HomeMy WebLinkAboutZ-6090-B Staff AnalysisFILE NO.: Z -6090-B
NAME: Indiana Avenue Revised Short -form PD -R
LOCATION: Located at 7208 and 7212 Indiana Street
DEVELOPER:
Flagship Homes, LLC
11200 Mara Lynn #2
Little Rock, AR 72211
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter Creek Court, Suite A
Little Rock, AR 72210
AREA: 0.688 acres
CURRENT ZONING:
ALLOWED USES:
NUMBER OF LOTS: 4 FT. NEW STREET: 0 LF
R-2, Single-family and PD -R (two-family residential)
Single-family and two family residences
PROPOSED ZONING: Revised PD -R
PROPOSED USE: Two-family residential
VARIANCES/WAIVERS REQUESTED: An in -lieu contribution for the required storm
water detention facility.
BACKGROUND:
On March 14, 1996, the Planning Commission denied a request for a Conditional Use
Permit to place a doublewide manufactured home on this site.
On June 3, 2004, the Little Rock Planning Commission approved a rezoning for the
western two of the proposed four lots to PD -R. The applicant proposed the construction
of two duplex units; each on individual lots. The units were to share a common drive
from lndiana Avenue and the proposed parking was located in the rear of the structures.
The applicant indicated five parking spaces per structure. The building footprint would
be approximately 1,024 square feet and the building was proposed as a two-story
FILE NO.: Z -6090-B
building. The proposed site plan
the eastern and western lot lines
Little Rock Board of Directors
Street Short -form PD -R.
A. PROPOSAL/REQUEST:
included a reduced side yard setback of five feet on
of the proposed development. On July 20, 2004, the
adopted Ordinance No. 19,139 establishing Indiana
The applicant now proposes the construction of two additional duplex units; each
located on individual lots, to the east of the previously approved PD -R. The units
will share a common 16 -foot drive from Indiana Avenue accessing the proposed
parking located in the rear of the structures. The applicant has indicated five
parking spaces per structure. The building footprint will be approximately 1,024
square feet and the building is proposed as a two-story building. The proposed
site plan includes a reduced side yard setback of one foot on the western lot lines
of the proposed new development.
The applicant is requesting the allowance of an in -lieu contribution for the
required storm water detention facility.
B. EXISTING CONDITIONS:
The neighborhood is comprised of single-family, two-family and multi -family
residential uses and zonings. The property immediately to the west is zoned R-2
and contains a single-family residential structure with several two-family
residences further west (zoned R-4). The property immediately east of this site is
zoned R-2 and contains a single-family residential structure. The property further
east is zoned R -4/R-5 and contains two-family and multi -family residential uses.
The properties to the north of this site are zoned R -5/R-2 and contain a mixture
of single-family, two family and multi -family residential uses as well as a pre-
school.
The property to the south, across Indiana Avenue, is zoned R-4 and contains
two-family residences.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received one informational phone call from an area
resident. The Meriwether Neighborhood Association, all residents located within
300 -feet of the site and all property owners located within 200 -feet of the site
were notified of the public hearing.
D. ENGINEERING COMMENTS:
1. The proposed right-of-way dedication does
requirement for a minor commercial street.
2. Provide design of the street conforming to
Construct one-half street improvement to the
2
not meet Master Street Plan
Master Street Plan standard.
street. Reconstruction of 'h of
FILE NO.: Z -6090-B
the street may be required to address an existing drainage problem caused
by the lack of crown in the road at this location.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan and the drainage path
for the discharge.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Ener- : No comment received.
SBC: No comment received.
Central Arkansas Water: No objection to expansion of previously approved site.
All Central Arkansas Water requirements in effect at the time of request for water
service must be met. If units do not have individual water meters, installation of
an approved reduced pressure zone backflow preventer assembly (RPZA) is
required on the domestic water service. This assembly must be installed prior to
the first point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW must complete successful tests of the
assembly. The test results must be sent to CAW's Cross Connection Section
within ten days of installation and annually thereafter. Contact Carroll Keatts at
377-1226 if you would like to discuss backflow prevention requirements for this
project.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the West Little Rock Planning
District. The Land Use Plan shows Multifamily for this property. The applicant
has applied for a revision to a PDR (Planned Development - Residential) to add
additional duplexes to the site plan.
