HomeMy WebLinkAboutZ-6054 Staff AnalysisFILE Z_6054
NAME: B. F. PROPERTIES -- LONG -FORM PLANNED DEVELOPMENT -
COMMERCIAL
LOCATION: At the southwest corner of the Stagecoach Rd. and
Crystal Valley Rd. intersection.
DEVELOPER:
Bill Fitts
B. F. PROPERTIES
8420 Stagecoach Rd.
Little Rock, AR 72210
455-0612
AREA• 5.134 ACRES
ENGINEER,
Samuel L. Davis
S. DAVIS CONSULTING, INC.
5301 West 8th. Street
Little Rock, AR 72204
664-0324
NUMBER OF LOTS: 1 FT. NEW STREET:
ZONING: R-2 PROPo 9 ED V- ES
PLANNING DISTRICT: 17
CENSUS TRACT: 42.08
Mini-Warehouse/Industrial;
Office; Residence
VARIANCES RE UE TED: Approval of a waiver of Master Street Plan
improvements for Stagecoach Rd./Highway 5.
STATEMENT OF PR PO AL:
The applicant proposes a planned development for a mini -warehouse
facility. The site is a 5.134 acre tract; however, the floodway
consumes a large portion of the tract, so that the area for
development is 2.51 acres. Eleven buildings are planned; all are
for mini -warehouse use, except that one building is to contain
space for an off ice/manager's apartment. The total building
coverage is 48,500 square feet, of which 47,625 square feet is
for mini -warehouse use and 825 square feet is the office, with a
residence above the office of an additional 825 square feet.
Designated parking spaces for 11 vehicles are provided. The
facility is to be fenced, with the east boundary fence being a 6
foot board fence; a gate is proposed. Site lighting is to be
Arkansas Power and Light Co. "Night -watchers" along the perimeter
and eave lighting on the buildings. The hours of operation are
to be from 7:00 AM to 7:00 PM daily, except that on Sunday, the
hours are to be from 1:40 PM to 7:00 PM. One 8 foot by 10 foot,
18 foot tall sign is proposed to be located at the drive entrance
to the project. It is anticipated that construction on the
project will commence as soon as possible.
FILE N Z-6054 (Cont.)
The applicant states that the typical minimum finished floor
elevation is to be at 291 feet MSL (Mean Sea Level), and that
this elevation is 1 foot above the 100 -year flood elevation.
The applicant proposes to dedicate the required additional right-
of-way, pursuant to the Master Street Plan requirements; that
additional land to provide right-of-way width of 55 feet from the
existing centerline of Stagecoach Rd. will be dedicated. The
applicant points out, however, that, because of the location of a
major Southwestern Bell Telephone fiber optic easement along the
existing right-of-way, the Arkansas Highway and Transportation
Department proposes to shift planned improvements to Stagecoach
Rd./Highway 5 northward, and that the alignment of Stagecoach
Rd./Highway 5 will not follow the existing centerline. He
maintains that the requirement to dedicated additional right-of-
way to provide a minimum of right-of-way of 55 feet from
centerline will mean that excess right-of-way will be dedicated
which will not be used.
The applicant notes that the Arkansas Highway and Transportation
Department plans to reconstruct Stagecoach Rd./Highway 5 in this
section of the roadway, and has preliminary plans for the
alignment. The applicant requests a waiver of the requirement to
provide half -street improvements to Stagecoach Rd./Highway 5,
especially since the alignment will be changed. The applicant
also points out that approximately 240 feet of the frontage abuts
the floodway, and is not developable area. The applicant
proposes, though, to construct a deceleration lane at the drive
entrance to the site.
Alternatively, the applicant requests approval of C-3 "by -right"
uses, and approval of two retail buildings with a total floor
area of 35,760 square feet. (one building, located along the
east property line, is proposed to be 60 feet deep by 384 feet
long, containing 23,040 square feet; the other, located parallel
with the south floodway line, is to be 60 feet deep by 212 feet
long, containing 12,720 square feet.) Parking and landscaping,
as required for the alternate uses, is proposed to be provided.
This alternative proposal is a "back-up" request for future
development, as dictated by the market for various uses.
A. PROPOSAL/REQUEST:
Review by the Planning Commission and a recommendation for
approval to the Board of Directors for a planned development
is requested.
