ITEM N 4 Z-607
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Estate of Herman B. Page and
Ethel E. Page
Ramona Ball
3800 Baseline Road
Rezone from R-2 to C-1
Unspecified commercial
development
.64± acres
Single-family residence
5=0gNDING LAND USE AND ZONING
0
North - Single -Family residence; zoned R-2
South - Single -Family residence and nonconforming
veterinary clinic; zoned R-2
East - Nonconforming auto repair garage; zoned R-2
West - vacant lot; zoned R-2
ENGINEERING COMMENTS
The right-of-way for Community Road is not shown, 30 feet of
right-of-way from centerline is required for commercial
streets. Baseline Road requires 45 feet from centerline
with a 20 foot radial dedication at the intersection.
With Construction: Provide adequate off-street parking and
drives per ordinances. The existing drive will be
acceptable as shown on Baseline Road. A new drive onto
Community by ordinance is to be 1.00 feet from Baseline Road.
Construct sidewalk and ramps for Community Road. Street
improvements for Community Road will be required to
commercial street standards. Existing street is a 18 foot
chipseal and should be 36 foot curb and gutter.
LAND USE ELEMENT
The site is located in the Geyer Springs East District. The
adopted Land Use Plan recommends Mixed Residential. The
request is for Commercial use. After review of the area,
Staff believes it is appropriate to amend the Plan to allow
January 2,•1996
ITEM N 4 Z-6076 cont.)
Office use in the area. Currently, there is an Office use
area to the west. This use pattern should be continued east
to Community Road for the first 200 feet north of Baseline
Road.
STAFF ANALYSE
The request is to rezone this .64± acre tract from "R-2"
Single Family residential to "C-1" Neighborhood Commercial.
The property currently contains a one-story, single family
residence. No specific development has been proposed for
the site.
The property is located in an area that is predominately
zoned R-2. The properties in the immediate vicinity contain
uses ranging from single-family homes to nonconforming
businesses such as an auto repair garage and a veterinary
clinic. An elementary school and a neighborhood alert
center are located diagonally across Baseline Road to the
southeast. A large area of undeveloped 0-3 property is
located approximately 400 feet west of the site. z
Much of Baseline Road has developed nonresidentially and
staff believes it is appropriate to consider a
nonresidential use for this property. There is single
family residential property adjacent to the north of this
site and -staff questions whether commercial zoning is
appropriate. Office zoning may be more compatible with the
adjacent residential use.
The Geyer Springs East District Land Use Plan currently
recommends Mixed Residential for this site. After review of
the area, staff believes it is appropriate to amend the Plan
to Office. This can be accomplished by expanding the
existing office which is to the west of this site. The
Office pattern should be extended east to Community Road for
the first 200 feet north of Baseline Road.
No specific development or use is proposed for the site.
The property is in the estate of Herman and Ethel Page. The
family desires to sell the property and is seeking a higher
classification to facilitate a sale.
STAFF RECOMMENDATION
Staff recommends denial of the requested C-1 zoning. Staff
recommends that the property be zoned 0-3 and that the Geyer
Springs East District Land Use Plan be amended to Office.
2
January 2, .19 9 6
ITEM 4 Z 112 ;a'11:-
PLANNI OMMI IQN A TI (JANUARY 2, 1996)
The applicant, Ramona Ball, was present. There was one
objector present. Staff presented the item and recommended
denial of the requested C-1 zoning. Staff recommended that
the property be zoned 0-3 and that the Geyer Springs East
District Land Use Plan be amended to Office for this site.
Ms. Ball addressed the Commission in support of her
application. She stated that the property was in her
parents' estate and that the heirs wanted to dispose of it.
Ms. Ball stated that it was difficult to keep the home
rented due to the house's close proximity to Baseline Road.
Ms. Ball made note of the many non-residential uses along
this portion of Baseline Road. She stated that a business
would be a more preferable use of the property than a
boarded up house.
Larry Daniel, of 8806 Community Road, addressed the
Commission. He stated that he lived adjacent to the site
and that he was opposed to the proposed C-1 zoning. Mr.
Daniel stated he was not opposed to 0-3 zoning.
Milton Anderson, of 8722 Community Road, spoke in support of
the C-1 zoning. He presented a letter from the Upper
Baseline.Neighborhood Association which urged approval of
the commercial zoning request.
In response to a question from Commissioner Chachere, staff
stated that there were very few single family residences
left on the north side of Baseline Road.
In response to a question from Acting Chairman Ball, Ms.
Ball'stated that no particular use was proposed for the
site. She stated that she felt the site was not an
appropriate office location and she again described other
commercial uses in the area.
Commissioner Adcock asked if C-2 was an appropriate zoning
for the site. Dana Carney, of the Planning Staff, responded
that the C-2 Shopping Center District required a minimum
site area of 5 acres.
In response to a question from Commissioner Lichty, Ms. Ball
stated that she had reviewed the list of allowable uses in
the 0-3 district but that she felt the C-1 district allowed
more uses that would facilitate a sale of the property.
Commissioner Lichty noted that the 0-3 district allows uses
other than offices.
Commissioner Hawn stated that he was
effect of the zoning on the neighbor
property. He noted that the neighbor
3
concerned about the
adjacent to Ms. Ball's
had agreed to 0-3
January 2,-1996
ITEM 4 -Z-6Q76 n
zoning. Ms. Ball responded that she did not want to do
anything detrimental to the neighbor.
Acting Chairman Ball told Ms. Ball that the Commission
seemed to be expressing concern about the C-1 zoning and
offered her the opportunity to amend the application.
Commissioner Putnam stated that 0-3 zoning was not feasible
for this site. He stated that he felt the proposed C-1
zoning would not impact the neighborhood.
Jim Lawson, Director of the Department of Neighborhoods and
Planning, urged the commission to adhere to the Land Use
Plan and to deny the requested commercial zoning.
Commissioner Lichty stated that he could not support
commercial zoning for the site, not knowing what the
proposed use might be.
In response to a question from Commissioner Putnam, Cindy
Dawson of the City Attorney's Office stated that the
applicant could offer to restrict the list of permitted uses
within a particular zoning classification.
Acting Chairman Ball then offered Ms. Ball the opportunity
to either amend the application or accept a vote on the C-1
request. Ms. Ball stated that she was amending her
application to 0-3.
Commissioner Rahman reminded Ms. Ball that she could come
back to the Commission with a planned development
application if a particular commercial use is proposed for
the site.
A motion was made to approve the application as amended to
0-3. The motion was approved by a vote of 11 ayes, 0 noes
and 0 absent. The vote also approved an amendment to the
Geyer Springs East District Land Use Plan to Office for this
site.
4
NAME: Land Use Plan Amendment -
Geyer Springs East
District
LOCATION: North of Baseline; west
of Community Lane
REQUEST: Mixed Residential to
office
SOURCE: Staff - Z-6076
STAFF REPORT:
As part of a rezoning case review, the City Land Use Plan in
the area was reviewed. The adopted Land Use Plan recommends
Mixed Residential. The request is for Office use. Upon
review of the area, Staff believes a higher use is allowable
for the area.
The Plan and zoning pattern are Office to the West, though
the land is vacant. The land use and zoning to the east is,
Commercial. Staff is comfortable with either residential or
office in this situation. Thus to allow the owner to
proceed, the Office use area should be continued to the
east. The result is for the first 200 feet north of
Baseline to be Office, west of Community Lane.
STAFF RECOMMENDATI414:
Approval