with the planned development. The back of curb should be located
18 feet from centerline.
9. The future driveway on Kanis Road must align with Woodlands Edge Trail. If
future driveways are proposed on Kanis Road they must be right in/right out only
and meet the City driveway spacing criteria.
10. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1805 (Travis Herbner).
11. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
12. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
13. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
2
FILE NO.: Z -6245-B (Cont.
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
14. Street Improvement plans shall include signage and striping. Traffic Engineering
must approve completed plans prior to construction.
15. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501)
379-1805 (Travis Herbner) for more information.
B. PUBLIC TRANSPORTATION ELEMENT:
The site is not located on a dedicated CATA Bus Route.
C. NEIGHBORHOOD COMMENTS:
I
As of this writing, staff has received several informational phone calls from area
residents. The Parkway Place Property Owners Association, the Gibralter
Heights/Point West/Timber Ridge Neighborhood Association, all owners of property
located within 200 feet of the site and all residents, who could be identified, located
within 300 feet of the proposed development were notified of the public hearing.
LAND USE ELEMENT -
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Mixed Office Commercial for this property. The applicant has
applied for a rezoning from R-2, Single-family to C-3, General Commercial District and
0-3, General Office District.
A land use plan amendment for a change to Commercial and Office is a separate item
on this agenda (LU07-18-01).
Master Street Plan: Kanis Road is shown as a Minor Arterial on the plan. A Minor
Arterial provides connections to and through an urban area and their primary function
is to provide short distance travel within the urbanized area. Kirby Road is shown as a
Collector. The primary function of a Collector is to provide a connection from Local
Streets to Arterials. These streets may require dedication of right-of-way and may
require street improvements for entrances and exits to the site. Entrances and exits
should be limited to minimize negative effects of traffic and pedestrians on Kanis Road
since it is a Minor Arterial.
Bicycle Plan: A Class III bike route is planned along Kirby Road and south across
Kanis Road. A Class III bikeway is a signed route on a street shared with traffic. No
additional paving or right-of-way is required. Class III bicycle route signage may be
required.
City Recognized Neighborhood Action Plan: The property under review is covered
under the Rock Creek Neighborhood Action Plan. The Plan's Office and Commercial
3
FILE NO.: Z -6245-B (Cont.
goal states: "Aggressively use Planned Zoning Districts (PZDs) to influence more
neighborhood -friendly and better quality developments."
E. STAFF ANALYSIS:
The applicant owns approximately 10 acres located north of Kanis Road at the
intersections of Kirby and Asbury Roads. The property is currently zoned R-2, Single-
family and C-1, Neighborhood Commercial and the applicant is requesting to rezone
the property to 0-3, General Office District and C-3, General Commercial District
excluding Convenience food store with gas pumps, Beverage shop and Bar, lounge or
tavern as allowable uses for the property with Planning Commission site plan review
and approval prior to development. As separate items on this agenda the applicant is
seeking preliminary plat approval (S-1582) to allow the creation of two lots with
3.49 acres proposed for C-3 zoning and .97 acres proposed for office zoning and an
amendment to the City's Future Land Use Plan (LU07-18-01) to change the Plan from
Mixed Office Commercial to Commercial. This rezoning request is proposed to allow
future development of the property.
Ordinance No. 17,442 adopted by the Little Rock Board of Directors on April 1, 1997,
rezoned a portion of this site (0.34 acres) from R-2, Single-family to C-1,
Neighborhood Commercial. The site contains a number of residences both site built
and manufactured homes and a building constructed for a commercial use a number
of years ago now being used as a residence. There is a property to the north on
Asbury Road zoned PD -0 currently being used as an office for Davis Forestry. To the
north on Kirby Road the property is zoned R-2 with a CUP which was approved to
allow a manufactured home on the property. To the southeast is a newly developing
single-family subdivision with attached and detached residential structures. South of
the site is property presently zoned 0-3, General Office District and C-1,
Neighborhood Commercial District being considered for rezoning by the Board of
Directors on August 6, 2007, to PCD to create lots and establish uses for the
Woodlands Edge overall Master Plan. To the west of the site is a vacant property
currently zoned C-1, Neighborhood Commercial District. The property is to be
considered by the Board of Directors on August 6, 2007, for a rezoning to PCD to
allow a convenience store with gas pumps and a carwash. Northwest of the site is a
property zoned PD -R which was approved to allow the construction of attached
single-family homes.
