HomeMy WebLinkAboutZ-9535-A - PC Action Letter 021523February 9, 2023
ITEM NO.: E FILE NO.: Z-9535-A
NAME: Ranch Creek Townhomes – PD-R
LOCATION: West side of Tulley Cove, North of 16100 Cantrell Road
DEVELOPER:
Newcap Land Holdings, LLC
PO Box 241667
Little Rock, AR 72223
OWNER / AUTHORIZED AGENT:
TLC, LLC – Owner
Joe White & Associates – Agent
SURVEYOR / ENGINEER:
Joe White & Associates
25 Rahling Circle, Suite A-2
Little Rock, AR 72223
AREA: 1.9 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
WARD: 4 PLANNING DISTRICT: 1 CENSUS TRACT: 42.05
CURRENT ZONING: R-2
VARIANCE / WAIVERS: None requested.
A. PROPOSAL / REQUEST / APPLICANT’S STATEMENT:
The applicant proposes to rezone 1.9 acres from “R-2” Single Family District to
Planned Development – Residential (PD-R) to allow the construction of three (3)
multi-family buildings, with fifteen (15) units in the development.
B. EXISTING CONDITIONS:
The site is currently undeveloped and wooded. The property contains varying
degrees of slope.
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
2
C. NEIGHBORHOOD COMMENTS:
All owners of property located within 200 feet of the site and all neighborhood
associations registered with the City of Little Rock were notified of the public
hearing.
D. ENGINEERING COMMENTS:
1. Provide finished floor elevations (FFE) for all buildings on plat, site plan, and
grading and drainage plans at least one foot above base flood elevation or
more per flood insurance study and FEMA FIRM panel.
2. A Special Flood Hazard Development Permit is required to be obtained to
prior to beginning construction. The Special Flood Hazard Development
Permit application can be found at https://www.littlerock.gov/city-
administration/city-departments/public-works/. Special Flood Hazard
Development Permits are issued by the Public Works Department at
701 West Markham Street and no fee collected for issuance. Contact Vince
Floriani in Public Works at 501-371-4823 or VFloriani@littlerock.gov to
schedule an appointment for issuance or to answer any questions.
3. Due to the proposed structure being located within the 100 year floodplain,
an elevation certificate of the finished floor elevation must be provided to the
Public Works Department at 701 West Markham Street prior to the issuance
of a certificate of occupancy. Contact Vince Floriani in Public Works at
501-371-4823 or VFloriani@littlerock.gov to schedule an appointment for
issuance or to answer any questions.
4. Per City Code, 13-57, variances for development in the regulatory floodway
are prohibited unless (1) All requirements of 44 CFR 65.12 are first met or (2)
(a) A no rise certificate signed and sealed by a professional engineer licensed
to practice in the State of Arkansas is submitted to document that no increase
in base flood elevation would result from granting a variance for the proposed
development (b) protective measures are employed to minimize damages
during flooding events and (c) the variance does not result in adverse impact
to other lands.
5. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25-foot-wide
drainage and access easement is required adjacent to the floodway
boundary.
6. Alteration of the water course will require approval from the Little Rock District
of the US Army Corps of Engineers prior to start of work.
7. The proposed alteration of the floodway will require flood map revisions.
Obtain a conditional letter of map revision and no rise certification approval
from Little Rock Public Works Department’s floodplain administrator and the
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
3
Federal Emergency Management Agency prior to issuance of a grading
permit and/or a building permit. An approved letter of map revision must be
obtained prior to issuance of a certificate of occupancy.
8. Per City Code 29-186 (c), a grading permit is required for land alteration on
properties within the designated floodplain without exception. Grading
permits are issued by the Planning and Development Dept. at 723 West
Markham Street after approval of sediment and erosion control plans, grading
and drainage plans, land survey, drainage study, and soil loss calculations
per City’s stormwater management and drainage manual. Contact Planning
and Development Dept., Engineering Division at 501-371-4817 or at
501-918-5348 or Permits@littlerock.gov to schedule an appointment for
issuance or to answer any questions. Permit cost is based on total project
area at $100.00 for the less than ½ acre, $200.00 for ½ to 1 acre, and $200.00
for the first acre and $100.00 for each additional acre for project greater than
1 acre. Any work involving one (1) or more acres of disturbed area requires
a State of Arkansas NPDES permit. Contact the Arkansas Department of
Environmental Quality, NPDES branch at 501-682-0744 for applications and
information about General Stormwater Discharge Construction Permit
#ARR150000.
9. Damage to public and private property due to hauling operations or
operations of construction related equipment from a construction site shall be
repaired by the responsible party prior to the issuance of a certificate of
occupancy.