Review by the Planning Commission and a recommendation for
approval of a waiver of half -street improvements to
Stagecoach Rd./Highway 5 is requested.
2
FILE Z-6054 n
B.
C.
E?�I TI NDITTaN
The site is currently
vegetation and trees.
across and along the
undeveloped, and is mostly cleared of
Haw Branch of Fourche Creek runs
south boundary of the tract.
The current zoning of the site is R-2, with land to the east
being R-2 zoned property. Abutting the site to the south is
an OS zoned strip in which the creek lies. I-2 land lies
across the creek floodway to the south. Across Stagecoach
Rd., at the northeast corner of the tract, is a C-2 area,
where the applicant's automotive sales business is located.
Other land along the Stagecoach Rd. frontage opposite the
tract is zoned R-2.
ENGINEERING/UTILITY COMMENTS:
Public Works Staff comments:
Dedication of right-of-way and half -street improvements
for Stagecoach Rd., per the Master Street Plan, will be
required. The highway is a principal arterial, with a
requirement for 110 feet of right-of-way and 66 feet of
pavement. The radius of the highway centerline should
be 1400 feet, versus the existing 470 foot radius.
Arkansas Highway and Transportation Department will
need to permit any planned construction.
The site is partially in the Haw Branch of Fourche
Creek. Sketch plan information, including a topography
and Base Flood Elevation, with proposed finished floor
elevations for all structures, must be provided.
An SFHA development permit, grading permit, NPDES and
Corps of Engineers approval are required prior to any
construction.
Proposed driveway locations and design need approval of
the Traffic Engineer.
Water Works comments that a pro -rata charge of $15 per front
foot and $150 per acre applies in this area, and that this
is in addition to the normal connection fees. On-site fire
protection will be required. The location of the water
meter may be different than the location shown on the plan.
Wastewater comments that sewer service is available.
Arkansas Power and Light Co. did not furnish comments.
Arkansas Louisiana Gas Co. approved the submittal.
3
FILE Z-6054
Southwestern Bell Telephone Co. did not furnish comments.
The Fire Department approved the submittal.
D. IS5VE5/LEGAL TECHN_ICALLDE IG :
Sec. 36-456 requires: a) that the areas to be conveyed and
dedicated, or retained as an open space or drainage
easements to be designated; b) a topographic cross section
of the site, and contours, watercourses, floodplains, etc.
be shown; and, c) that a preliminary plat be provided, with
Sections 31-87 and following, setting the requirements for
preliminary plats.
Sec. 36-502 sets the requirements for parking. Warehouse
uses are to provide 5 spaces, plus 1 space for each 2000
square feet of gross floor area. There is 47,625 square
feet of warehouse area, requiring a total of 24 parking
spaces. There is 825 square feet of office area, requiring
2 space. There is a residence requiring 1 space. The total
parking required by the parking regulations, then, is 27
spaces; 11 are designated, plus available parking at each
tenant's lease space.
The Neighborhoods and Planning Site Plan Review Specialist
notes that the proposed on-site buffer width along
Stagecoach Rd. and along the east property line drop below
the minimum requirement of 14 feet. The full buffer width
requirement is 21 feet. Since the property to the east is
zoned residential, a 6' high opaque wood fence, with the
structural supports facing inward, or dense evergreen
plantings, will be required along the eastern site
perimeter. Since the adopted Land Use Plan shows the
abutting area to the east as mixed commercial and
industrial, and development is not likely to be residential,
the Commission may approve a minimum landscape strip of 6
feet.
E. ANALYSIS•
The Planning staff reports that the requested Planned
Development is located in the Otter Creek District, and that
the adopted Land Use Plan recommends Mixed Commercial and
Industrial uses. There is, then, no land use issue.
The Land Use Plan recommends that the floodway on the
subject tract be retained for park and open space use. The
applicant has not indicated that he plans to dedicate the
floodway to the City, but this area, as a minimum, should be
set aside and designated on the plan as open space. Unless
there is some reason to the contrary, 'the applicant should
dedicate the floodway to the City.
4
FILE Z-6054
On-site parking appears sufficient.
The deficiencies in the plans and submittals which are noted
are, for the most part, minimal and can be completed by the
applicant either prior to the Planning Commission hearing,
or after the hearing, but before approval of the final plan.
