Loading...
HomeMy WebLinkAboutZ-6092 Staff AnalysisJanuary 29, 1996 item 2 File Nos: Qwng Adargim: DegGriptipn• Zon d: Variance Rec[uested: Justification: Present Use of PronertY: PrQnQsed ❑se Qf Property: Staff Report• A. Public Works Issues: Z-6092 Theodore Curtis Bailey 5714 Scenic Drive Lot G -R, Block 3, East Palisades Addition R-2 variances are requested from the area regulations of Section 36-254 and the building line provisions of Section 31-12 to permit construction of a walkway addition with a reduced front yard setback and which crosses a platted building line. The lot drops away from the street. In order to have a level entry way from street level to the house, it is necessary to extend the raised walkway approximately 6.5 feet past the building line. Single -Family residence Single -Family residence The right-of-way for Scenic should be 50 feet versus platted 40 feet. Dedicate 5 feet of additional right-of-way. Driveway to be constructed allowing access to head -in parking shall be constructed such that the edge of drive is 5 feet from property line and the width of the driveway does not exceed 20 feet at the property line. The depth of this parking area should be such that 20 feet exists beyond the new right-of-way line. The retaining wall needs to be on the property side of the new right-of-way. The street may be widened to 13.5 feet from centerline and plans for this construction shall be submitted by a professional engineer. They shall include a sidewalk and taper approved by traffic engineering. Design of the retaining wall shall also be submitted for approval. January 29, 1996 item No B. C. ,5taff A Alygia: The owner of the home at 5714 Scenic Drive is proposing to remodel the house by converting the one car garage into the kitchen and by adding a deck onto the side of the house which will provide access into the new kitchen. The property slopes dramatically down from the street so that although the structure appears to be one story at street level, it is actually two stories in height. In order to have a level entry way from the street level into the kitchen, it is necessary to construct a raised walkway extending from the new deck, across the platted 17 foot building line to a point approximately 7 feet from the front property line. Although the walkway will be 4 feet above grade at the point nearest the front property line and 9+ feet above grade at the front wall of the house, it will be at grade with the street. Staff believes the applicant has presented adequate justification for the variance. The proposed walkway is not out of character with similar structures on other lots in the area and staff believes the proposed variances will have no impact on adjacent properties. If the building line variance is approved, the applicant will have to do a one lot replat to reflect the change approved by the Board. The applicant should review the filing procedure with the Circuit Clerk to determine if the replat requires a revised Bill of Assurance. Staff Recommendation: Staff recommends approval of the requested front yard setback and building line variances subject to the following conditions: 1. Compliance with the Public Works Comments 2. A replat of the lot reflecting the change in the building line as approved by the Board BOARD OF ADJUSTMENT (JANUARY 29, 1996) The applicant, Curtis Bailey, was present. There were no objectors present. Staff presented the item and a recommendation of approval, with conditions. Mr. Bailey offered no additional comments at that point. After a discussion of the Public Works comments by Cindy Dawson, of the City Attorney's office, it was determined that there was OA January .2 9 , 19.9 6 I m 2 Cont. no nexus to require the dedication of right-of-way through this variance issue. Mr. Baxley had indicated a desire to widen the pavement of Scenic Drive to provide space for on -street parking. The Hoard determined that the right-of-way dedication should be tied to that project and not the proposed deck and walkway. A motion was made to approve the requested front yard setback and building line variances subject to a replat of the lot reflecting the change in the building line as approved by the Board. The motion was approved by a vote of 9 ayes, 0 noes and 0 absent. 3