Loading...
HomeMy WebLinkAboutZ-6240-B Map 10EROSION AND 5EDIMENTATION GONTROL ME650RE5 PROTECTION A6AIN5T EROSION AND SEDIMENTATION WILL BE PROVIDED BY THE USE OF PERMANENT AND TEMPORARY CONTROLS AND WILL BE IN PLACE THROUGHOUT THE SITE UNTIL THE DISTURBED AREAS ARE STABILIZED. TEMPORARY CONTROL MEASURES A. ROCK CONSTRUCTION ENTRANCE B. FILTER FABRIC FENCE G. INLET PROTECTION PERMANENT CONTROL MEA50RE5 A. PAVED DRIVES AND PARKING AREAS B. ROOF DRAINS, GURBIN6, CULVERTS AND STORM DRAINS G. RIP -RAP AT STORM DRAIN AND CULVERT OUTLETS D. REVE6E7ATION OF ALL DISTURBED AREAS SEQUENCE OF CONSTRUCTION THE GENERAL FORMAT FOR EARTHMOVING ACTIVITIES SHALL BE AS FOLLOWS: A. THE CITY OF LITTLE ROCK AND ADEQ (NOI ) SHALL BE NOTIFIED 46 HOURS PRIOR TO START OF CONSTRUCTION. B. INSTALLATION OF FILTER FABRIC FENCE AND CONSTRUCTION EXIT. G. STRIP TOP SOIL FROM CONSTRUCTION AREAS. CONTRACTOR TO LOCATE SUITABLE AREA FOR 5TORA6E AND WILL APPLY TEMPORARY SEED WITHIN 5 DAYS. FILTER FABRIC FENCE WILL BE USED AS REQUIRED AROUND STOCKPILE. D. ROUGH GRADING AND STABILIZATION OF PARKING AREAS, GENERAL 51TE 6RADIN6 A5 DENOTED ON THE PLANS. E. INSTALL STORM DRAINAGE, INLET, INLET PROTECTION F. BUILDING CONSTRUCTION, INSTALLATION OF ROOF DRAINS AND OTHER UTILITIES. 6. FINAL 6RADIN6 AND INSTALLATION OF CURB. H. PAVING OF PARKING AREAS AND DRIVES I. 5TA13ILIZATION AND 5EEDIN6 OF ALL DISTURBED AREAS, SEE LANDSCAPE PLAN J. REMOVAL OF REMAINING TEMPORARY CONTROLS K. ALL IMPROVEMENTS TO CONFORM WITH ARKAN5A5 DEQ ER05ION AND SEDIMENT CONTROL MEASURES. 015TURBED AREAS MUST BE RESEEDED AND 5TRAWED WITHIN 15 DAYS OF D15TURBANGE. UNIVERSAL SOIL LOSS EGAJATION. A=RKL5CP WH®2E A = 501L LOSS (TOWAC) R = RAINFALL 6 RUNOFF FACTOR 0300 FOR PJLASKI COUNTY) K = 501L ERODIBILITY FACTOR (0.11 FOR THE MOUNTAINBUR6 SOIL GROUP, 12-40%) L = 5LOPE LEN6TH FACTOR 5 = SLOPE 5TEEPNE55 FACTOR (L5 = 11.13 FOR A 3:1 SLOPE OVER A 140' LENGTH) C, = COVER d MANA6EMENT FACTOR (0.20 FOR 5EEDIN6 I LOOSE 5TRAW MULCH) 6 = COVER d MANAGEMENT FACTOR (IA FOR NO ER05ION CONTROL5) P = PRACTICE FACTOR (O.qO FOR TRACK -WALKED UP AND DONAI SLOPE) A = 300 X 0.17 X 11.13X ID X 0.9 = 511 TON5/AC/YR WITHOUT ER05ION CONTROL5 A = 300 X 0.17 X 11.13X 0.20 X 0.9 = 102 TONS/AC/YR WITH EROSION CONTROLS z MAINTENANGE ALL TEMPORARY ER05ION AND SEDIMENTATION CONTROLS SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT AGGORDING TO THE FOLLOWINE7 M56HEDUI F: ROGk. 5TMjGMEAC 1��E# MANFUFACTURER ASSIZE I. T HE SPEC I I ITh IONSBYILADI71N6 GK. AYSTOCICP� ROCK MATERIAL WILL BE MAINTAINED ON THE 51TE FOR TH15 PURPOSE. 2. AT THE END OF EACH CONSTRUCTION DAY, ALL SEDIMENT DEPOSITED ON THE ROADWAY WILL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE. 3. WA5HIN6 OF THE ROADWAY WITH WATER 15 NOT PERMITTED. FILTER FABRIC FENCE I. THE FENCE INSTALLATION SHALL BE INSPECTED AFTER EVERY PRECIPITATION EVENT. ANY NECE55ARY REPAIR WILL BE MADE IMMEDIATELY. 