The landscape or buffer requirement along the east property
line must, however, be met, and this will entail some
minimal site re -design. The Commission may impose, based on
the Land Use Plan, only the landscape requirement of a 6
foot minimum landscape strip along the east property line in
lieu of the minimum 14 foot land use buffer requirement.
The matter of the requested waiver of Master Street Plan
improvements to Stagecoach Rd. needs to be addressed by
Public Works. If, indeed, the alignment is to be changed,
then it makes no sense for the applicant to construct half
street improvements. Either a deferral or an "in -lieu"
payment may be appropriate.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development, as
proposed, subject to amending the site plan to conform to
the landscape requirement. Staff recommends approval of the
imposition of the landscape requirement along the east
property line in lieu of the land use buffer requirement.
A recommendation by Public Works on the requested waiver
needs to be made.
SUBDIVISION COMMITTEE COMMENT: (OCTOBER 12, 1995)
Mr. Bob McFarlane, representing the applicant, was present.
Staff outlined the request, and the Committee reviewed with the
applicant the comments contained in the discussion outline. The
Public Works staff outlined their concerns regarding the location
of the main entrance drive, and the alignment of Stagecoach Rd.
was discussed. Mr. McFarlane presented a Highway Department
drawing of the proposed alignment, and a Southwestern Bell
drawing of the location of the fiber optic installation. The
Public Works staff suggested that staff and Mr. McFarlane meet
again to discuss the right-of-way issue. Mr. McFarlane indicated
that other staff concerns would be addressed, and that an amended
site plan would be prepared. The Committee forwarded the item to
the full Commission for the public hearing.
5
FILE Z-6054(Cont.)
P I MMi I❑ ACTION:
(OCTOBER 31, 1995)
Staff reported that all issues had been resolved. The item was
included on the Consent Agenda for a recommendation to the Board
of Directors of approval, and the recommendation was approved
with the approval of the Consent Agenda with the vote of 9 ayes,
0 nays, 2 absent, and 0 abstentions.
October X31, 1995
ITEM 7 FILE NO.: Z- r n54
NAME: B. F. PROPERTIES -- LONG -FORM PLANNED DEVELOPMENT -
COMMERCIAL
LOCATION: At the southwest corner of the Stagecoach Rd. and
Crystal Valley Rd. intersection.
DEVELOPER:
Bill Fitts
B. F. PROPERTIES
8420 Stagecoach Rd.
Little Rock, AR 72210
455-0612
AREA• 5.134 ACRES
ENGI ER:
Samuel L. Davis
S. DAVIS CONSULTING, INC.
5301 West 8th. Street
Little Rock, AR 72204
664-0324
NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2 PROP SED USES: Mini-Warehouse/Industrial;
Office; Residence
PLANNING DISTRICT: 17
CENSUS TRACT: 42.08
VARIANCES RE [IE TED: Approval of a waiver of Master Street Plan
improvements for Stagecoach Rd./Highway 5.
STATEMENT OF PROPOSAL:
The applicant proposes a planned development for a mini -warehouse
facility. The site is a 5.134 acre tract; however, the floodway
consumes a large portion of the tract, so that the area for
development is 2.51 acres. Eleven buildings are planned; all are
for mini. -warehouse use, except that one building is to contain
space for an office/manager's apartment. The total building
coverage is 48,500 square feet, of which 47,625 square feet is
for mini -warehouse use and 825 square feet is the office, with a
residence above the office of an additional 825 square feet.
Designated parking spaces for 11 vehicles are provided. The
facility is to be fenced, with the east boundary fence being a 6
foot board fence; a gate is proposed. Site lighting is to be
Arkansas Power and Light Co. "Night -watchers" along the perimeter
and eave lighting on the buildings. The hours of operation are
to be from 7:00 AM to 7:00 PM daily, except that on Sunday, the
hours are to be from 1:00 PM to 7:00 PM. One 8 foot by 10 foot,
18 foot tall sign is proposed to be located at the drive entrance
to the project. It is anticipated that construction on the
project will commence as soon as possible.
October �1, 1995
BDIVIOION
ITEM NO.,• 7 on FILE NO.: z-6054
The applicant states that the
elevation is to be at 291 feet
this elevation is 1 foot above
typical minimum finished floor
MSL (Mean Sea Level), and that
the 100 -year flood elevation.
