HomeMy WebLinkAboutZ-6240-A Staff AnalysisFILE NO.: Z -6240-A
NAME: View Point Office Development Long -form POD
LOCATION: Located North of Cantrell Road, East of Sam Peck Road
DEVELOPER:
The Hathaway Group
1001 North University Avenue
Little Rock, AR 72207
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 1.2 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 1
0-3, General Office District
General Office District uses
-•B
0-3, General Office District uses
FT_ NEW STREET: 0 LF
VARIANCESNVAIVERS REQUESTED: A variance from the Land Alteration Ordinance
to allow advanced grading of Lot 2.
A. PROPOSAL/REQUEST:
The applicant is proposing the subdivision of a 6.3 -acre tract into four office
zoned lots as a separate item on this agenda (File No. S-1485). The applicant is
requesting a rezoning of proposed Lot 1 to POD to allow the development of this
office lot inconsistent with the minimum lot area standard designated per the
Highway 10 Design Overlay District. The applicant has indicated proposed Lot 1
will contain 1.20 acres and be developed with an office building.
The applicant has indicated the site will be utilized as a medical facility with a
lease area to be marketed to an 0-3, General Office District use. The site plan
includes the placement of 49 parking spaces. The total building square footage
proposed is 8,936. The applicant has indicated a 30 -foot side yard building
FILE NO.: Z-6240-A(Cont.)
setback and a 25 -foot rear yard building setback. The front yard building line has
been indicated at 100 -feet. The applicant has indicated a maximum building
height of 30 -feet. A single dumpster is proposed along View Pointe Cove with a
note indicating the dumpster will be screened on three sides per ordinance
requirements. The applicant has indicated a single ground mounted monument
style sign to be located in the front yard landscaped area. The site is proposed
as six feet in height and seventy-two square feet in area, consistent with signage
allowed under the Highway 10 Design Overlay District.
The applicant is requesting a variance form the Land Alteration Ordinance to
allow advanced grading. The applicant is requesting to grade Lot 2 with the
development of Lot 1 to assist in balancing the cut and fill of the site.
B. EXISTING CONDITIONS:
The site is a vacant tract located on the north side of Cantrell Road. There office
uses located to the east of the site and a vacant R-2, Single-family zoned tract
located to the west of the site. There is an office development located further
west of the site and a church located on a MF -12 zoned tract of property. North
of the site is a large utility easement with an overhead power transmission line.
The Walton Heights Subdivision is located further north of the site. South of the
site are office uses and a church. Southeast of the site is a large multi -family
development accessed from Pleasant Ridge Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing staff has not received any comment from area residents. The
Walton Height/Candlewood Neighborhood Association, the Pankey Community
Improvement District, the Piedmont Neighborhood Association, along with all
property owners located within 200 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
2. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
4. Storm water detention ordinance applies to this property.
5. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
2
LE NO.: Z -6240-A
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the connection(s) will apply to this project in addition to
normal charges. Water main extensions will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at
377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #25, the Highway 10 Express
Route.
F. I SS U ESITECH N I CAL/DES I G N:
Planninq Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Transition for this property. The applicant
has applied for a change from 0-3 (General Office District) to POD (Planned
Office Development) for construction of an office development. The request
does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is shown as Principal Arterial on the Master
Street Plan and is constructed as a five -lane road through this section. The
primary function of a Principal Arterial is to serve through traffic and to connect
major traffic generators or activity centers within urbanized areas. Office uses
could generate traffic so access should be limited on Cantrell Road. Cantrell
Road may require dedication of right-of-way and may require street
improvements.
Bicycle Plan: Existing or proposed Class I, II, or III bikeways are not in the
immediate vicinity of the development.
K
FILE NO.: Z -6240-A Cont.
Ci Reco nized Neighborhood Action Plan: The applicant's property lies in the
area covered by the River Mountain Neighborhood Action Pian. The Sustainable
Natural Environment goal listed an objective of promoting the vigorous
enforcement of the landscaping and excavation ordinance. This action could
result in the removal of trees in order to accommodate the development of uses
possible in an office development.
Landscape: The plan submitted appears to have 297 square feet less interior
landscaping than the 1,311 square feet (8%) required by the Landscape
Ordinance_ Variances from the Landscape Ordinance require City Beautiful
Commission approval.