The City's Future Land Use Plan designates this property as "Mixed Office
Commercial". A land use plan amendment for a change to a portion of this site to
Commercial is a separate item on this agenda (LU07-18-01).
Staff is not supportive of the C-3, General Commercial District portion of the rezoning
request. The entirety of the property is identified on the City's Future Land Use Plan
as Mixed Office Commercial, which provides for a mixture of office and commercial
uses to occur. Acceptable uses include office or mixed office and commercial uses. A
planned zoning district is required if the use is mixed office and commercial. As
previously stated the applicant is seeking a change to the City's Future Land Use Plan
as a separate item on this agenda for the commercial portion of the rezoning
application. Staff is not in support of the change to the City's Future Land Use Plan
allowing this area to become designated as Commercial. The Kanis Road corridor has
M
FILE NO.: Z -6245-B (Cont.
F.
been reviewed a number of times in the recent past and it has generally been
determined the current land use designations are acceptable to allow for the future
growth and development of the area. An established single-family neighborhood is
located immediately north of the site, which in staff's opinion, should be coddled to
limit the potential impacts of intense commercial activities in their back yard. South
and southwest of the site is property currently being considered by the Board of
Directors for rezoning to a Planned Commercial Development to establish uses and
create lot layouts for future development. This area is being developed as a part of
the overall Master Plan for the Woodlands Edge Subdivision. This item is scheduled to
be heard by the Little Rock Board of Directors on August 6, 2007.
Staff feels the zoning of the property should not be approved and the future
development be in-line with the City's Future Land Use Plan designation of Mixed
Office Commercial. The present designation would allow for office development on
the property. Staff would support a rezoning to 0-3, General Office District for the
entirety of the property or development in some manner as a Planned Zoning District
as required by present Future Land Use designation. Staff feels that C-3, General
Commercial District zoning at this location could have an adverse impact on the
surrounding residential uses.
STAFF RECOMMENDATIONS:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (AUGUST 16, 2007)
The applicant was present. There were no registered objectors present. Staff presented the
item stating the applicant had submitted a request dated August 10, 2007, requesting a
deferral of this item to the September 27, 2007, public hearing. Staff stated they were
supportive of the deferral request.
There was no further discussion of the item. The chair entertained a motion for placement of
the item on the consent agenda for deferral. The motion carried by a vote of 7 ayes, 0 noes,
3 absent and 1 open position.
STAFF UPDATE:
(SEPTEMBER 27, 2007)
The applicant has amended the application from a proposed rezoning from C-1,
Neighborhood Commercial District and R-2, Single-family District to C-3, General
Commercial District and 0-3, General Office District to a rezoning from C-1, Neighborhood
Commercial District and R-2, Single-family District to Conceptual PCD. The site plan
includes an overall development plan with two lots currently proposed. A single drive is
indicated from Kanis Road and the applicant has indicated at the time of development they
will work with Public Works staff to determine the best location for any additional drives.
9
FILE NO.: Z -6245-B Cont.
The total project will not exceed 80,000 square feet of gross building area and 40 percent
building coverage. The maximum commercial building area will not exceed 60,000 square
feet with office uses occupying a minimum of 20,000 square feet. Restaurant square
footage will not exceed 6,000 square feet if constructed as a stand alone building and if
located within strip center the total square footage for the restaurant use shall not exceed the
minimum parking standards as established by the zoning ordinance.