The request does not require a change to the Land Use Plan.
Master Street Plan: Florida and Indiana Avenues are shown as Local Streets on
the Master Street Plan. These streets may require street and sidewalk
improvements at the entrance to the parking area.
3
FIL
G.
H
Z -6090 -
Bic cle Plan: Existing or proposed Class I, II, or III Bikeways are not in the
immediate vicinity of the development.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Midtown Neighborhood Action Plan. The Infrastructure goal
is to "maintain and enhance infrastructure to serve existing and new residents
and promote revitalization of the neighborhood," and has an action statement
that specifically addresses a need for maintenance and improvements on both
Florida and Indiana Avenues. Construction of the driveway should not harm the
area's street or sidewalk infrastructure.
Landscape: Areas set-aside for buffers and landscaping meet with ordinance
requirements. A six-foot high opaque screen, either a wood fence with its face
side directed outward, a wall or dense evergreen plantings, is required along the
eastern perimeter of the site.
SUBDIVISION COMMITTEE COMMENT: (March 24, 2005)
Mr. Pat McGetrick was present representing the request. Staff stated the request
was to place two duplex units on two individual lots. Staff stated the request also
indicated the placement of the parking in the rear of the structure to allow the
units to maintain a single-family character. Staff stated the units would possibly
be two story units and indicated a maximum building height of 35 -feet.
Public Works Comments were addressed. Staff stated a shared driveway
access easement should be platted with the proposed development.
Mr. McGetrick stated a deed instrument would be filed to resolve any potential
problems. Staff also noted one-half street improvements would be required to
Indiana street.
Landscaping comments were addressed. Staff stated screening would be
required along the eastern perimeter of the site.
Staff noted comments from the various other reporting departments and
agencies indicating the applicant should contact them individually for further
clarification. There was no further discussion of the item. The Committee then
forwarded the item to the full Commission for final action.
ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the March 24, 2005, Subdivision Committee meeting. The applicant
has worked with staff to resolve concerns of the required storm water detention
and staff is agreeable to the applicant's request for an in -lieu contribution. The
applicant has indicated an access easement through a deed instrument will be
placed on the site to resolve staff concerns of a potential conflict with access to
the rear parking area.
0
FILE NO.: Z -6090-B
The applicant is requesting a waiver of the required screening to the east of the
site. The applicant has indicated landscaping will be placed along the eastern
perimeter of the site but has indicated the desire is to maintain a single-family
characteristic of the site. Staff is supportive of this request. The area has
developed with a mixture of uses both single-family and two family residences.
Staff does not feel with the placement of the duplex unit on the site will adversely
impact the adjoining property to the point additional screening is required.
Staff is supportive of the request. The applicant is proposing to expand a
previously approved PD -R to increase the total number of lots to four. The
applicant is proposing the construction of two duplex units in two phases. The
applicant has indicated the western most lot will be developed in the first phase
along with a 12 -foot driveway to access the rear parking area (five parking
spaces). The applicant has indicated in the second phase four additional feet will
be added to the driveway and five additional parking spaces will be placed on the
second lot. The applicant has met with the Little Rock Fire Department and they
have indicated support for the applicant's indicated phasing plan.
The applicant has indicated five parking spaces per structure. The typical
minimum parking required for the units would be three parking spaces per lot.
The indicated parking is more than adequate to meet the typical minimum
parking required for a duplex unit.
The building footprint will be approximately 1,024 square feet and the building is
proposed as a two-story building with a maximum height of 35 -feet. The
proposed site plan includes a reduced side yard setback of one foot on the
western lot lines of the proposed new development. The side yard setback has
been reduced due to the location of an existing sewer main. The main was
located entirely on the lot to the west. Although the side yard setback will be set
at one foot the building separation is 9 -feet. Staff is supportive of the applicant's
indicated setbacks.