The applicant proposes to dedicate the required additional right-
of-way, pursuant to the Master Street Plan requirements; that
additional land to provide right-of-way width of 55 feet from the
existing centerline of Stagecoach Rd. will be dedicated. The
applicant points out, however, that, because of the location of a
major Southwestern Hell Telephone fiber optic easement along the
existing right-of-way, the Arkansas Highway and Transportation
Department proposes to shift planned improvements to Stagecoach
Rd./Highway 5 northward, and that the alignment of Stagecoach
Rd./Highway 5 will not follow the existing centerline. He
maintains that the requirement to dedicated additional right-of-
way to provide a minimum of right-of-way of 55 feet from
centerline will mean that excess right-of-way_will be dedicated
which will not be used.
The applicant notes that the Arkansas Highway and Transportation
Department plans to reconstruct Stagecoach Rd./Highway 5 in this
section of the roadway, and has preliminary plans for the
alignment. The applicant requests a waiver of the requirement to
provide half -street improvements to Stagecoach Rd./Highway 5,
especially since the alignment will be changed. The applicant
also points out that approximately 240 feet of the frontage abuts
the floodway, and is not developable area. The applicant
proposes, though, to construct a deceleration lane at the drive
entrance to the site.
Alternatively, the applicant requests approval of C-3 "by -right"
uses, and approval of two retail buildings with a total floor
area of 35,760 square feet. (One building, located along the
east property line, is proposed to be 60 feet deep by 384 feet
long, containing 23,040 square feet; the other, located parallel
with the south floodway line, is to be 60 feet deep by 212 feet
long, containing 12,720 square feet.) Parking and landscaping,
as required for the alternate uses, is proposed to be provided.
This alternative proposal is a "back-up" request for future
development, as dictated by the market for various uses.
A. PROPOSAL/REOUES :
Review by the Planning Commission and a recommendation for
approval to the Board of Directors for a planned development
is requested.
Review by the Planning Commission and a recommendation for
approval of a waiver of half -street improvements to
Stagecoach Rd./Highway 5 is requested.
October 31, 1995
BDIVI I
ITEM 7 ont FILE ND Z-6054
B. EXISTING C01MI'I`10-a:
The site is currently undeveloped, and is mostly cleared of
vegetation and trees. Haw Branch of Fourche Creek runs
across and along the south boundary of the tract.
The current zoning of the site is R-2, with land to the east
being R-2 zoned property. Abutting the site to the south is
an OS zoned strip in which the creek lies. I-2 land lies
across the creek floodway to the south. Across Stagecoach
Rd., at the northeast corner of the tract, is a C-2 area,
where the applicant's automotive sales business is located.
Other land along the Stagecoach Rd. frontage opposite the
tract is zoned R-2.
C. ENGINEERING/UTILITY COMMENT :
Public Works Staff comments:
Dedication of right-of-way and half -street improvements
for Stagecoach Rd., per the Master Street Plan, will be
required. The highway is a principal arterial, with a
requirement for 110 feet of right-of-way and 66 feet of
pavement. The radius of the highway centerline should
be 1400 feet, versus the existing 470 foot radius.
Arkansas Highway and Transportation Department will
need to permit any planned construction.
The site is partially in the Haw Branch of Fourche
Creek. Sketch plan information, including a topography
and Base Flood Elevation, with proposed finished floor
elevations for all structures, must be provided.
An SFHA development permit, grading permit, NPDES and
Corps of Engineers approval are required prior to any
construction.
Proposed driveway locations and design need approval of
the Traffic Engineer.
Water Works comments that a pro -rata charge of $15 per front
foot and $150 per acre applies in this area, and that this
is in addition to the normal connection fees. On-site fire
protection will be required. The location of the water
meter may be different than the location shown on the plan.
Wastewater comments that sewer service is available.
Arkansas Power and Light Co. did not furnish comments.
Arkansas Louisiana Gas Co. approved the submittal.
3
October 31, 1995
HDIVI I
ITEM 7 n FILE NO.: Z - 6Q54
Southwestern Bell Telephone Co. did not furnish comments.
The Fire Department approved the submittal.