Areas set aside for landscaping appear to meet the Highway 10 Design Overlay
District requirements.
A six-foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings, is required along the western
perimeter of the site.
An irrigation system to water landscaped areas will be required.
G. SUBDIVISION COMMITTEE COMMENT: (June 16, 2005)
Mr. Joe White was present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned any alternative uses
for the proposed building. Staff also questioned the lease area indicted on the
proposed site plan. Staff stated the indicated dumpster did not have a note
concerning proposed screening. Staff also noted typically dumpsters were not
allowed adjacent to the right of way.
Landscaping comments were addressed. Staff stated the plan submitted did not
appear to include sufficient interior landscaping. Staff stated a variance would
require approval from the City Beautiful Commission as well as from the Planning
Commission. Staff stated the areas set aside for landscaping appeared to meet
the Highway 10 Design Overlay District requirement. Staff noted easements
could not be used in computing the depth or area of the land use buffer in
development abutting property used or zoned for single-family development.
Staff noted screening would be required along the western perimeter of the site.
Public Works comments were addressed. Staff stated sidewalks would be
required on all boundary streets. Staff also stated a grading permit would be
required prior to any development of the site.
Staff noted comments from the various other reporting departments and
agencies suggesting Mr. White contact them individually for further clarification.
0
FILE NO.: Z -6240-A {Cont.
There was no further discussion of the item and the committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the June 16, 2005, Subdivision Committee meeting. The applicant has
indicated the proposed uses of the site will be uses as allowed in the 0-3,
General Office District zoning classification. The applicant has also indicated the
proposed dumpster screening and the proposed occupancy of the lease area.
The applicant has indicated landscaping sufficient to meet the interior
landscaping requirements per the Zoning Ordinance and the Landscape
Ordinance. The applicant has also indicated screening will be provided along the
western perimeter of the site. The indicated site plan does not include the
placement of easements along the western or northern property lines. The
applicant has indicated sufficient landscaping in these areas to comply with the
typical minimum requirements of the Highway 10 Design Overlay District.
The applicant is proposing the subdivision of a 6.3 -acre tract into four office
zoned lots as a separate item ort this agenda (File No. S-1485). The applicant is
requesting a rezoning of proposed Lot 1 to POD to allow the development of this
office lot inconsistent with the minimum lot area standard designated in the
Highway 10 Design Overlay District. The applicant has indicated proposed Lot 1
will contain 1.20 acres and be developed with an office building. The Highway
10 Design Overlay District typically requires a minimum lot size of two acres.
The applicant has indicated a POD for proposed Lot 1 to comply with the overlay
standards. Staff is supportive of the applicant's request for a reduced lot area.
Staff does not feel the indicated reduced lot area will negatively impact the
adjoining properties.
The applicant has indicated the site will be utilized as a medical facility with a
lease area to be marketed to an 0-3, General Office District use. The applicant
has indicted one doctor will utilize the building and is proposing the lease area as
an office use as allowed under the 0-3, General Office District zoning
classification. The site plan includes the placement of 49 parking spaces. The
total building square footage proposed is 8,936. The indicated parking is
sufficient to meet the typical minimum parking required for a medical office
facility, six spaces per doctor, and an allowable use under the 0-3, General
Office District zoning classification.
The applicant has indicated a 30 -foot side yard building setback and a 25 -foot
rear yard setback. The front yard building line has been indicated at 100 -feet.
The Highway 10 Design Overlay District typically requires a minimum building
setback of 40 -feet on the rear, 30 -feet on the sides and 100 -feet along the front
yard area. The indicated rear yard setback is not sufficient to meet the typical
minimum rear yard setback per the Highway 10 Design Overlay District. Staff is
supportive of the reduced rear yard setback. The adjoining property is zoned
5
FILE NO.- Z -6240-A Cont.
0-3 and will more than likely be developed as an office use. Staff does not feel
the reduced rear yard building setback will have any adverse impact on adjacent
development.
