Loading...
HomeMy WebLinkAboutZ-6141 Map 5FOUNDATION PLAN - SHELTER SLAB (nts) 10" WAVEGUIDE BRIDGE PLAN (NTSI 1'-8" l'-8 SPACER -1 __L CONCRETE TO FORMED TC HEIGHT OF TOWER FOUND. ELEVATION (NTS` ELECTRICAL POWER POLE — PER DETAIL 'G' THIS SHEET SEE SHEET 2.1 FOR LOCATION (METER TO BE READABLE THRU FENCE) 3'-8" SUPPORT BRACKET FOR i" COAX SECTION A -A (NTS) 4-/4 EACH WAY TYP. ?X12" Q cl TYPICAL WAVEGUIDE BRIDGE FOUNDATION t2.-. (nts) 8'-0" 16'-0" SWALE DITCH MINIMUM 1'-0' DEEP W/ 3:1 3" CROWN SIDE SLOPES 3:1 SLOPE TO SCOPE DOWN I I EXISTING GROUND �SUBGRADE 6" CRUSHED STONE BA ECOURSE EXISTING GROUNDCOMPACTED TO 95% MODIFIED PROCTOR DENSITIES DTE. ALL CRUSHED STONE COURSES SHALL BE COMPACTED TO 95% MODIFIED PROCTOR DENSITIES. TYPICAL ROADWAY SECTION iMd 1' DIA. 1' DIA. 12' GATE �3' GATE r-- —6' GATE SECURITY FENCE DETAILS (NTSI AE AS iNER POST MONOPOLE TOWER COMPOUND PLAN SHEET NC 16.10 Intel FINISH GRADE ATT..... ............ LEAD TO GROUNDING SYSTEM PER PLAN EQUIPMENT GROUND DETAIL Ints) ELEVATION NOTE: SEE SHEET 18.38 FOR ADDITIONAL FOUNDATION GROUNDING DETAILS. TIE WIRE EACH CROSSING POINT (28 TIES) USE /2 COPPER FOR CONCENTRIC -- SUPPORT RINGS 8" APART NOTE: TYPICAL OF ALL LEGS PLAN VIEW FOUNDATION GROUNDING FOR SELF SUPPORTED/MONOPOLE SHEET NO. 16.3A (ntsl ALL DETAILS ARE PER THE STANDARD SPRINT STV TOWER SITE FACILITY SITE PREPARATION AND CONSTRUCTION MANUAL GENERAL NOTES: 1. CONTRACTOR SHALL PROVIDE I2 SU•.ID TINNED COPPER CENTERLINE ACCESS ROAD d WIRE GROUNDING LEADS PER SPECS AT LOCATIONS MIN. 12" COVER OF COMPACTED 5 INDICATED ON PLAN ALL LEADS TO BUILDING SUBGRADE MATERIAL OVER TOP SIDE SLOPE OF SIDE GROUND SUBSYSTEM HALO GROUND LOOP SHALL BE OF CULVERT UND ARO RIP -RAP AROUND RAP DITCH (IF PRESENTI EXTER R BLDG. PART OF THE HALO GROUND SYSTEM AND SHALL BE FLARED END SECTION 7 GROUNC BAR ATTACHED TO THE TOWER, SHELTER AND FENCE UPON PER DETAIL "D' COMPLETION OF THEIR CONSTRUCTION. ALL UNDER - INDICATES DIRECTION SHELTER GROUND LEAD— 8 6 THIS SHEET GROUND LEADS TO BE BURIED 2'-8' DEEP PER SPECS. RIP -RAP TO REDISTRIBUTE FLOW OF DRAINAGE FLOW MAX. SEE DET. 