D. 12_$ES/LEGAL TECHNICAL DESIGN:
Sec. 36-456 requires: a) that the areas to be conveyed and
dedicated, or retained as an open space or drainage
easements to be designated; b) a topographic cross section
of the site, and contours, watercourses, floodplains, etc.
be shown; and, c) that a preliminary plat be provided, with
Sections 31-87 and following, setting the requirements for
preliminary plats.
Sec. 36-502 sets the requirements for parking. Warehouse
uses are to provide 5 spaces, plus 1 space for each 2000
square feet of gross floor area. There is 47,625 square
feet of warehouse area, requiring a total of 24 parking
spaces. There is 825 square feet of office area, requiring
2 space. There is a residence requiring 1 space. The total
parking required by the parking regulations, then, is 27
spaces; 11 are designated, plus available parking at each
tenant's lease space.
The Neighborhoods and Planning Site Plan Review specialist
notes that the proposed on-site buffer width along
Stagecoach Rd. and along the east property line drop below
the minimum requirement of 14 feet. The full buffer width
requirement is 21 feet. Since the property to the east is
zoned residential, a 6' high opaque wood fence, with the
structural supports facing inward, or dense evergreen
plantings, will be required along the eastern site
perimeter. Since the adopted Land Use Plan shows the
abutting area to the east as mixed commercial and
industrial, and development is not likely to be residential,
the Commission may approve a minimum landscape strip of 6
feet.
E. ANALYSIS:
The Planning staff reports that the requested Planned
Development is located in the Otter Creek District, and that
the adopted Land Use Plan recommends Mixed Commercial and
Industrial uses. There is, then, no land use issue.
The Land Use Plan recommends that the floodway on the
subject tract be retained for park and open space use. The
applicant has not indicated that he plans to dedicate the
floodway to the City, but this area, as a minimum, should be
set aside and designated on the plan as open space. Unless
4
October 31, 1995
SUBDIVISIOI�I
ITEM NO.: 7 n FILE O: Z-6 4
there is some reason to the contrary, the applicant should
dedicate the floodway to the City.
On-site parking appears sufficient.
The deficiencies in the plans and submittals which are noted
are, for the most part, minimal and can be completed by the
applicant either prior to the Planning Commission hearing,
or after the hearing, but before approval of the final plan.
The landscape or buffer requirement along the east property
line must, however, be met, and this will entail some
minimal site re -design. The Commission may impose, based on
the Land Use Plan, only the landscape requirement of a 6
foot minimum landscape strip along the east property line in
lieu of the minimum 14 foot land use buffer requirement.
The matter of the requested waiver of Master Street Plan
improvements to Stagecoach Rd. needs to be addressed by
Public Works. If, indeed, the alignment is to be changed,
then it makes no sense for the applicant to construct half
street improvements. Either a deferral or an "in -lieu"
payment may be appropriate.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the planned development, as
proposed, subject to amending the site plan to conform to
the landscape requirement. Staff recommends approval of the
imposition of the landscape requirement along the east
property line in lieu of the land use buffer requirement.
A recommendation by Public Works on the requested waiver
needs to be made.
SUBDIVISION COMMITTEE COMMENT:
(OCTOBER 12, 1995)
Mr. Bob McFarlane, representing the applicant, was present.
Staff outlined the request, and the Committee reviewed with the
applicant the comments contained in the discussion outline. The
Public Works staff outlined their concerns regarding the location
of the main entrance drive, and the alignment of Stagecoach Rd.
was discussed. Mr. McFarlane presented a Highway Department
drawing of the proposed alignment, and a Southwestern Bell
drawing of the location of the fiber optic installation. The
Public Works staff suggested that staff and Mr. McFarlane meet
again to discuss the right-of-way issue. Mr. McFarlane indicated
that other staff concerns would be addressed, and that an amended
site plan would be prepared. The Committee forwarded the item to
the full Commission for the public hearing.
5
r
October� 31, 1995
Lq BDIVI I
ITEM NO 7 n FILE N Z-5 4
pliAiWIN G COMMT 4>10N ACTIO :
(OCTOBER 31, 1995)
Staff reported that all issues had been resolved.. The item was
included on the Consent Agenda for a recommendation to the Board
of Directors of approval, and the recommendation was approved
with the approval of the Consent Agenda with the vote of 9 ayes,
0 nays, 2 absent, and 0 abstentions.
6