2. ACCUMULATED SEDIMENTS WILL BE REMOVED AS REQUIRED TO KE II�Q�YC,G2EMOVE DEPOSITS WHLi3@ A13NIULf��N1`�1BROUND HE16HT O"te fqAZVtANrED DRAINAGE SY5TEMS, 1-800-133-9464 3. ALL UNDERCUTTING OR ER05ION OF THE TOE ANCHOR WILL BE REW11INE0 la}AGGiFBAi£15t�lATERIALS. 4. ADHERE TO ANY MANUFAGTURER'5 RECOMMENDATIONS FOR REPLAGIN6 FILTER FABRIC FENCE DUE TO WEATHERIN6. INLET PROTECTION I. FILTERS SHALL BE INSPECTED AFTER EVERY PRECIPITATION EVENT. 2. FILTERS SHALL BE REMOVED WHEN GLO66ED WITH SEDIMENTS. MATERIALS MUST BE WASHED COMPLETELY FREE OF ALL FOREIGN MATERIALS OR NEW FILTERS INSTALLED. IT SHALL BE THE RE-SPON51BILITY OF THE CONTRACTOR TO MAINTAIN THE ROOF DRAINS AND THE SEDIMENT STRUCTURES DURING CONSTRUCTION. ADDITIONAL ER05(ON AND SEDIMENTATION CONTROLS SHALL BE INSTALLED WHERE NECESSARY` OR WHERE DIRECTED BY CITY OF LITTLE ROCK, OR ADEQ AS CONSTRUCTION PROGRESSES. ALL INSPECTIONS MUST BE MADE AT LEAST TWICE A GALENDER WEEK. x€ ^i M 0 C_. X 4 C7 pli ER05ION CONTROL LEGEND GODE PRAGTIGE PLAN SYMBOL FR FILTER RING to **04 CLIENT COMMENTS ITALIAN RYE r i IP -5F SILT FENCE INLET PROTECTION LJ OP STORM DRAIN OUTLET PROTECTION 34% FP -51 TJR6ED AREA STABIL WIPERh1atE=Nr vE6ETATIOTtoN NTH NTH PS O MAY I TO JULY 15 STARR MILLET 100515 5F-1 SILT FENCE 61515 SO DISTURBED AREA STABILIZED WITH PERMANENT VEGETATION (500) O r. ST SEDIMENT TRAP ST TS DISTURBED AREA STABILIZED WITH TepoRARY VEGETATION TS O EROSION AND SEDIMENT CONTROL NEP5URE5 SHALL COMPLY WITH THE REGIJIREMENT5 5ET FORTH Br THE THE ARKANSAS DEPT. OF ENVIRONMENTAL QUALITY. GRAPHIC SCALE 15 30 60 ( IN FEET ) I inch = 30 ft SFS. u�3..♦ 0, r 'Y n4eY IT a � WenN HryhG k —SITE LOCATION MAP— NOT TO SCALE ZONING: 0-3 GENERAL OFFICE WITH CONDITIONAL USE (CASE #Z-6240-13) 5EEDIN6 DATE5 6RA55 SEED PERGENTA6E5 CLIENT COMMENTS ITALIAN RYE 33% JAN I TO MAY I KOREAN LE5PEDEZA 33% #10 01/03/0a SUMMER OATS 34% MAY I TO JULY 15 SUDAN - 5ORGHUM 100% MAY I TO JULY 15 STARR MILLET 100515 JUL 15 TO JAN I BALBOA RYE 61515 ppGG .M�jpA m ITALIAN RYE 55% ti .. r. 20 a TENNESSEE ESIGN and _NG.INEERING 1 NC ARCHITECTS STRUCTURAL AND CIVIL ENGINEERS 5105 Maryland Way Suite 200 Brentwood ,Tennessee 3 702 7 615-370-1779 fax: 370.9108 www.dandeinc.us 7 J V Q A04 V) t� v , ® Cie U <( W � Z U O® J W F— / J Job Number: 67-0050 Revisions: 05 10/01/07 CLIENT COMMENTS #6 10/04/07 CLIENT COMMENTS #7 10/26/07 CITY COMMENTS #a 11/06/07 CITY COMMENTS #q 11/27/07 ELEC. CO. 00MNgNT5 #10 01/03/0a CLIENT COMMENTS #II 02/07/015 CITY C XfHE fTS #12 02/21/06 J' An 4� ppGG .M�jpA m 7 J V Q A04 V) t� v , ® Cie U <( W � Z U O® J W F— / J Job Number: 67-0050 Revisions: 05 10/01/07 CLIENT COMMENTS #6 10/04/07 CLIENT COMMENTS #7 10/26/07 CITY COMMENTS #a 11/06/07 CITY COMMENTS #q 11/27/07 ELEC. CO. 00MNgNT5 #10 01/03/0a CLIENT COMMENTS #II 02/07/015 CITY C XfHE fTS #12 02/21/06 CITY COMMENTS