Re: File No. Z-4807-V
Discount Tire — Conditional Use Permit
Dear Mr. Vasquez:
This is to advise you that in connection with your request concerning the above
referenced file number the following action was taken by the Planning Commission at
its meeting on August 10, 2023:
X Approved with conditions.
Recommended approval with conditions.
Recommended approval as submitted.
Denied your request as submitted.
Deferred to the Meeting.
Other:
If you have any questions please do not hesitate to contact me at 371-4792.
Respectfully,
mootmootd MoorEr
Development Administrator
August 10, 2023
ITEM NO. 3
NAME: Discount Tire — Conditional Use Permit
LOCATION: West of 16100 Chenal Parkway
DEVELOPER:
Riverside Properties, LLC
P.O. Box 3157
Little Rock, AR 72223
OWNER/AUTHORIZED AGENT:
Riverside Properties, LLC — Owner
Vasquez Engineering — Agent
SURVEYORIENGINEER:
Vasquez Engineering, LLC
1919 S. Shiloh Road, Suite 440
Garland, TX 75042
AREA: 1.64 acres NUMBER OF LOTS: 1
WARD: 5 PLANNING DISTRICT: 19
CURRENT ZONING: C-3
VARIANCEIWAIVERS: None requested.
A. PROPOSALIREQUESTIAPPLICANT'S STATEMENT:
FILE NO. Z-4807
FT. NEW STREET: 0 LF
CENSUS TRACT: 42.16
The applicant is requesting a conditional use permit to allow a new retail tire store on
the C-3 zoned property west of 16100 Chenal Parkway.
B. EXISTING CONDITIONS:
The property is undeveloped and mostly grass covered. The property generally
slopes downward from north to south, and east to west.
August 10, 2023
ITEM NO.: 3 Cont. FILE NO.: Z-4807-V
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property located within 300 feet of the site and all neighborhood
associations registered with the City of Little Rock were notified of the public hearing.
D. ENGINEERING COMMENTS:
1. Provide finished floor elevations (FFE) for all buildings on site plan and grading
and drainage plans.
2. Provide accessible route from the public right of way to the proposed building
entrance in accordance with 2021 Arkansas Fire Prevention Code Section
1104.1.
3. Van accessible stall shall be eleven (11) foot minimum wide with a five (5) foot
wide minimum accessible aisle per ICC a117.1.
4. A grading permit might be required prior to initiation of work. Grading permits
are issued by the Planning and Development Dept. at 723 West Markham
Street after approval of sediment and erosion control plans, grading and
drainage plans, land survey, drainage study, and soil loss calculations per
City's stormwater management and drainage manual. Contact Planning and
Development Dept., Engineering Division at 501-371-4817 or at 501-918-5348
or Permits littlerock. ov to schedule an appointment for issuance or to
answer any questions. Permit cost is based on total project area at $100.00 for
the less than '/2 acre, $200.00 for'/z to 1 acre, and $200.00 for the first acre
and $100.00 for each additional acre for project greater than 1 acre.
5. Any work involving one (1) or more acres of disturbed area requires a State of
Arkansas NPDES permit. Contact the Arkansas Department of Environmental
Quality, NPDES branch at 501-682-0744 for applications and information
about General Stormwater Discharge Construction Permit #ARR150000.
6. Provide as -built plans and data entry template of newly installed or modified
public and private stormwater drainage system prior to issuance of the
certificate of occupancy. The as -built plans should contain information
as found on the City of Little Rock website at htt s://www.littlerock. ov/cit -
administration/cit -de artmentsl ublic-works/a lications-details-and-
manuals/. Provide the as -built plans and data entry template to Planning and
Development Dept., Civil Engineering Private Development by email to
csmith@littlerock.gov and cc dwarner@littlerock.gov. If you have any
questions or desire additional information, please do not hesitate to contact
Planning and Development Dept., Engineering Division at 501-371-4817 or at
501-918-5348 or email Permits@Iittierock.gov.
7. Any infrastructure within public right of way that is currently damaged or
damaged during construction will be repaired or replaced at developer's
expense before a final certificate of occupancy can be released for the building.
2
August 10, 2023
ITEM NO.: 3 Cont. FILE NO.: Z-4807-V
This includes but not limited to the following: noncompliant curb and gutter,
asphalt, sidewalk, accessible ramps, storm drainage infrastructure, or concrete
driveway aprons. All work within the public right-of-way shall conform to City of
Little Rock Public Works Standard Details and ADA accessibility requirements.
8. A drainage study showing all hydrologic and hydraulic calculations for the
proposed storm sewer pipe system, detention ponds and structures, and inlets
is required. For final drainage report, sign, date, and seal the report per AR
State Board of Professional Engineers and Professional Surveyors rules Article
12, Section B (1) (a). Provide engineer's certification statement saying this
drainage report was conducted by yourself or directly under your supervision
and attesting to the accuracy of the information within this report.
9. Per City Rev. Code 29-99, stormwater detention for developments is required.
Provide stormwater detention infrastructure to satisfy this requirement.
10. The Department requires three (3) phase sediment and erosion control (SEC)
plans to be submitted for all construction projects showing best management
practices (BMPs) for mitigating sediment runoff and erosion along with
vegetation specifications for temporary and permanent soil stabilization.
Phase 1 SEC plans shall show SEC BMPs during the stripping, clearing,
grubbing, and rough grading of the site. Phase 2 SEC plans shall show SEC
BMPs during construction of utilities, buildings, roadway infrastructure and
drainage infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final
grading, seeding, and landscaping of the site.
11. Sediment and Erosion Control plans shall also show the pertinent information
as outlined in ADEQ ARR150000 Permit Part II section A-4-1-1 (1-14) and Part
II section A-4-1-2 (A-B).