As indicated staff is supportive of the applicant's request. Staff feels the
proposed development should have limited impact on the adjoining properties if
developed as proposed. There is a great deal of R-4 zoning in the area, which
would allow for the construction of duplex units on the individual lots. Staff does
not feel the applicant's proposal out of character with the existing neighborhood.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above agenda staff report.
Staff recommends approval of the applicant's request for an in -lieu contribution
for the required storm water detention facility.
5
FILE NO.. Z -6090-B
PLANNING COMMISSION ACTION: (AUGUST 18, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the agenda staff report. Staff also stated Public Works comments were being amended
to include the placement of a sidewalk along the property frontage. Staff presented a
recommendation of approval of the applicant's request for an in -lieu contribution for the
required storm water detention facility.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 9 ayes, 0 noes and 2 absent.
L
August 18, 2005
ITEM NO.: ❑ FILE NO.: Z -6090-B
NAME: Indiana Avenue Revised Short -form PD -R
LOCATION: Located at 7208 and 7212 Indiana Street
DEVELOPER:
Flagship Homes, LLC
11200 Mara Lynn #2
Little Rock, AR 72211
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter Creek Court, Suite A
Little Rock, AR 72210
AREA: 0.688 acres
CURRENT ZONING:
ALLOWED USES:
NUMBER OF LOTS: 4 FT. NEW STREET: 0 LF
R-2, Single-family and PD -R (two-family residential)
Single-family and two family residences
PROPOSED ZONING: Revised PD -R
PROPOSED USE: Two-family residential
VARIAN CESMAIVERS REQUESTED: An in -lieu contribution for the required storm
water detention facility.
BACKGROUND:
On March 14, 1996, the Planning Commission denied a request for a Conditional Use
Permit to place a doublewide manufactured home on this site.
On June 3, 2004, the Little Rock Planning Commission approved a rezoning for the
western two of the proposed four lots to PD -R. The applicant proposed the construction
of two duplex units; each on individual lots. The units were to share a common drive
from Indiana Avenue and the proposed parking was located in the rear of the structures.
The applicant indicated five parking spaces per structure. The building footprint would
be approximately 1,024 square feet and the building was proposed as a two-story
August 18, 2005
SUBDIVISION
ITEM NO.: D FILE NO.: Z -6090-B
building. The proposed site plan included a reduced side yard setback of five feet on
the eastern and western lot lines of the proposed development. On July 20, 2004, the
Little Rock Board of Directors adopted Ordinance No. 19,139 establishing Indiana
Street Short -form PD -R.
A. PROPOSAL/REQUEST:
The applicant now proposes the construction of two additional duplex units; each
located on individual lots, to the east of the previously approved PD -R. The units
will share a common 16 -foot drive from Indiana Avenue accessing the proposed
parking located in the rear of the structures. The applicant has indicated five
parking spaces per structure. The building footprint will be approximately 1,024
square feet and the building is proposed as a two-story building. The proposed
site plan includes a reduced side yard setback of one foot on the western lot lines
of the proposed new development.
The applicant is requesting the allowance of an in -lieu contribution for the
required storm water detention facility.
B. EXISTING CONDITIONS:
The neighborhood is comprised of single-family, two-family and multi -family
residential uses and zonings. The property immediately to the west is zoned R-2
and contains a single-family residential structure with several two-family
residences further west (zoned R-4). The property immediately east of this site is
zoned R-2 and contains a single-family residential structure. The property further
east is zoned R -4/R-5 and contains two-family and multi -family residential uses.
The properties to the north of this site are zoned R -5/R-2 and contain a mixture
of single-family, two family and multi -family residential uses as well as a pre-
school.
The property to the south, across Indiana Avenue, is zoned R-4 and contains
two-family residences.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received one informational phone call from an area
resident. The Meriwether Neighborhood Association, all residents located within
300 -feet of the site and all property owners located within 200 -feet of the site
were notified of the public hearing.