A single dumpster is proposed along View Pointe Cove with a note indicating the
dumpster will be screened on three sides per ordinance requirements. Typically,
dumpsters are not allowed adjacent to the street. Staff is supportive of the
placement of the dumpster adjacent to View Pointe Cove. The applicant has
indicated a five foot retaining wall along the rear portion of the dumpster which
will help to further screen the dumpster location. In staff's opinion, even though
the dumpster is located adjacent to the roadway, the proposed location will be
the least visible from Cantrell Road and View Pointe Cove.
The applicant has indicated a single ground mounted monument style sign to be
located in the front yard landscaped area. The sign is proposed as six feet in
height and seventy-two square feet in area, consistent with signage allowed
under the Highway 10 Design Overlay District.
The applicant is requesting a variance form the Land Alteration Ordinance to
allow advanced grading of the site. The applicant is requesting to grade of Lot 2
with the development of Lot 1 to assist in balancing the site. Staff is supportive
of this request. The applicant has indicated the trees along the southern
perimeter of Lot 2 will be retained to screen the graded area. The applicant has
also indicated the area will be restored per the Land Alteration Ordinance by
reseeding the area disturbed.
The applicant has indicated any site lighting will be low level and directed inward
away from residentially zoned properties and designed to not disturb the scenic
appearance preserved in the Highway 1.0 Corridor. The applicant has indicated
lighting will be directed to the parking areas and not reflected into the adjacent
neighborhoods. The indicated lighting is consistent with Highway 10 Design
Overlay District requirements.
Staff is supportive of the applicant's request to rezone the proposed lot to POD to
allow the construction of a new office building on the site. Although the indicated
site plan does not fully comply with the typical requirements of the Highway 10
Design Overlay District staff feels the applicant has tried to meet the intent of the
Highway 10 Design Overlay District. Staff feels if the development is constructed
as proposed the development should have minimal impact on the adjoining
properties.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
Staff recommends approval of the applicant's request for advanced grading of
proposed Lot 2 with the development of proposed Lot 1.
E
FILE NO.: Z -6240 -A Cont.
PLANNING COMMISSION ACTION:
(JULY 7, 2005)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the agenda staff report. Staff also
presented a recommendation of approval of the applicant's request for advanced
grading of proposed Lot 2 with the development of proposed Lot 1.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 11 ayes, 0 noes and 0 absent.
7
July 7, 2005
ITEM NO.: 17 FILE NO.: Z -6240-A
NAME: View Point Office Development Long -form POD
LOCATION: Located North of Cantrell Road, East of Sam Peck Road
DEVELOPER:
The Hathaway Group
1001 North University Avenue
Little Rock, AR 72207
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 1.2 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE:
NUMBER OF LOTS: 1
0-3, General Office District
General Office District uses
-•i
0-3, General Office District uses
FT. NEW STREET: 0 LF
VARIANCESANAIVERS REQUESTED: A variance from the Land Alteration Ordinance
to allow advanced grading of Lot 2.
A. PROPOSAUREQUEST:
The applicant is proposing the subdivision of a 6.3 -acre tract into four office
zoned lots as a separate item on this agenda (File No. S-1485). The applicant is
requesting a rezoning of proposed Lot 1 to POD to allow the development of this
office lot inconsistent with the minimum lot area standard designated per the
Highway 10 Design Overlay District. The applicant has indicated proposed Lot 1
will contain 1.20 acres and be developed with an office building.
The applicant has indicated the site will be utilized as a medical facility with a
lease area to be marketed to an 0-3, General Office District use. The site plan
includes the placement of 49 parking spaces. The total building square footage
July 7, 2005
SUBDIVISiON
ITEM NO.: 17 Cont. FILE NO.: Z -6240-A
proposed is 8,936. The applicant has indicated a 30 -foot side yard building
setback and a 25 -foot rear yard building setback. The front yard building line has
been indicated at 100 -feet. The applicant has indicated a maximum building
height of 30 -feet. A single dumpster is proposed along View Pointe Cove with a
note indicating the dumpster will be screened on three sides per ordinance
requirements. The applicant has indicated a single ground mounted monument
style sign to be located in the front yard landscaped area. The site is proposed
as six feet in height and seventy-two square feet in area, consistent with signage
allowed under the Highway 10 Design Overlay District.
The applicant is requesting a variance form the Land Alteration Ordinance to
allow advanced grading. The applicant is requesting to grade Lot 2 with the
development of Lot 1 to assist in balancing the cut and fill of the site.
