HomeMy WebLinkAboutZ-6214 Staff AnalysisFILE NO.: Z-6214
NAME: HIGHLAND PARK PRD
LOCATION: Southeast of the intersection of Jonesboro and West
12th Street
DEVELOPER:
McCormack Baron and Assoc., Inc.
Hadley Square
1101 Lucas Avenue
St. Louis, MO 61301-1179
AREA: 34.94 ACRES
ZONING: Multifamily
NUMBER OF LOTS: 1
PROPOSED USES:
PLANNING DISTRICT: #9 1-630
CENSUS TRACT: 18
VARIANCES REQUESTED: None
BACKGROUND:
ENGINEER:
Tom Fennell
Fennell-Purifoy
111 Center Street
Suite 1520
Little Rock, AR 72201
FT. NEW STREET: 0
Multifamily Residential
This site is the former Highland Court housing development. The
property is owned by the Housing Authority of the City of Little
Rock.
A. PROPOSAWREQUEST:
A one lot 292 unit multifamily housing development on
approximately 35 acres. A portion of the site is reserved
for future single family residential development.
B. EXISTING CONDITIONS:
The tenants have been out of the existing structures for
some time. Some of the units were donated to nonprofit
organizations who will relocate them to new sites. The
remainder will be demolished and the land cleared.
C. NEIGHBORHOOD COMMENTS:
Staff has received a number of calls from adjacent land
owners seeking information on this development.
FILE NO.: Z-6214 (Cont.)
D. ENGINEERING COMMENTS:
PUBLIC WORKS COMMENTS:
Public Works records indicate that there are existing
platted and accepted public rights-of-waY within the bounds
of Highland Park that would require closure prior to
rededication of streets rights-of-way in construction of
this project. Special Programs notes that all new street
names must be approved by David Hathcock, Public Works
office. NPDES and grading permits are required prior to
construction, a site grading and drainage plan will need to
be submitted and approved. West 12 th Street is a minor
arterial on the Master Street Plan, four lane construction
is required, five lanes at major intersections, right-of-way
is required to be 70 feet, 35 feet from centerline, 80 feet
at major intersections. Due to the density of this
development and the new street, Street th A as it is shown on
the plan, staff recommends widening 12 Street to provide
f or a lef t turn lane on 12th Street into this development
with an improvement of right-of-way from 35 to 40 feet to
provide for the th appropriate tapers and left turn stack
storage from 12 Street into this new street designated as
Street A. There currently exist a 4 foot sidewalk on West
12th Street, current ADA standards require that this sidewalk
have passing zones at 200 foot intervals. Appropriate
handicap ramps at each intersection will be required, all 4
foot walks in the subdivision should have passing zones at
200 foot centers per current ADA standards. The developers
should do an analysis for stormwater detention and look at
the density of impervious areas for this development versus
what was existed prior and any increase in runoff should be
accounted for in a Stormwater Management plan. All drainage
that flows through this site and all street designs should
be submitted for approval. All driveways shall be concrete
aprons per City ordinance, all public street standards
should be met as noted on the plan, there does appear to be
conflict with current standards and we will note those as
follows:
1. The two small cul-de-sacs shown on the north end of
this development are not per City standards. They are
30 feet versus 40 feet in radius and the right-of-way
is shown to be 38 feet verses a 50 foot right-of-way
radius per City standards for cul-de-sacs. Due to the
length of these streets, if these cul-de-sacs are
acceptable to the Fire department, they are acceptable
to staff, but a variance would need to be requested.
2. The new street noted Jefferson, in a 50 foot right-of-
way is shown to be 28 feet wide, 29 foot back of curb
to back of curb. At the southern end of this street
there is a reverse curve and the radii do not meet
residential street standards. Recommend improving the
2
FILE NO z-6214 (Cont.)
radii for these streets to the 150 foot centerline
radius as required by city ordinance and the Master
Street Plan and provide the tangent distance between
the reverse curves as required by City ordinance to be
50 feet.