D. ENGINEERING COMMENTS:
The proposed right-of-way dedication does not meet Master Street Plan
requirement for a minor commercial street.
2
August 18, 2005
SUBDIVISION
ITEM NO.: D
FILE NO.: Z
2. Provide design of the street conforming to Master Street Plan standard.
Construct one-half street improvement to the street. Reconstruction of '/2 of
the street may be required to address an existing drainage problem caused
by the lack of crown in the road at this location.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan and the drainage path
for the discharge.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point En_e_rgy: No comment received.
SBC: No comment received.
Central Arkansas Water: No objection to expansion of previously approved site.
All Central Arkansas Water requirements in effect at the time of request for water
service must be met. If units do not have individual water meters, installation of
an approved reduced pressure zone backflow preventer assembly (RPZA) is
required on the domestic water service. This assembly must be installed prior to
the first point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW must complete successful tests of the
assembly. The test results must be sent to CAW's Cross Connection Section
within ten days of installation and annually thereafter. Contact Carroll Keatts at
377-1226 if you would like to discuss backflow prevention requirements for this
project.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
F. ISSU ES/TECH N ICAUDESI GN:
Planning Division: This request is located in the West Little Rock Planning
District. The Land Use Plan shows Multifamily for this property. The applicant
has applied for a revision to a PDR (Planned Development - Residential) to add
additional duplexes to the site plan.
The request does not require a change to the Land Use Plan.
3
August 18, 2005
SUBDIVISION
ITEM NO.:
FILE NO.: Z -6090-B
Master Street Plan: Florida and Indiana Avenues are shown as Local Streets on
the Master Street Plan. These streets may require street and sidewalk
improvements at the entrance to the parking area.
Bicycle Plan: Existing or proposed Class I, Il, or III Bikeways are not in the
immediate vicinity of the development.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Midtown Neighborhood Action Plan. The Infrastructure goal
is to "maintain and enhance infrastructure to serve existing and new residents
and promote revitalization of the neighborhood," and has an action statement
that specifically addresses a need for maintenance and improvements on both
Florida and Indiana Avenues. Construction of the driveway should not harm the
area's street or sidewalk infrastructure.
Landscape: Areas set-aside for buffers and landscaping meet with ordinance
requirements. A six-foot high opaque screen, either a wood fence with its face
side directed outward, a wall or dense evergreen plantings, is required along the
eastern perimeter of the site.
G. SUBDIVISION COMMITTEE COMMENT: (March 24, 2005)
Mr. Pat McGetrick was present representing the request. Staff stated the request
was to place two duplex units on two individual lots. Staff stated the request also
indicated the placement of the parking in the rear of the structure to allow the
units to maintain a single-family character. Staff stated the units would possibly
be two story units and indicated a maximum building height of 35 -feet.
Public Works Comments were addressed. Staff stated a shared driveway
access easement should be platted with the proposed development.
Mr. McGetrick stated a deed instrument would be filed to resolve any potential
problems. Staff also noted one-half street improvements would be required to
Indiana street.
Landscaping comments were addressed. Staff stated screening would be
required along the eastern perimeter of the site.
Staff noted comments from the various other reporting departments and
agencies indicating the applicant should contact them individually for further
clarification. There was no further discussion of the item. The Committee then
forwarded the item to the full Commission for final action.
4
August 18, 2005
SUBDIVISION
ITEM NO.: D FILE NO.: Z -6090-B
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the March 24, 2005, Subdivision Committee meeting. The applicant
has worked with staff to resolve concerns of the required storm water detention
and staff is agreeable to the applicant's request for an in -lieu contribution. The
applicant has indicated an access easement through a deed instrument will be
placed on the site to resolve staff concerns of a potential conflict with access to
the rear parking area.
The applicant is requesting a waiver of the required screening to the east of the
site. The applicant has indicated landscaping will be placed along the eastern
perimeter of the site but has indicated the desire is to maintain a single-family
characteristic of the site. Staff is supportive of this request. The area has
developed with a mixture of uses both single-family and two family residences.