B. EXISTING CONDITIONS:
The site is a vacant tract located on the north side of Cantrell Road. There office
uses located to the east of the site and a vacant R-2, Single-family zoned tract
located to the west of the site. There is an office development located further
west of the site and a church located on a MF -12 zoned tract of property. North
of the site is a large utility easement with an overhead power transmission line.
The Walton Heights Subdivision is located further north of the site. South of the
site are office uses and a church. Southeast of the site is a large multi -family
development accessed from Pleasant Ridge Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing staff has not received any comment from area residents. The
Walton Height/Candlewood Neighborhood Association, the Pankey Community
Improvement District, the Piedmont Neighborhood Association, along with all
property owners located within 200 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
2. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
i -a
July 7, 2005
SUBDIVISION
ITEM NO.: 17(Cont.)FILE NO.: Z -6240-A
E.
4. Storm water detention ordinance applies to this property.
5. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension
required for the project. Contact the
for additional information.
Entergy: No comment received.
required, with easements, if service is
Little Rock Wastewater Utility at 688-1414
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the connection(s) will apply to this project in addition to
normal charges. Water main extensions will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at
377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #25, the Highway 10 Express
Route.
F. ISSU ESITECH N ICALIDESIGN:
Planninq Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Transition for this property. The applicant
has applied for a change from 0-3 (General Office District) to POD (Planned
Office Development) for construction of an office development. The request
does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is shown as Principal Arterial on the Master
Street Plan and is constructed as a five -lane road through this section. The
primary function of a Principal Arterial is to serve through traffic and to connect
major traffic generators or activity centers within urbanized areas. Office uses
3
July 7, 2005
SUBDIVISION
ITEM NO.: 17 Cont. FILE NO.: Z-6240 -A
could generate traffic so access should be limited on Cantrell Road. Cantrell
Road may require dedication of right-of-way and may require street
improvements.
Bicycle Plan_: Existing or proposed Class I, Il, or III bikeways are not in the
immediate vicinity of the development.
Ci Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the River Mountain Neighborhood Action Plan. The Sustainable
Natural Environment goal listed an objective of promoting the vigorous
enforcement of the landscaping and excavation ordinance. This action could
result in the removal of trees in order to accommodate the development of uses
possible in an office development.
Landscape: The plan submitted appears to have 297 square feet less interior
landscaping than the 1,311 square feet (8%) required by the Landscape
Ordinance. Variances from the Landscape Ordinance require City Beautiful
Commission approval.
Areas set aside for landscaping appear to meet the Highway 10 Design Overlay
District requirements.
A six-foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings, is required along the western
perimeter of the site.
An irrigation system to water landscaped areas will be required.
G. SUBDIVISION COMMITTEE COMMENT:
(June 16, 2005)
Mr. Joe White was present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned any alternative uses
for the proposed building. Staff also questioned the lease area indicted on the
proposed site plan. Staff stated the indicated dumpster did not have a note
concerning proposed screening. Staff also noted typically dumpsters were not
allowed adjacent to the right of way.
Landscaping comments were addressed. Staff stated the plan submitted did not
appear to include sufficient interior landscaping. Staff stated a variance would
require approval from the City Beautiful Commission as well as from the Planning
Commission. Staff stated the areas set aside for landscaping appeared to meet
the Highway 10 Design Overlay District requirement. Staff noted easements
4
July 7, 2005
SUBDIVISION
ITEM NO.: 17 (Cont.) FILE NO.: Z -6240-A
could not be used in computing the depth or area of the land use buffer in
development abutting property used or zoned for single-family development.
Staff noted screening would be required along the western perimeter of the site.
Public Works comments were addressed. Staff stated sidewalks would be
required on all boundary streets. Staff also stated a grading permit would be
required prior to any development of the site.
Staff noted comments from the various other reporting departments and
agencies suggesting Mr. White contact them individually for further clarification.
There was no further discussion of the item and the committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the June 16, 2005, Subdivision Committee meeting. The applicant has
indicated the proposed uses of the site will be uses as allowed in the 0.3,
General Office District zoning classification. The applicant has also indicated the
proposed dumpster screening and the proposed occupancy of the lease area.