'E" THIS SHEET LENGTH OF LEADS TO BE FIELD DETERMINED. (UNLESS EXISTING DITCH IS PRESENT) l I �10' NOTE: SCHEMATIC ONLY TYP) 2, PROVIDE GROUNDING LEAD FROM INTERIOR HALO 11 SEE SHEETS 2.1 6 d FOR AND LOCATION OF TOWER GROUNDING RING AT EACH CORNER OF SHELTER. I! REO'DI FL OF EXISTING EXTENSION ARM 6 AND EQUIPMENT SHELTER 3. PROVIDE GROUNDING LEAD FROM TOWER MOUNTED GROUND FLARED END SECTION DITCH (IF PRESENT) J STRANDS BARBED WIRE BAR (1 REO'DI FLARED END SECTION To COMPACT TO 96% ITOE'PILATE 3. 2 9 !. PROVIDE GROUNDING LEAD FROM EACH CORNER OF TOWER. ULVERT AS SIZED ON PLAN IS GA. POLYMER COATED PROCTOR AROUND _ 1 (3 REO'Al CORRUGATED METAL PIPE 02 SOLID TINNED WIRE. MEGGER 1.680 O.D. TOP RAIL TESTED TO OBTAIN 5 OHMS OR 5. PROVIDE GROUNDING LEAD FROM POWER POLE (1 REO'DI LESS. RESULTS TO BE PROVIDED AT '°DX CONSTRUCTION COMPLETION.TYPICAL 5/8" X 6'-0" GROUND ROD PER S. PROVIDE GROUNDING LEAD FROM WAVE GUIDE BRIDGE SECTION T H R U CULVERT ILENGTH AS REOUIREDI SPECS AT 6'-0" O.C. MAX. DRIVE ATTACH TO WAVE GUIDE SUPPORTS AS REO'D (1 REO'D) 2'-8" MIN BELOW GRADE TYPICAL (nts) \, ,r 7. PROVIDE GROUNDING LEAD FROM 200A PANEL BOARD - (1 REO'D) BRAIDED COPPER 6. PROVIDE GROUNDING LEAD FROM INTERIOR MASTER GROUND -1.68D OU. POST BRAOE 16' d CVERI STRAP AT GATE BAR. It REO'DI 1.860 O.D. �" '� PER SPECS CENTER RAILir'�+ CE6 CE — 9. PROVIDE GROUNDING LEAD TO EACH CORNER FENCE POST. OVER) ;. (10'(4 � REO'DI j ill 10. ATTACH RADIALS AT EACH CONNECTION SHOWN TO THE HALO LOOP. EXTEND EACH RADIAL 75'-0" OR TO THE LIMIT OF FER BRIDGE LEAD THE PROPERTY LINE EVER COMES FIRST). GROUND EACH II VII) r CAD WELD /2 COPPER TO l%S' TRUSS RO 1JI I S ET RADIAL TO EACH FENCECE PO POST IN ITS PATH. TOWER LEG --SII III / TOWER LEG BASEPLATE r. 6 OVER? . 11 BELOW FINISHGRADE 1' DIA. 1' DIA. 12' GATE �3' GATE r-- —6' GATE SECURITY FENCE DETAILS (NTSI AE AS iNER POST MONOPOLE TOWER COMPOUND PLAN SHEET NC 16.10 Intel FINISH GRADE ATT..... ............ LEAD TO GROUNDING SYSTEM PER PLAN EQUIPMENT GROUND DETAIL Ints) ELEVATION NOTE: SEE SHEET 18.38 FOR ADDITIONAL FOUNDATION GROUNDING DETAILS. TIE WIRE EACH CROSSING POINT (28 TIES) USE /2 COPPER FOR CONCENTRIC -- SUPPORT RINGS 8" APART NOTE: TYPICAL OF ALL LEGS PLAN VIEW FOUNDATION GROUNDING FOR SELF SUPPORTED/MONOPOLE SHEET NO. 16.3A (ntsl ALL DETAILS ARE PER THE STANDARD SPRINT STV TOWER SITE FACILITY SITE PREPARATION AND CONSTRUCTION MANUAL