Loading...
HomeMy WebLinkAboutZ-6240-B Staff Analysis.June 7, 2007 ITEM NO.: 8 FILE NO.: Z -6240-B NAME: D1 Sports Training — Conditional Use Permit LOCATION: #10 Viewpointe Cove OWNER/APPLICANT- Pfeifer and Hathaway/Barger PROPOSAL: A conditional use permit is requested to allow construction of a sports training and physical therapy clinic on this 0-3 zoned, 4.0 acre tract. 1. SITE LOCATION: The property is located on the west side of Viewpointe Cove, one lot north of Cantrell Road. 2. COMPATIBILITY WITH NEIGHBORHOOD: The site is located within an office/institutional node that has developed at the intersection of Cantrell Road and Sam Peck. Most of the surrounding properties are occupied by office type uses. The R-2 zoned property to the west contains a cemetery. Undeveloped, wooded property is adjacent to the north, between this site and the homes above on Southridge. The proposed use is not incompatible with uses in the area. All owners of properties located within 200 feet of the site, all residents within 300 feet of the site who could be identified and the Piedmont and Walton Heights Neighborhood Associations were notified of this request. 3. ON SITE DRIVES AND PARKING: Access to the site will be via a single driveway off of Viewpointe Cove which will be extended beyond its current terminus. A total of 40 parking spaces will be provided. An average of 15 persons at a time will be attending this specialty sports fitness facility. On occasion, up to 30 persons will be at the facility, if a whole sports team comes in as a group. There is additional space on the site to accommodate more parking, if it is determined it is needed. 4. SCREENING AND BUFFERS: Site plan must comply with the City's minimal landscape and buffer ordinance requirements. This proposal appears to reflect the twenty-five foot (25') landscape area around the sites perimeter per the Highway 10 district standards. June 7; 2007 ITEM NO.: 8 (Cont. FILE NO.: Z -6240-B Areas set aside for buffer and landscaping appear to meet with the landscape ordinance and the Highway 10 district standards. An automatic irrigation system to water newly landscaped areas will be required. A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the northern and western perimeters of the site. Credit towards fulfilling this requirement can be given for existing trees and undergrowth that satisfies this year -around requirement. Prior to the issuance of a building permit a landscape plan must be approved and must obtain the seal of a licensed Landscape Architect. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree -covered site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger Both the City Beautiful Commission and the City of Little Rock commend you for the preserving of many on-site existing trees. 5. PUBLIC WORKS COMMENTS: In a letter dated August 19, 2005, Jim Hathaway, representing the applicant, requested the sidewalk along Cantrell Road be deferred for two (2) years or until platting of the next lot which ever occurred first. Staff was acceptable of the deferral request. Since this application is for development of the second lot, at time of construction, sidewalk with handicap ramps will be required to be installed along Cantrell Road. 2. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 3. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. If detention has already been provided, verify the capacity including the proposed development. 4. At the time of development, repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 2 June 7, 2007 ITEM NO.: 8 Cont. FILE NO.: Z -6240-B 6. UTILITY FIRE DEPT. AND CATA COMMENTS: Wastewater: Sewer available to this property. Entergy: No comment received. Centerpoint Energy: Approved as submitted. AT&T (SBC): No comment received. Water: A water main extension will be required in order to provide service to this property. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of water facilities. Fire Department: Fire hydrant will be required. County Planning: No Comments. SUBDIVISION COMMITTEE COMMENT: (MAY 17, 2007) The applicant was present. Staff presented the item and noted additional information was needed regarding building design and height, building setbacks, signage, fencing, site lighting and days and hours of operation. The applicant was asked to provide information on the typical number of clients and employees that would be at the facility at any one time. Public Works, Landscape and Utility Comments were noted and discussed. Public Works staff noted that platting of this lot would trigger construction of a sidewalk on the Cantrell Road frontage of adjacent Lot 1 which had previously been deferred. The applicant stated he would make the developers of the Subdivision aware of that comment. The applicant was advised to respond to staff issues by May 23, 2007. The Committee then forwarded the item to the full Commission. STAFF ANALYSIS: D1 Sports Training proposes to construct a specialty sports fitness facility on the 0-3 zoned, 4 acre tract located at #10 Viewpointe Cove. The site is currently undeveloped. The southern portion of the site was cleared and leveled previously. The northern portion of the site is heavily wooded and slopes up from 3 June 7, 2007 ITEM NO.: 8 (Cont.) FILE NO.: Z -6240-B the south to the north. The proposed development is to be located on the southern portion of the tract. D1 Sports Training focuses on speed, strength and agility training for athletes. D1 previously prepares inter -scholastic athletes to participate in Division 1 College Sports. The company also trains those same athletes to play at the professional level. D1 facilities are not designed to be the typical fitness facility. Members must schedule specific times for training. The proposed development consists of an 18,000 square foot building and a 40 -space parking lot. The building will be constructed with a colored metal siding and roof. The building will have an eave height of 25± feet and a ridge height of 35 feet. The building will contain a small indoor turf football field, fitness machines, a therapy room, locker rooms and offices. Days and hours of operation are proposed as 6:00 a.m. — 9:00 p.m., Monday through Friday; 8:00 a.m. — 5:00 p.m., Saturday; and closed on Sundays. On the average, 15 clients will be at the facility at one time. On occasion, up to 30 clients will be at the facility if an entire sports team comes as a group. The applicant submitted responses to issues raised at Subdivision Committee and has agreed to comply with all comments. Signage consists of a wall sign on the front wall and a single ground -mounted sign, which will comply with office district standards (6' in height and 64 square foot in area). Screening has been shown and landscaping will comply with the Highway 10 Overlay District Standards. There is no bill of assurance issue since this subdivision is now being final platted and any bill of assurance will accommodate the use. To staff's knowledge, there are no outstanding issues. STAFF RECOMMENDATION: Staff recommends approval of the requested C.U.P. subject to compliance with comments and conditions as outlined in Sections 4, 5, 6 and the Staff Analysis of the agenda Staff Report. PLANNING COMMISSION ACTION: (JUNE 7, 2007) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the conditions outlined in the "staff recommendation" above. There was no further discussion. The item was placed on the consent agenda and approved as recommended by staff. The vote was 9 ayes, 0 noes, 1 absent and 1 open position. Id