Staff does not feel with the placement of the duplex unit on the site will adversely
impact the adjoining property to the point additional screening is required.
Staff is supportive of the request. The applicant is proposing to expand a
previously approved PD -R to increase the total number of lots to four. The
applicant is proposing the construction of two duplex units in two phases. The
applicant has indicated the western most lot will be developed in the first phase
along with a 12 -foot driveway to access the rear parking area (five parking
spaces). The applicant has indicated in the second phase four additional feet will
be added to the driveway and five additional parking spaces will be placed on the
second lot. The applicant has met with the Little Rock Fire Department and they
have indicated support for the applicant's indicated phasing plan.
The applicant has indicated five parking spaces per structure. The typical
minimum parking required for the units would be three parking spaces per lot.
The indicated parking is more than adequate to meet the typical minimum
parking required for a duplex unit.
The building footprint will be approximately 1,024 square feet and the building is
proposed as a two-story building with a maximum height of 35 -feet. The
proposed site plan includes a reduced side yard setback of one foot on the
western lot lines of the proposed new development. The side yard setback has
been reduced due to the location of an existing sewer main. The main was
located entirely on the lot to the west. Although the side yard setback will be set
at one foot the building separation is 9 -feet. Staff is supportive of the applicant's
indicated setbacks.
As indicated staff is supportive of the applicant's request. Staff feels the
proposed development should have limited impact on the adjoining properties if
W
August 18, 2005
SUBDIVISION
ITEM NO.: ❑ FILE NO.: Z -6490-B
developed as proposed. There is a great deal of R-4 zoning in the area, which
would allow for the construction of duplex units on the individual lots. Staff does
not feel the applicant's proposal out of character with the existing neighborhood.
1. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above agenda staff report.
Staff recommends approval of the applicant's request for an in -lieu contribution
for the required storm water detention facility.
PLANNING COMMISSION ACTION: (AUGUST 18, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the agenda staff report. Staff also stated Public Works comments were being amended
to include the placement of a sidewalk along the property frontage. Staff presented a
recommendation of approval of the applicant's request for an in -lieu contribution for the
required storm water detention facility.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 9 ayes, 0 noes and 2 absent.
6
ITEM NO.: 2 FILE NO.: Z -6090-B
NAME: Indiana Avenue Revised Short -form PD -R
LOCATION: located at 7208 and 7212 Indiana Street
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide the previously approved PD -R located to the west of the site on the
proposed drawing.
3. Provide the building separation along the western property line.
4. How will the garbage collection be handled? If the site will contain a dumpster
provide the location along with the required screening. If individual garbage cans
are to be utilized provide the location of the proposed can storage.
5. Provide details of proposed screening along the eastern perimeter of the site.
6. The request includes the development of Lot 21 independent of Lot 22. Based on
the current design this does not work. The indicated drive to service the parking is
only ten feet in width and is located on the property line, which does not allow for
adequate screening of the adjoining parcel. Redesign the building layout and
driveway placement to allow for adequate screening should Lot 22 develop as
currently zoned.
Variance/Waivers: None requested.
Public Works Conditions:
1. The proposed right-of-way dedication does not meet Master Street Plan requirement
for a minor commercial street.
2. Provide design of the street conforming to Master Street Plan standard. Construct
one-half street improvement to the street. Reconstruction of 'h of the street may be
required to address an existing drainage problem caused by the lack of crown in the
road at this location.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan and the drainage path for the
discharge.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: No objection to expansion of previously approved site. All
Central Arkansas Water requirements in effect at the time of request for water service
must be met. If units do not have individual water meters, installation of an approved
reduced pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful
tests of the assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross
Connection Section within ten days of installation and annually thereafter. Contact
Carroll Keatts at 377-1226 if you would like to discuss backflow prevention requirements
for this project.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
Planning Division:
Landscape_ Areas set-aside for buffers and landscaping meet with ordinance
requirements. A six foot high opaque screen, either a wood fence with its face side
directed outward, a wall or dense evergreen plantings, is required along the eastern
perimeter of the site.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, March 30, 2005.