Loading...
HomeMy WebLinkAboutZ-7500-I Site Plan REVISED 011123S1° 52' 31"W 586.80'PROJECT SITEArea : 10.63 ACS11° 36' 4 7 " E 1 3 4 . 4 9 ' S 4 0 ° 0 5 ' 0 5 "W 1 7 6 . 2 2 'S62° 53 ' 31 "W 172 .92 'N88° 39' 29"W 112.87'S16° 10' 2 8 " E 5 2 . 9 4'N88° 28' 52"W 224.54'N87° 41' 30"W 330.56'113 PARKING SPACESN1° 48' 01"E 725.30'1.13 SPACES/400 S.F.S53° 46' 33"E 377.53'N89° 03' 33"E 20.18'N1° 42' 30"E 70.77'S66° 07' 12"E 107.85'S89° 30' 16"E 175.71'S81° 21' 32"E 134.30'S45° 40' 33"E 190.73'BUILDING "B"25,000 S.F.BUILDING "A"15,000 S.F.151187DUMPSTERS16161515109OFFICE SHOWROOM / WAREHOUSE40,000 S.F.DRAFTThis document ispreliminary innature and is not afinal signed andsealed document.HAMILTON STATION NEAR 14524 HWY 10 - LITTLE ROCK, AR REES COMMERCIAL SITE PLAN REVIEW PROJECT CONTACT INFORMATION:OWNER /DEVELOPER: REES COMMERCIAL11719 HINSON ROAD, SUITE 130LITTLE ROCK, ARKANSAS 72212 PHONE: (501) 223-9298CIVIL ENGINEER:JESS GRIFFIN PE CFM5 KINGSTON DRIVELITTLE ROCK, AR 72227 PHONE: (501) 690-3456ARCHITECT: ROARK PERKINS PERRY YELVINGTONARCHITECTURE & INTERIOR DESIGN713 W SECOND STREETLITTLE ROCK, ARKANSAS 72201 PHONE: (501) 372-0272LANDSCAPE ARCHITECT:FRANK RIGGINS, ASLAPHONE: (501) 554-2509PROPOSEDEXISTINGDESCRIPTIONSANITARY SEWER LINEFIBER OPTIC LINEOVERHEAD ELECTRIC LINEGAS LINEWATER LINEUNDERGROUND PHONE LINEUNDERGROUND ELECTRIC LINESTORM DRAINAGE PIPEGUY ANCHORFIRE HYDRANTWATER VALVEWATER METERUTILITY POLELIGHT POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN-OUTTELEPHONE PEDESTAL/RISERSIGNELECTRICAL BOXAIR RELEASE VALVEDITCH FLOW LINEGAS REGULATORGAS METERCONTROL POINTCURB INLET/JUNCTION BOXORCATV CABLE LINEFENCEX-XDRAINAGE STRUCTURE - NO.LEGENDFHCOSFHCOPINNACLE STATIONSHOPPING CENTERSBUILDING MATERIALS - BRICK, STONE, GLASS, METAL AT REARMAX BUILDING HEIGHT = 40'DETENTION WILL BE PROVIDED UNDERGROUND CULVERTS.PHASE I SITE ACREAGE = 4.96 ACRESJESS GRIFFIN, PE, CFM11719 HINSON DR, 130ELITTLE ROCK, AR 72212TEL (501) 690-3456JESS@GRIFFINPE.COM100 YR FLOODPLAIN100YR FLOODWAYPINNACLE CREEKSHOPPING CENTER14710 CANTRELLSHOPPING CENTEREXISTING SEWER MAIN41' ENHANCEDUNDISTURBEDBUFFER (MIN.)PROPERTY LINECONSTRUCTCURB CUT FOREMERGENCYACCESS TO WEST& BIKE PATHPHASE II - FUTURE DEVELOPMENTWE ARE REQUESTING PERMISSION TO RE-GRADE THISAREA IN PHASE I AND CLEAN THIS AREA UP.SPECIAL PERMISSION WILL BE OBTAINED BY CAW PRIORTO ANY CONSTRUCTION ACTIVIES CONDUCTED WITHINUTILITY EASEMENTS.RECONSTRUCTBIKE PATH(MEET MASTERSTREET PLANREQUIREMENTS)ACCESSEASEMENTDETENTIONAREA W/EASEMENT DETENTION SYSTEM(FOR ROOF / DRIVE)DETENTION SYSTEM(FOR PARKING LOT )EX. UTILITY EASEMENT25' FLOODWAY EASEMENTPHASE IIPHASE I SCREEN DUMPSTERPER CLR CODE W/ 8'OPAQUE SCREENRETAINING WALL FFE 302.0' FFE 302.0'