A conditional use permit is
requested to allow for a church
gymnasium on this R-2 zoned
property.
The proposed site is located at the southwest corner of
Crystal Valley Road and Lawson Road.
2. Comj)atibility with Neighborhood:
The proposed site is bordered by vacant, wooded land to the
east and south, an existing church building to the north
across Crystal Valley Road, and Lawson Road to the west.
The proposal should have little effect on the surrounding
property.
3. On -Site Drives and Parkln :
A 71 space parking lot exists on the property. Twenty-two
new parking spaces are proposed with the construction. The
proposed use does not require any additional on-site
parking.
4. Screening and H ffers:
Compliance with the City's Landscape and Buffer Ordinances
is required.
The existing parking lot projects over the full buffer
requirement of 50.feet by 44 feet. The average minimum
requirements is 33 feet. The Landscape Ordinance
requirement is 6 feet.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
FILE Z -(Cont.)
5. City Engineer's Comments:
Applicant should contact Betty Smith, Pulaski County
Floodplain Administrator, for Flood Zone determination prior
to permit.
This property lies at the intersection of a principal
arterial and a minor arterial. Applicant was advised prior
to this application to submit a plan for the rights-of-way
and street improvements as desired by applicant to allow
this intersection to function. That request was not
included in this application. Therefore, this application
should be denied until the study is completed. This plan
should be revised and resubmitted showing the above,
including: street improvements, sidewalks, driveways that
conform to ordinance and circulation and parking for buses.
Stormwater detention analysis will be required.
6. nrility and Fire Comments:
Little Rock Municipal Water Works requires execution of a
pre -annexation agreement. On-site fire protection may be
required when annexed to the City.
Fire Department Comment: The parking lot should have a
clearance of at least 20 feet for each aisle including both
entrances.
7. Staff Analysis:
The applicant proposes an 18,720 square foot gymnasium on
this R-2 zoned, 20.38 acre site. The property is located
approximately 2.5 miles outside the Little Rock city limits,
within the City's extraterritorial zoning jurisdiction. The
proposed site is partially cleared and contains a 71 space
parking lot which does not conform to the City's Landscape
Ordinance.
The existing parking lot serves the church which is across
Crystal Valley Road to the north.
8, staff Recommenda
Staff recommends approval of the application subject to the
following conditions:
1. Compliance with the City's Landscape and Buffer
Ordinances
2. Compliance with City Engineer Comments
3. Compliance with Utility Comments
01
FILE Z-
SOBDIVISYQN CQMMZTTEE COMMENT:
(OCTOBER 12, 1995)
Larry Ballard was present, representing the application.
David Scherer, of Public Works, reviewed his comments and there
was a lengthy discussion regarding the right-of-ways and street
improvements needed to allow this intersection to function.
The Committee accepted the presentation and forwarded the issue
to the full Commission for final action.
PLANNTN MM DN ACTS:
(OCTOBER 31, 1995)
The Staff presented a positive recommendation on this application
as there were no further issues for resolution. There were no
objectors to this matter.
Monte Moore, of the Planning Staff, explained to the Commission
that the applicant has requested a deferral in street
improvements until the property is redeveloped with a future
phase of the church and that if placed on the Consent Agenda, a
recommendation of approval of the deferred improvements would be
forwarded to the Board of Directors.
David Scherer, of Public Works, explained that his department is
in favor of the deferral, but a more specific request will be
formulated before being sent to the Board of Directors.
The Chairman placed the item before the Commission for inclusion.
within the Consent Agenda for approval.
A motion to that effect was made. The motion was passed by a
vote of 9 ayes, 0 nays and 2 absent.
3
October 31, 1995
TEM N 2 F%L? ATO.: "'
NAME:
LO a I QN -
OWNER 1A_aPL2 LNT:
PROP05AL:
OR 5=ATAAi E DESIGN
1, �tLocati n:
Crystal Hill Baptist Church -
Conditional Use Permit
18,824 Crystal Valley Road
Crystal Hill Baptist Church,
Larry Ballard, Pastor
A conditional use permit is
requested to allow for a church
gy-=asium on this R-2 zoned
property.