The applicant has indicated landscaping sufficient to meet the interior
landscaping requirements per the Zoning Ordinance and the Landscape
Ordinance. The applicant has also indicated screening will be provided along the
western perimeter of the site. The indicated site plan does not include the
placement of easements along the western or northern property lines. The
applicant has indicated sufficient landscaping in these areas to comply with the
typical minimum requirements of the Highway 10 Design Overlay District.
The applicant is proposing the subdivision of a 6.3 -acre tract into four office
zoned lots as a separate item on this agenda (File No. S-1485). The applicant is
requesting a rezoning of proposed Lot 1 to POD to allow the development of this
office lot inconsistent with the minimum lot area standard designated in the
Highway 10 Design Overlay District. The applicant has indicated proposed Lot 1
will contain 1.20 acres and be developE:d with an office building. The Highway
10 Design Overlay District typically requires a minimum lot size of two acres.
The applicant has indicated a POD for proposed Lot 1 to comply with the overlay
standards. Staff is supportive of the applicant's request for a reduced lot area.
Staff does not feel the indicated reduced lot area will negatively impact the
adjoining properties.
The applicant has indicated the site will be utilized as a medical facility with a
lease area to be marketed to an 0-3, General Office District use. The applicant
has indicted one doctor will utilize the building and is proposing the lease area as
A
July 7, 2005
SUBDIVISION
ITEM NO.: 17 Cont. FILE NO.: Z -6240-A
an office use as allowed under the 0-3, General Office District zoning
classification. The site plan includes the placement of 49 parking spaces. The
total building square footage proposed is 8,936. The indicated parking. is
sufficient to meet the typical minimum parking required for a medical office
facility, six spaces per doctor, and an allowable use under the 0-3, General
Office District zoning classification.
The applicant has indicated a 30 -foot side yard building setback and a 25 -foot
rear yard setback. The front yard building line has been indicated at 100 -feet.
The Highway 10 Design Overlay District typically requires a minimum building
setback of 40 -feet on the rear, 30 -feet on the sides and 100 -feet along the front
yard area. The indicated rear yard setback is not sufficient to meet the typical
minimum rear yard setback per the Highway 10 Design Overlay District. Staff is
supportive of the reduced rear yard setback. The adjoining property is zoned
0-3 and will more than likely be developed as an office use. Staff does not feel
the reduced rear yard building setback will have any adverse impact on adjacent
development.
A single dumpster is proposed along View Pointe Cove with a note indicating the
dumpster will be screened on three sides per ordinance requirements. Typically,
dumpsters are not allowed adjacent to the street. Staff is supportive of the
placement of the dumpster adjacent to View Pointe Cove. The applicant has
indicated a five foot retaining wall along the rear portion of the dumpster which
will help to further screen the dumpster location. In staff's opinion, even though
the dumpster is located adjacent to the roadway, the proposed location will be
the least visible from Cantrell Road and View Pointe Cove.
The applicant has indicated a single ground mounted monument style sign to be
located in the front yard landscaped area. The sign is proposed as six feet in
height and seventy-two square feet in area, consistent with signage allowed
under the Highway 10 Design Overlay District.
The applicant is requesting a variance form the Land Alteration Ordinance to
allow advanced grading of the site. The applicant is requesting to grade of Lot 2
with the development of Lot 1 to assist in balancing the site. Staff is supportive
of this request. The applicant has indicated the trees along the southern
perimeter of Lot 2 will be retained to screen the graded area. The applicant has
also indicated the area will be restored per the Land Alteration Ordinance by
reseeding the area disturbed.
The applicant has indicated any site lighting will be low level and directed inward
away from residentially zoned properties and designed to not disturb the scenic
appearance preserved in the Highway 10 Corridor. The applicant has indicated
lighting will be directed to the parking areas and not reflected into the adjacent
L
July 7, 2005
SUBDIVISION
ITEM NO.: 17 Cont. FILE NO.: Z -5240-A
neighborhoods. The indicated lighting is consistent with Highway 10 Design
Overlay District requirements.