The request includes the utilization of the permitted uses listed in the 0-3, General Office
District and the permitted uses in the C-3, General Commercial District classification
excluding the following listed uses: Bar, lounge or tavern, Beverage shop, Cabinet or wood
working shop, Cigar, tobacco and candy store, College dormitory, College fraternity or
sorority, Convenience store with gas pumps, Establishment for the care of alcoholic, narcotic
or psychiatric patients, Feed store, Group care facility, Hospital, Lodge or fraternal
organization, Parking, commercial lot or garage, Pawnshop, Private club with dining or bar
service, Recycling facility, automated and Service station.
The development of the overall property will be completed in phases. With the Conceptual
PCD plan, each phase of development, beginning with Phase I, will require review and
approval by the Planning Commission and Board of Directors. As part of the conceptual PCD
proposal, the applicant has agreed to a set of development criteria to be placed of the future
development of the property. The development criteria includes conditions related to right of
way improvements, grading/excavation, landscaping/buffering, signage, site lighting,
dumpsters, building design/orientation, as well as other issues. The following list the
proposed development criteria:
• All portions of the property shall be landscaped in compliance with the City's minimum
landscape and buffer ordinances. The landscape and buffer ordinance review will be
based on the site as a whole rather than individual lots, therefore distances of the required
buffers will be based on the depth or width of the entire site as applicable.
• A landscape plan stamped with the seal of a registered landscape architect and an
automatic irrigation system will be required as each building permit is submitted or a plan
for the entire project may be submitted with the first phase of the development.
• The site development must be designed to provide adequate internal pedestrian
circulation.
■ All wall signage and directional signage must comply with the City's Zoning Ordinance,
unless otherwise approved by the Planning Commission during the site plan review
process.
• The development will be limited to two ground mounted monument signs located at the
street intersections with a single development sign located at the entrance to the
proposed development. All signs shall be a maximum of 100 square feet in area and a
maximum of 8 feet in height.
• The total project building construction shall not exceed 80,000 square feet.
X
FILE NO.: Z -6245-B Cont.
■ The commercial/retail portion of the development shall not exceed a total of 60,000 gross
square feet of floor area with a maximum of 6,000 square feet of restaurant space if
constructed in a stand alone building. The square footage of a restaurant located within a
strip center shall not exceed the minimum parking standards as established by the zoning
ordinance.
• Buildings constructed on the office portion of the development shall be at least 25% of the
total development or a total of 20,000 square feet of the total gross floor area of the
project.
• All site lighting must be low level and directional, directed downward and into the site.
• Any dumpster or trash receptacle must be oriented away from the abutting roadways and
must be screened as per the City's Zoning Ordinance requirements.
• Servicing of the dumpster or trash receptacles must be during daylight hours only.
• The design of the buildings must be approved by the Planning Commission during the site
plan review process. The buildings must be designed as 360 degree building when the
rear of the building is proposed abutting an adjoining roadway.
• All service/loading dock doors shall be oriented away from the abutting streets and
provide proper screening.
• The maximum building height on the property will not exceed 35 feet unless approved by
the Planning Commission.
Staff is supportive of the proposed "Conceptual PCD" zoning. Staff feels the list of
development criteria adequately addresses the future development of the site. Staff feels the
review and development of each phase adhering to these conditions/criteria will assure
orderly development of the site. Staff feels the conceptual PCD is a good option for
development of this property and although a not much used process has worked well in the
past. A good example of a conceptual PCD is "The Village at Rahling Road". This
development had an initial commercial phase, with additional office and commercial uses
being phased in. Each phase of development is reviewed and approved by the Planning
Commission and Board of Directors prior to construction. Staff feels the proposed
Conceptual PCD zoning will have no adverse impact on the surrounding properties or the
general area.
The accompanying amendment to the City's Future Land Use Plan is to be withdrawn since
the current amended application request to Planned Commercial Development to allow an
office/commercial mixed use development complies with the land use plan classification for
the property of Mixed Office Commercial.