12. If proposed retaining walls shown on plans are equal to or above four feet tail
measured from the bottom of the footing or leveling layer or if there is surcharge
loading for a retaining wall less than four feet tall measured from the bottom of
the footing or leveling layer, the Department requires retaining wall design
plans by an Arkansas licensed professional engineer showing plan, profile, and
cross sectional views of the wall with special details, design loading
calculations clearly showing all required factors of safety are met or exceed per
state building codes. A separate building permit- accessory structure will be
required for the retaining walls along with inspections by Department
engineering staff during their construction.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authorit : Submit the wastewater infrastructure
plans (including the oil/water separator) to LRWRA for review and approval_
Enter : No comments received.
3
August 10, 2023
ITEM NC.: 3 Cont. FILE NO.: Z-4807-V
Summit Utilities: No comments.
AT & T: No comments received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
The facilities on -site will be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's material and construction
specifications and installation will be inspected by an engineer, licensed to practice
in the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZ) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water
(CAW) requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by CAW. The test results must be sent to CAW's Cross Connection
Section within ten days of installation and annually thereafter. Contact the Cross
Connection Section at 377-1226 if you would like to discuss backflow prevention
requirements for this project.
Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives are used, a reduced
pressure zone backflow preventer shall be required.
-19
August 10, 2023
ITEM NQ.: 3 Cont. FILE NO.: Z-4807-V
Fire Department:
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of
the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width
with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the
minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief. If the grade
exceeds 10 percent, approval will be denied and the applicant must submit
request to be reviewed by Fire Chief for Approval.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2021 Arkansas
Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an
asphalt, concrete or other approved driving surface capable of supporting the
imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix ❑ of the 2021 Arkansas Fire Prevention
Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two means
of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be provide
with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square feet
that have a single approved fire apparatus access road when all building are
equipped throughout with approved automatic sprinkler systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they shall
be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured in a
straight line between accesses.
August 10, 2023
ITEM NO.: 3 Cont. FILE NO.: Z-4807-V
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2021 Arkansas Fire Prevention
Code. Section C101 — C105, in conjunction with Central Arkansas Water (Daniel Tull
501-377-1245) and the Little Rock Fire Marshal's Office (Capt. Tony Rhodes
501-918-3757, or Fire Marshal Derek N. Ingram 501-918-3756 Number and
Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comments received.
County Planning: No comments received.
F. BUILDING CODES/LANDSCAPE:
Building Code: No comments received.
Landscape: The Landscape Plan, as submitted, is acceptable. However, please
make note on the plan that all shrubs are to be a minimum of 18 inches in height at
installation. The nandina is listed as 12 inches in height.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments received.
Planning Division: No comments.
H. ANALYSIS:
The applicant is requesting a conditional use permit to allow a new retail tire store on
the C-3 zoned property located west of 16100 Chenal Parkway. The applicant
submitted the following information on the project:
"Halle Properties, L.L.C. (Discount Tire Company) will be leasing an
approximate 1.64-acre tract just west of 16100 Chenal Parkway from
Riverside Properties, LLC. Discount Tire intends to develop the
property for an approximate 6,295 SF retail tire store with its
associated drives and parking areas. Discount Tire Company only
sells and mounts tire and wheels no other automotive mechanical
services are conducted. All work is conducted inside the building
and no used tires are stored outside or inside the dumpster
enclosure."
The proposed hours of operation will be as follows:
2
August 10, 2023
ITEM NO.: 3 (Cont.
FILE NO.: Z-4807-V
"Monday — Friday hours are 8:00 AM to 6:00 PM, Saturday hours are
8:00 AM to 5:00 PM, and Sunday the store is closed."
Section 36-502 (b) (3)g. of the City's Zoning Ordinance requires a minimum of 30
parking spaces for the proposed tire store use. A total of 34 parking spaces will be
located on the north, south and east sides of the proposed building. The proposed
parking complies with code requirements.
The proposed project will utilize the existing asphalt driveway from Chenal Parkway
which runs along the east property line and also serves the development to the east.
A dumpster area will be located at the northwest corner of the site. The dumpster
area must be screened as per Section 36-523 of the code.
The development will include a retaining wall which will be located along the north,
east and west perimeters of the site. The wall will range in height from four (4) feet
to 10 feet. The wall must be engineered and constructed to meet code requirements.
All site signage must comply with Section 36-349 (d) (1) (signs allowed in the Chenal
/ Financial Center Design Overlay District).
All site lighting must conform with Section 36-349 (d) (2) (lighting requirements for
the Chenal / Financial DOD).
To staffs knowledge, there are no outstanding issues associated with the proposed
conditional use permit application. The applicant is requesting no variances.
Staff is supportive of the requested conditional use permit to allow a tire shop at this
location. Staff views the request as reasonable, as this general area along Chenal
Parkway contains a mixture of commercial uses. The proposed use will not be out of
character with the general area.
STAFF RECOMMENDATION:
Staff recommends approval of the requested conditional use permit, subject to
compliance with the comments and conditions outlined in paragraphs D, E and F,
and the staff analysis, of the agenda staff report.
PLANNING COMMISSION ACTION: (AUGUST 10, 2023)
The applicant was present. There were no persons registered in opposition. Staff presented
the item and a recommendation of approval as outlined in the staff recommendation above.
The item remained on the consent agenda for approval as recommended by staff, including
7
August 10, 2023
ITEM NO.: 3 (Cont.)FILE NO.: Z-4807-V
all staff comments and conditions. The vote was 8 ayes, 0 nays, 1 absent and 2 open
positions. The application was approved.