HomeMy WebLinkAboutZ-6129-F Map 4NOTE
THE TOWER DRAWING IS ONLY A
GRAPHIC REPRESENTATION OF THE
STRUCTURE. THE ACTUAL TOWER IN
THE FIELD MAY VARY.
1
a
In
z
n w
LiJ,._
CD
LL
O (Y
CY_ LW
a.
PROPOSED T—MOBILE ANTENNAS
SECTOR CONFIGURATION
RAD. CENTER = 158'
COORDINATE WITH T—MOBILE &
SBA CONSTRUCTION MANAGERS
FOR TOWER EXTENSIONS (OR
HEAD MOUNT)
EXISTING ANTENNAS
RAD. CENTER = 149'
EXISTING ANTENNAS
RAD. CENTER = 137'
EXISTING ANTENNAS
RAD. CENTER = 125'
PROPOSED FUTURE T—MOBILE LMU ANTENNAS
RAD. CENTER = 110'
TOWER NOTES
1. FOR DETAILED TOWER
INFORMATION REFER TO TOWER
ERECTION DRAWINGS BY OTHERS.
THE TOWER ON THIS SHEET IS
SHOWN FOR GENERAL
CONFIGURATION PURPOSES ONLY.
EXISTING 150' 2. ANTENNA CONFIGURATION IS
MONOPOLE TOWER SUBJECT TO CHANGE. VERIFY
ANTENNA HEIGHT, DOWN TILT, AND
AZIMUTH WITH PROJECT MANAGER
PRIOR TO CONSTRUCTION.
3. A STRUCTURAL TOWER
ANAYLSIS SHALL BE PERFORMED
BY A LICENSED ENGINEER TO
VERIFY THE ADEQUACY OF THE
TOWER AND FOUNDATION PRIOR TO
THE INSTALLATION OF THE
PROPOSED ANTENNAS AND
APPURTENANCES. NO
MODIFICATIONS OF TOWER SHALL
BE MADE WITHOUT APPROVAL OF
STRUCTURAL ENGINEER.
GPS ANTENNA WITH 1/2" COAX
MOUNT 10' ABOVE GRADE WITH
UNOBSTRUCTED EXPOSURE TO
THE SOUTH.
CABLE BRIDGE
—T—MOBILE
CITYTALK
EQUIPMENT
1 TOWER ELEVATION
C-3 SCALE: NTS
ANTENNA PIPE
TNA/LNA COMBINER
(OUTLETS TO FACE
DOWN—VERTICAL,
#6 SHIELD
(MECHANICAL
GROUND VIA ROUND
MEMBER ADAPTER)
No. 6 STANDARD
GREEN INSULATED
GROUND WIRE TO
UPPER ANTENNA
GROUND BAR (2
HOLE LUGS EA. END)
JUMPER TO BE SECURED
WITH 1/2" ANDREWS
BUTTERFLY HANGERS
W/1" STANDOFFS
1/2" COAX JUMPER
(MAX. LENGTH 4')
TRANSMISSION
nrMAINI T T ACCGAADV " EQUIRED FOR
ENNAS
AND
RF
ROJECT
LINES TO BTS JN.
MIN.
BIPOLAR PANEL ANTENNA
2 AND LNA MOUNTING DETAIL
k C-3 SCALE: NTS -3 SCALE NTS
BACK OF
ANTENNA
PORT 1 PORT 2
SLANT LT SLANT RT
M M
1/2 1�-1/3,,
d
F
� LNA
F
�M
3'— 1/2"
F
—M
BACK OF
ANTENNA
PORT 1 PORT 2
SLANT LT SLANT RT
M M
1 /2'
112"
3' —
F—
LN,A 6,
F ---
M_
1 /2' — 3'
F--�' i F
M — —M
DUAL POLE EMS ANTENNA LAYOUT
SCALE: NTS
NOTE: DETAIL FOR SECTORS A (RED), B
(YELLOW), AND G (BLUE) USING 12 LINES.
(EXAMPLE SHOWN IS FOR SECTOR ONE)
(3 BLUE)
(1 BLUE)
DIVERSITY
(4 RED) (2 RED)
L MAIN
A�1
(6 BLUE)
(5 BLUE)
FUTURE J
(2 BLUE)
(4 BLUE)
MAIN
(5 RED) (6 RED)
LFUTUREJ
(1 RED) (3 RED)
*A 3
SECTOR 1 DIVERSITY (4 YELLOW)
ALPHA 0° A 2
(T (2 YELLOW)
240° ICA() SECTOR 2 L MAIN
BETA
w 120°
SECTOR 3
GAMMA
!,>,5 (5 YELLOW)
(6 YELLOW)
—FUTURE
(3 YELLOW)
(4 YELLOW)
L— DIVERSITY
3 ATYPICAL ANTENNA PLAN
C-3 JSCALE: NTS
�/ NOTE:
ALL AZIMUTHS ARE REFERENCED
TO MAGNETIC NORTH.