10. A maintenance bond for 50% of total construction costs for all completed
public street and drainage improvements within City right of way and as-built
storm drainage infrastructure plans shall be provided to the Department of
Planning and Development before the issuance of a final certificate of
occupancy.
11. A drainage study showing all hydrologic and hydraulic calculations for the
proposed storm sewer pipe system, detention ponds and structures, and
inlets is required. For final drainage report, sign, date, and seal the report per
AR State Board of Professional Engineers and Professional Surveyors rules
Article 12, Section B (1) (a). Provide engineer's certification statement saying
this drainage report was conducted by yourself or directly under your
supervision and attesting to the accuracy of the information within this report.
12. Per City Rev. Code 29-99, stormwater detention for developments is
required. Provide stormwater detention infrastructure to satisfy this
requirement.
13. The Department requires three (3) phase sediment and erosion control (SEC)
plans to be submitted for all construction projects showing best management
practices (BMPs) for mitigating sediment runoff and erosion along with
vegetation specifications for temporary and permanent soil stabilization.
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
4
Phase 1 SEC plans shall show SEC BMPs during the stripping, clearing,
grubbing, and rough grading of the site. Phase 2 SEC plans shall show SEC
BMPs during construction of utilities, buildings, roadway infrastructure and
drainage infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final
grading, seeding, and landscaping of the site.
14. Sediment and Erosion Control plans shall also show the pertinent information
as outlined in ADEQ ARR150000 Permit Part II section A-4-H (1-14) and Part
II section A-4-I-2 (A-B).
E. UTILITIES / FIRE DEPARMENT / PARKS / COUNTY PLANNING:
Little Rock Water Reclamation Authority: No comments.
Entergy: No comments received.
Summit Energy: No comments.
AT&T: No comments received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for water
service must be met. Please submit plans for water facilities to Central Arkansas
Water for review. Plan revisions may be required after additional review. Contact
Central Arkansas Water regarding procedures for installation of water facilities.
Approval of plans by Central Arkansas Water, the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
Fire Department:
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads
shall not exceed 10 percent in grade except as approved by the fire chief. If
the grade exceeds 10 percent, approval will be denied and the applicant must
submit request to be reviewed by Fire Chief for Approval.
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
5
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
30’ Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1
– D105.4
D105.1 Where Required. Where the vertical distance between the grade
plane and the highest roof surface exceed 30’, approved aerial fire apparatus
access roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls, whichever
is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26’, exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
D105.3 Proximity to building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a maximum
of 30 feet from the building, and shall be positioned parallel to one entire side of
the building. The side of the building on which the aerial fire apparatus access
road is positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be located
over the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
6
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply with
all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Multi-Family Residential Developments
As per Appendix D, Section D106.1 of the 2012 Arkansas Fire Prevention
Code Vol. 1. Projects having more than 100 dwelling units. Multiple-family
residential projects having more than 100 dwelling units shall be equipped
throughout with two separate and approved fire apparatus access roads.
Exception: Projects having up to 200 dwelling units may have a single
approved fire apparatus access road when all building, including nonresidential
occupancies are equipped throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention
Code Vol. 1. Projects having more than 200 dwelling units. Multiple-family
residential projects having more than 200 dwelling units shall be provided with two
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
7
separate and approved fire apparatus access roads regardless of whether they
are equipped with an approved automatic sprinkler system.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 – C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal’s Office
(Capt. Tony Rhodes 501-918-3757, or Fire Marshal Derek N. Ingram
501-918-3756 Number and Distribution of Fire Hydrants as per Table C105.1.
F. BUILDING CODES / LANDSCAPE:
Building Code: No comments received.
Landscape:
1. Any new site development must comply with the City’s minimal landscape and
buffer ordinance requirements.
2. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. TRANSPORTATION / PLANNING:
Rock Region Metro: No comments received.
Planning Division:
The request is in the River Mountain Planning District.
The Land Use Plan shows Residential Low Density (RL) for the requested area.
The Residential Low-Density category provides for single family homes at
densities not to exceed 6 dwelling units per acre. Such residential development is
typically characterized by conventional single-family homes but may also include
patio or garden homes and cluster homes, provided that the density remains less
than 6 units per acre. The application is to rezone from Single Family District
(R-2) to Planned Development - Residential (PD-R) for the development of
townhomes. This site is in the Highway 10 Design Overlay District.