3. Street A shows a radius less than a 150 feet,
recommend increasing this radius to 150 feet in both of
the curves shown. Plan indicates a 20 foot pavement
each side of a 16 foot median for Street A, on the
southern portion of the median area. Then it
transitions to a 20 foot median with 18 feet of
pavement on each side. Staff recommends holding the 20
foot pavement area with the 16 foot median consistent
through -out, rather than reducing it, we still
recommend widening to the 25 foot back of curb to back
of curb to provide for the left turn lane. The 20 foot
dimension throughout provides for 8 foot of parking on
the street and 12 foot drive lane. All islands should
be held back from the intersection and bullet nosed to
provide for a smoother transition of vehicles turning
around these islands. There are many corner radii
shown at the street intersections that do not indicate
City standards, recommend increasing these corner radii
from 20 to a minimum of 25 feet, curb radiuses at
collector streets are to be 31 % feet and therefore
radius for Street A at intersection with 12 th Street
The curb radius shown just to the southwest of the
intersection of Street A and new street C should be
increased considerably beyond the 25 foot radius,
recommend probably a 50 foot radius for this turn, due
to the nature of the turn.
4. Staff would recommend that the 29 foot street be used
with parking on one side only, if parking is planned on
both sides of these streets, then we would recommend
going to a 36 foot street. That would allow for two 10
foot drive lanes and two 8 foot parking spaces with the
current 28 foot street or 29 foot street it would allow
for a 8 foot parking space and two 10 foot drive lanes
( minimum acceptable). All parking should be
restricted according to sight distances at the
intersections.
E. UTILITY/FIRE DEPARTMENT/COUNTY PLANNING
Wastewater: Sewer main out fall relocation is required.
sewer main extension required to serve new residences.
utility review continuing at this time.
Arkla: No comment
Southwestern Bell: No comment erve this area
Water: installation of new facilities to S
will be required. Approval of fire protection
facilities by Fire Department.
AP&L: No comment
FILE NO.: z-6214 (Cont.
Fire Department: No comment
Count Plannin : No comment
F. ISSUES/TECHNICAL�DESIGN:
Lanq2gape:
The land use landscape buffer along the western perimeter of
the site drops to a width of only four and a half feet. The
minimum required is six feet in width. A six foot high
opaque screen, either a wood fence with its face directed
outward or dense evergreen plantings, is required along the
western perimeter to screen this site from the single family
zoned property to the west.
If the dumpsters are to be used, they should be located on
the plan and screened on three sides with an eight foot high
wood fence or wall.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
Screening would normally be required to screen the
multifamily areas from those that are single family,
however, if this site is to be another approach would be
appropriate. This development is required to comply with
the Landscape ordinance. Therefore, trees and shrubs will
be required in association with all on site vehicular use
areas.
Issues:
a Reference letter from Tom Fennell dated November 7, 1996.
planning DivisiOn:
No land use issues.
G. ANALYSIS:
The proposal is consistent with the Land Use Plan
designation of multifamily residential. The project
architect has answered all outstanding questions from
Subdivision Committee departmental comments.
H. STAFF RECOMMENDATIONS:
APPROVAL of the PRD (Z-6214) as illustrated on the proposed
site plan. The approval is subject to conditions outlined
in paragraphs D, E, and F of this report.
4
FILE NO.: Z-6214 (Cont.)
SUBDIVISION COMMITTEE COMME : (OCTOBER 31, 1996)
Tom Fennell and Polly Kinslowe presented the project to the
Committee. There were several questions concerning the phasing
of the development. Mr. Fennell indicated he would submit a
letter addressing staff corners by November 7, 1996.
The item was referred by the Committee to the Planning Commission
for determination on November 21, 1996.
PLANNING COMMISSION ACTION: (NOVEMBER 21, 1996)
Larry Jones presented the proposed rezoning to the Commission.
Mr. Jones distributed a letter from Tim Polk, Director of the
City of Little Rock Department of Housing and Neighborhood
Programs in support of the project. Mr. Jones indicated that
staff had received a number of calls from persons opposed to this
rezoning. Tom Fennel, project architect, explained how this site
will be developed.
Rohn Muse, President of the Forrest Hills Neighborhood
Association, requested that the item be deferred to allow input
from neighborhood groups impacted by the project. Commissioner
Daniel asked a question concerning the total number of units.
Mr. Lawson replied that the proposed density was less than the
previous Highland Court development. commissioner Adcock asked
about the rental mix proposed. Polly Kinslowe responded that 1/3
of total units will be -public housing-. commissioner Adcock
objected to the proposal for a -out of state owner" and operator
for Highland Park. Ms. Kinslowe stated that McCormack Baron and
Associates, Inc. had good relations with City's in which they
have projects. Rick Taylor, City Housing Authority consulting
attorney explained the relationship between the various partners
in the development in response to a question from Commissioner
Lichty.
A motion to approve the proposed rezoning to PRD subject to the
conditions in the staff report and the letter from Fennell
Purifoy Architects dated November 7, 1996. Motion passed with
8 ayes, 1 nay and 2 absent.
5