ANTENNA
AND COAXIAL CABLE SCHEDULE
ANTENNA
MARK
ANTENNA
AZIMUTH
RAD
CENTER
COAX CABLE
LENGTH**
COAX CABLE
MECHANICAL
DOWNTILT
A-1
RR65-19—OODP
0°
158'
188'
(2) 1 5/8" 0
0°
A-2
RR65-19—OODP
0°
158'
188'
(2) 1 5/8" 0
0°
A-3*
RR65-19—OODP
0°
158'
188'
(2) 1 5/8" 0
0°
B-1
RR65-19—OODP
120°
158'
188'
(2) 1 5/8" 0
0°
B-2
RR65-19—OODP
120°
158'
188'
(2) 1 5/8" 0
0°
13-3*
RR65-19—OODP
120'
158'
188'
(2) 1 5/8" 0
0°
C-1
RR65-19—OODP
240°
158'
188'
(2) 1 5/8" 0
0°
C-2
RR65-19—OODP
240°
158'
188'
(2) 1 5/8" 0
0°
C-3*
RR65-19—OODP
240°
158'
188'
(2) 1 5/8" 0
0°
LMU-1 *
TBD
TBD'
110
140'
(2) 112" 0
01
LMU-2*
TBD
TBD'
110'
140'
(2) 1/2" 0
0°
* FUTURE ANTENNAS
TOTAL LENGTH = TBD' ** ESTIMATED LENGTH — CONTRACTOR
TO VERIFY
ANTENNA SCHEDULE
t)UALE: N I S
COAX CABLE INDENTIFICATION
NOTE:
CONTRACTOR MUST PROVIDE EASY IDENTIFICATION AND UNIFORM MARKING
OF ANTENNA LABELING, PER THE FOLLOWING INSTRUCTION.
1. LOCATION: MARKINGS SHALL BE MADE USING COLOR TAPE W/3" OF
COVERAGE AFFIXED AT THREE PLACES ON THE COAX CABLE RUN AS FOLLOW:
FIRST — ON THE COAX AT THE CONNECTOR NEAREST THE ANTENNA
(WHERE THE COAX AND JUMPER ARE CONNECTED)
SECOND — AT THE BASE OF THE TOWER STRUCTURE (FOR TOWERS ONLY)
THIRD — AT A POINT OUTSIDE THE BTS (JUST PRIOR TO MOB)
2. SECTOR IDENTIFICATION: NORMALLY A SITE WILL HAVE UP TO THREE SECTORS.
SECTORS SHALL BE DESIGNATED IN A CLOCKWISE MANNER; THE ALPHA SECTOR IS
CLOSEST TO ZERO DEGREES (NORTH), THE BETA AND GAMMA FOLLOW CLOCKWISE
IN SEQUENCE.
ALPHA SECTOR — RED
BETA SECTOR — YELLOW
GAMMA SECTOR — BLUE
CartermommBurgess
CARTER & BURGESS, INC.
Brookfield Corporate Center
201 Brookfield Parkway
Suite 200
Greenville, S.C. 29607
(864) 329-8500
.........................
A�AA�� (ATE 0"
AR AS
_ 444s W �p l� 0118�
tin°
OF AUTy,,�.
li CARTER do
:1 BURGESS D
ly- No. 68
r••••••r1eVS_4SLU
ee ••••••
1
U) LU
4 Z
p �r
r
rr
ZW�L
_j J 0 �
0rJQao
c a v
T" m r >
m.,. W
�QIW--U0tQn
J
Z �oJ�
�a
1Aj O J
a T
m
C&B JOB NUMBER:
350099.061.1
DATE ISSUED:
10/04/02
INITIAL ISSUE
ISSUES/REVISIONS:
AA ISSUED FOR REVIEW 10/01/02
0 INITIAL ISSUE 10/04/02
SHEET CONTENTS:
TOWER ELEVATION
AND ANTENNA
DETAILS
SHEET NUMBER:
C-3
0.0 COPYRIGHT® 2002 by Carter 6 Burgess, Inc
lNd L489 tr ZOltrlD G - B Il D - M - ,.