Surrounding the application area, the Land Use Plan shows RL to the north and
east. North is the developed single-family Terra Bella subdivision, to the east is
the developed single-family Thomas Park subdivision, both zoned R-2. To the
south of the application area is Taylor Loop Creek shown as Park/Open Space on
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
8
the Plan Map. South of Taylor Loop Creek, the Land Use Plan shows Transition
(T). Transition is a land use plan designation that provides for an orderly transition
between residential uses and other more intense uses. The Park Open Space
category includes all public parks, recreation facilities, greenbelts, flood plains, and
other designated open space and recreational land. This land is the floodway of
Taylor Loop Creek. Transition was established to deal with areas which contain
zoned residential uses and nonconforming nonresidential uses. A Planned Zoning
District is required unless the application conforms to the Design Overlay
standards. Uses that may be considered are low-density multi-family residential
and office uses if the proposals are compatible with quality of life in nearby
residential areas. Southeast are two offices developed as Planned Development-
Office (PD-O), for single office use or building.
Master Street Plan:
To the south is Cantrell Road and is shown as a Principal Arterial on the Master
Street Plan. Principal Arterial roads are designed to serve through traffic and to
connect major traffic generators or activity centers within urbanized areas. Since
these roads are designed for through traffic and are generally located three or
more miles apart, dedication of additional right-of-way is required to allow for future
expansion to six through lanes plus left and right turn lanes. Right-of-way of 110
feet is required but may vary due to topography, floodway or other constraints
eliminating or reducing future adjacent development. Sidewalks are required on
both sides. This street may require dedication of right-of-way and may require
street improvements for entrances and exits to the site.
Bicycle Plan: Cantrell Road is shown as a Class I Bike Path. Class I Bike Paths
are designated for the sole use of bicycles that is physically separated from
vehicular lanes.
Historic Preservation Plan: There are no existing historic sites on, or in proximity
to, this land.
H. ANALYSIS:
The applicant proposes to rezone the 1.9 acre property located at the west side
of Tulley Cove, north of 16100 Cantrell Road from "R-2" Single Family District
to "PD-R" Planned Development - Residential District. The property is part of
the Taylor Loop Creek Addition (Lot 2 – unrecorded), which is currently
undeveloped and wooded. Most of the property resides in the 100-year floodplain,
with the floodway running along the south end of the development.
The applicant proposes to construct three (3) three-story structures on the property
with a total of 15 single family residential units available for use. One of the
buildings will house five (5) of the units, while the other two will have four (4) and
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
9
six (6) units, respectively. Each of the units will be individually owned, and the
trash service for the property will be handled by waste and recycling containers at
each unit.
A development of this type calls for twenty-two (22) parking spaces; Ranch Creek
Townhomes will have thirty-seven (37) parking spaces, with thirty (30) spaces
shown in the fifteen (15) garages at each unit. Seven (7) spaces at the site will be
reserved for guests (two of these will be handicap spaces).
The proposed buildings will have a minimum front setback, per Highway 10 overlay
standards, at one hundred (100) feet. The rear setback, also per Highway 10
overlay standards, will be forty (40) feet. The side setbacks will be thirty-five
(35) feet.
In addition to the development, the developer will construct a bridge to cross Taylor
Loop Creek, similar to the bridge upstream serving Tulley Cove.
The applicant provided responses and additional information to all
issues raised during staff's review of the application. To staff's knowledge
there are no outstanding issues. The applicant is requesting no variances
with the proposed PD-R rezoning.
Staff is supportive of the requested PD-R zoning to allow the 15-unit residential
development. Staff views the request as reasonable. The property is in an
area of mixed uses and zoning. The proposed development should prove to
be compatible with the surrounding uses and zoning. Staff believes the
proposed PD-R zoning will have no adverse impact on the general area and
should prove to be a good transition use between the more intense uses along
Cantrell Road and the single family uses to the north.
I. STAFF RECOMMENDATION:
Staff recommends approval of the requested PD-R zoning, subject to
compliance with the comments and conditions outlined in paragraphs D, E and
F, and the staff analysis, of the agenda staff report.
PLANNING COMMISSION ACTION: (JANUARY 12, 2023)
The applicant was present. There were no persons present registered in opposition in
attendance. Staff informed the Commission that the applicant submitted a letter to staff
on January 11, 2023, requesting this application be deferred to the February 9, 2023
Planning Commission Agenda. Staff supported the deferral request. There was no
further discussion. The item remained on the consent agenda and was deferred as
recommended by staff. The vote was 10 ayes, 0 nays, 0 absent and 1 open position.
February 9, 2023
ITEM NO.: E (Cont.) FILE NO.: Z-9535-A
10
PLANNING COMMISSION ACTION: (FEBRUARY 9, 2023)
Staff informed the Commission that the applicant requested the application be withdrawn.
Staff supported the withdrawal request. The item was placed on the Consent Agenda for
withdrawal. The vote was 10 ayes, 0 nays and 1 absent. The application was withdrawn.