Staff recommends approval of the amended request as outlined in the staff update to rezone
the site from R-2, Single-family and C-1, Neighborhood Commercial to PCD subject to
compliance with the comments and conditions as noted in the agenda staff report.
7
FILE NO.: Z -6245-B (Cont.
PLANNING COMMISSION ACTION: (SEPTEMBER 27, 2007)
The applicant was present. There were no registered objectors present. Staff presented the
item with a recommendation of approval of the amended application request to rezone the
site from R-2, Single-family and C-1, Neighborhood Commercial to PCD as outlined in the
staff update subject to compliance with the comments and conditions as noted in the agenda
staff report.
There was no further discussion of the item. The chair entertained a motion for placement of
the item on the consent agenda for approval. The motion carried by a vote of 9 ayes, 0 noes,
1 absent and 1 open position.
Eta
ITEM NO.: 8. Z -6245-B
NAME: Kanis/Kirby Rezoning from R-2 to C-3 and 0-3
LOCATION: located on the Northwest corner of Kanis and Kirby Roads
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than August 1, 2007. The Office of
Planning and Development must receive the proof of notice no later than August 10,
2007.
Public Works Conditions:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45 feet from centerline will be required. Per the Master Street Plan
an additional 10 feet of right-of-way is required to be dedicated for the right turn lane
onto Kirby Road.
2. Asbury Road is classified on the Master Street Plan as a collector street. A
dedication of right-of-way 30 feet from centerline will be required.
3. Kirby Road is classified on the Master Street Plan as a collector street. A dedication
of right-of-way 30 feet from centerline will be required.
4. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Kirby Road.
5. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis
Road and Asbury Road.
6. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Kanis Road including 5 -foot
sidewalks with the planned development. The back of curb should be located 33
feet from centerline. A right turn lane should be installed at the Kanis Road -Kirby
Road intersection. The right turn lane should be provided with 150 feet of stacking
distance and 100 foot taper.
7. With site development, provide the design of the street conforming to the Master
Street Plan. Construct one-half street improvements to Kirby Road including 5 -foot
sidewalks with the planned development. The back of curb should be located 18
feet from the centerline.
8. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Asbury Road including 5 -foot
sidewalk with the planned development. The back of curb should be located 18 feet
from centerline.
9. The future driveway on Kanis Road must align with Woodlands Edge Trail. If future
driveways are proposed on Kanis Road they must be right in/right out only and meet
Item # 8.
the City driveway spacing criteria.
10. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1805 (Travis Herbner).
11. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
12. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
13.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
14. Street Improvement plans shall include signage and striping. Traffic Engineering
must approve completed plans prior to construction.
15. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-
1805 (Travis Herbner) for more information.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Mixed Office Commercial for this property. The applicant has
applied for a rezoning from R-2 to C-3 and 0-3.
A land use plan amendment for a change to Commercial and Office is a separate item
on this agenda (LU07-18-01).
Master Street Plan Kanis Road is shown as a Minor Arterial on the plan. A Minor
Arterial provides connections to and through an urban area and their primary function is
to provide short distance travel within the urbanized area. Kirby Road is shown as a
Collector. The primary function of a Collector is to provide a connection from Local
Streets to Arterials. These streets may require dedication of right-of-way and may
require street improvements for entrances and exits to the site. Entrances and exits
should be limited to minimize negative effects of traffic and pedestrians on Kanis Road
since it is a Minor Arterial.
Bicycle Plan: A Class III bike route is planned along Kirby Road and south across Kanis
Road. A Class III bikeway is a signed route on a street shared with traffic. No
additional paving or right-of-way is required. Class III bicycle route signage may be
required.
City Recognized Neighborhood Action Plan- The property under review is covered
under the Rock Creek Neighborhood Action Plan. The Plan's Office and Commercial
goal states: "Aggressively use Planned Zoning Districts (PZDs) to influence more
neighborhood -friendly and better quality developments."
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, August 1, 2007.
Item # 8.