Loading...
HomeMy WebLinkAboutPreliminary Drainage Report 040623PRELIMINARY DRAINAGE CALCULATIONS April 4, 2023 BASIN A 9.06 cfs BASIN B 0.08 cfs Pre-Development 25-Year Runoff 9.15 cfs BASIN A 9.20 cfs BASIN B 0.08 cfs Post-Development 25-Year Runoff (Uncontrolled)9.29 cfs 25 -Year Estimated Detention Volume Differential Runoff (25-year) → 12.16 - 9.19 = 2.97cfs 2.97cfs X 8 minutes (Tc Post) X 60 sec/min = 1,425.6 cf Detention Volume Required = 1,430 cf BASIN NAME BASIN DESCRIPTION BASIN AREA 1.84 ACRES BASIN GROUNDCOVER PERCENTAGE OF BASIN 25-YEAR RUNOFF COEFFICIENT WEIGHTED Drives and Walks 76% 0.91 0.69 Natural Vegetation, Clay Soil, Average Slopes (2-7%)24% 0.28 0.07 0.76 Longest Flow Path (Sheet)ft Average Slope of Longest FP Longest Flow Path (Shal. Conc.) Average Slope of Longest FP Time of Concentration*min. 25-Year Storm Rainfall Intensity**in/hr * Per City of Little Rock Drainage Manual Figure 2-2 using LFP and Slope ** Per City of Little Rock Drainage Manual Figure 2-5 Using TOC 25 - Year Storm Runoff (Q = CIA)cfs 6.5 9.06 Basin consists of most of the site except the part on the East side of the drive off of Sunnymeade Drive. BASIN PRE-A WEIGHTED RUNOFF COEFFICIENT 175 4.0% 13 244 2.0% BASIN NAME BASIN DESCRIPTION BASIN AREA 0.03 ACRES BASIN GROUNDCOVER PERCENTAGE OF BASIN 25-YEAR RUNOFF COEFFICIENT WEIGHTED Drives and Walks 32% 0.91 0.29 Clay Soil, Lawns, Average Slopes 2- 7%68% 0.28 0.19 0.48 Longest Flow Path (Sheet)ft Average Slope of Longest FP Longest Flow Path (Shal. Conc.)ft. Average Slope of Longest FP Time of Concentration*min. 25-Year Storm Rainfall Intensity**in/hr * Per City of Little Rock Drainage Manual Figure 2-2 using LFP and Slope ** Per City of Little Rock Drainage Manual Figure 2-5 Using TOC 25 - Year Storm Runoff (Q = CIA)cfs 2.0% 5 8.5 0.13 BASIN POST-B Basin consists of the part on the East side of the drive off of Sunnymeade Drive. WEIGHTED RUNOFF COEFFICIENT 24 2.0% 72 BASIN NAME BASIN DESCRIPTION BASIN AREA 1.84 ACRES BASIN GROUNDCOVER PERCENTAGE OF BASIN 25-YEAR RUNOFF COEFFICIENT WEIGHTED Drives and Walks 24% 0.91 0.22 Roofs 53% 0.92 0.49 Clay Soil, Lawns, Average Slopes 2- 7%23% 0.28 0.06 0.77 Longest Flow Path (Sheet)ft Average Slope of Longest FP Longest Flow Path (Shal. Conc.)ft. Average Slope of Longest FP Time of Concentration*min. 25-Year Storm Rainfall Intensity**in/hr * Per City of Little Rock Drainage Manual Figure 2-2 using LFP and Slope ** Per City of Little Rock Drainage Manual Figure 2-5 Using TOC 25 - Year Storm Runoff (Q = CIA)cfs 2.0% 5.5 8.5 12.04 BASIN POST-A Basin consists of most of the site except the part on the East side of the drive off of Sunnymeade Drive. WEIGHTED RUNOFF COEFFICIENT 560 3.0% 250 BASIN NAME BASIN DESCRIPTION BASIN AREA 0.03 ACRES BASIN GROUNDCOVER PERCENTAGE OF BASIN 25-YEAR RUNOFF COEFFICIENT WEIGHTED Drives and Walks 32% 0.91 0.29 Clay Soil, Lawns, Average Slopes 2- 7%68% 0.28 0.19 0.48 Longest Flow Path (Sheet)ft Average Slope of Longest FP Longest Flow Path (Shal. Conc.)ft. Average Slope of Longest FP Time of Concentration*min. 25-Year Storm Rainfall Intensity**in/hr * Per City of Little Rock Drainage Manual Figure 2-2 using LFP and Slope ** Per City of Little Rock Drainage Manual Figure 2-5 Using TOC 25 - Year Storm Runoff (Q = CIA)cfs 2.0% 8 8.5 0.13 BASIN POST-B Basin consists of the part on the East side of the drive off of Sunnymeade Drive. WEIGHTED RUNOFF COEFFICIENT 24 2.0% 72