Staff is supportive of the applicant's request to rezone the proposed lot to POD to
allow the construction of a new office building on the site. Although the indicated
site plan does not fully comply with the typical requirements of the Highway 10
Design Overlay District staff feels the applicant has tried to meet the intent of the
Highway 10 Design Overlay District. Staff feels if the development is constructed
as proposed the development should have minimal impact on the adjoining
properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
Staff recommends approval of the applicant's request for advanced grading of
proposed Lot 2 with the development of proposed Lot 1.
PLANNING COMMISSION ACTION- (JULY 7, 2005)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the agenda staff report. Staff also
presented a recommendation of approval of the applicant's request for advanced
grading of proposed Lot 2 with the development of proposed Lot 1.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 11 ayes, 0 noes and 0 absent.
7
ITEM NO.: 17 FILE NO.: Z -6240-A
NAME: View Point Office Development Long -form POD
LOCATION_ : located North of Cantrell Road, East of Sam Peck Road
r� Y� "
Planning Staff Comments:'
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide the use of the building. Are there are alternative uses being requested.
What use is proposed for the lease area?
3. Provide the total building square footage on the proposed site plan.
4. Provide the maximum building height in the general notes section of the proposed
site plan.
5. Provide a note concerning the proposed dumpster screening in the general notes
section of the proposed site plan. Typically, dumpsters are not allowed adjacent to
the street.
6. Provide a note concerning the height of the proposed retaining wall.
7. Provide details concerning any proposed signage to be located on the site including
the height/area/location.
8. Provide details of any proposed fencing to be located on the site including
height/location and construction materials.
9. Provide a note concerning the desire zoning of indicated Lots 2 — 4.
10. The indicated lot size is 1.20 acre. The minimum lot size proposed for a lot abutting
Cantrell Road per the Design Overlay District is 2.0 acres. The applicant has
indicated a POD for proposed Lot 1 to comply with the overlay standards.
11.The Highway 10 Design Overlay District typically requires a minimum building
setback of 40 -feet on the rear, 30 -feet on the sides and 100 -feet along the front.
Provide dimensions of all the indicated building setbacks. It appears the indicated
site plan only allows for a 25 -foot side and rear yard setback.
12.Any site lighting must be low level and directed inward away from residentially zoned
properties and designed to not disturb the scenic appearance preserved in the
Highway 10 Corridor. Lighting should be directed to the parking areas and not
reflected into the adjacent neighborhoods.
Variance/Waivers: None requested.
Public Works Conditions:
Sidewalks with appropriate handicap ramps are required in accordance with Section
31-175 of the Little Rock Code and the Master Street Plan.
2. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage
plans will need to be submitted and approved prior to the start of construction.
4. Storm water detention ordinance applies to this property.
5. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is required for
the project Contact the Little Rock Wastewater Utility at 688-1414 for additional
information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the
size of the connection(s) will apply to this project in addition to normal charges. Water
main extensions will be required in order to provide service to this property. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3700.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #25, the Highway 10 Express Route.
Planning Division: This request is located in the River Mountain Planning District. The
Land Use Plan shows Transition for this property. The applicant has applied for a
change from 0-3 (General Office District) to POD (Planned Office Development) for
construction of a bank and allow for future office development. The request does not
require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is shown as Principal Arterial on the Master Street
Plan and is constructed as a five -lane road through this section. The primary function of
a Principal Arterial is to serve through traffic and to connect major traffic generators or
activity centers within urbanized areas. Office uses could generate traffic so access
should be limited on Cantrell Road. Cantrell Road may require dedication of right-of-
way and may require street improvements.
Bicycle Plan, Existing or proposed Class I, II, or III bikeways are not in the
immediate vicinity of the development.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the River Mountain Neighborhood Action Plan. The Sustainable Natural
Environment goal listed an objective of promoting the vigorous enforcement of the
landscaping and excavation ordinance. This action could result in the removal of trees
in order to accommodate the development of uses possible in an office development.
Landscape: The plan submitted appears to have 297 square feet less interior
landscaping than the 1,311 square feet (8%) required by the Landscape Ordinance.
Variances from the Landscape Ordinance require City Beautiful Commission approval.
Areas set aside for landscaping appear to meet the Highway 10 Design Overlay District
requirements.
A six-foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings, is required along the western perimeter of
the site.
An irrigation system to water landscaped areas will be required.