The proposed site is located at the southwest comer of
Crystal Valley Road and Lawson Road.
2, Com atibility with N ichhorh d:
The proposed site is bordered by vacant, wooded land to the
east and south, an existing church building to the north
across Crystal valley Road, and Lawson Road to the west.
The proposal should have little effect on the surrounding
property.
3. on -Site Drives and Parking:
A 71 space parking lot exists on the property. Twenty-two
new parking spaces are proposed with the construction. The
proposed use does not require any additional on-site
parking.
4. Egregning And Buffe_rS:
Compliance with the City's Landscape and Buffer Ordinances
is required.
The existing parking lot projects over the full buffer
requirement of 50 feet by 44 feet. The average minimum
requirements is 33 feet. The Landscape Ordinance
requirement is 6 feet.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
October 31, 1995
St�,HDIVISI�
T F17
Ti 2
5. gi v Engineer' s 90mment-1:
Applicant should contact Betty Smith, Pulaski County
Floodplain Administrator, for Flood Zone determination prior
to permit.
This property lies at the intersection of a principal
arterial and a minor arterial. Applicant was advised prior
to this application to submit a plan for the rights-of-waY
and street improvements as desired by apPlica.:=t to allow
this intersection to function. That request was not
included in this application. Therefore, this application_
should be denied until the study is completed. This plan
should be revised and resubmitted showing the above,
including: street improvements, sidewalks, driveways that
C=,horm to ordinance and circulation and parking for buses.
5to=.gater detention analysts will be required.
6. ❑tility ind Fire Comm nt
Little Rock Municipal water works requires execution of a
pre -annexation agreement. On-site fire protection may be
required when annexed to the City.
Fire Department Comment: The parking lot should have a
clearance of at least 20 feet for each aisle including both
entrances.
7. l ff Analysis:
The applicant proposes an 18,720 square foal gymnasium ❑n
this R-2 zoned, 20.38 acre site. The property is located
approximately 2.5 miles outside the Little Rock city limits,
within the City's extraterritorial Zoning jurisdiction. The
proposed site is partially cleared and contains a 71 space
parking lot which does not conform to the City's Landscape
Ordinance.
The existing parking lot serves the church which is across
Crystal Valley Road to the north.
S. F R mm n i n.
Staff recommends approval of the application subject to the
following conditions:
1. Compliance with the City's Landscape and Buffer
Ordinances
2
October 31, 1995
SUB nxVI x
FILE ND.: �-60
TTEI N 21 C n ?
2. Compliance with City Engineer Comments
3. Compliance with Utility Comments
IIHDIVI ION COMMITTEE C MMENT: (OCTOBER 12, 1995)
Larry Ballard was present, representing the application.
David Scherer, of Public works, reviewed his comments and there
was a lengthy discussion regarding the right-of-ways and street
improvements needed to allow this intersection to function.
The Committee accepted the presentation and forwarded the issue
to the full Commission for final action.
PLANNING C MMI xON A TI N: (OCTOBER 31, 1995)
The Staff presented a positive recommendation on this application
as there were no further issues for resolution. There were no
objectors to this matter.
Monte Moore, of the Planning staff, explairLed to the Commission
that the applicant has requested a deferral in street
improvements until the property is redeveloped with a future
phase of the church and that if placed on the Consent Agenda, a
recommendation of approval of the deferred improvements would be
forwarded to the Board of Directors.
David Scherer, of Public works, explained that his department is
in favor of the deferral, but a more specific request will be
formulated before being sent to the Board of Directors.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval.
A motion to that effect was made. The motion was passed by a
vote of 9 ayes, 4 nays and 2 absent.
3
October 31, 1995
JIrM N 21 FILE N . oZ-
NAM:
LOCATI:
OWNER/APPLICANT•
RDINANCE DESIGN STANDARDS:
1. Site Location:
Crystal Hill Baptist Church -
Conditional Use Permit
18,824 Crystal Valley Road
Crystal Hill Baptist Church,
Larry Ballard, Pastor
A conditional use permit is
requested to allow for a church
gymnasium on this R-2 zoned
property.
The proposed site is located at the southwest corner of
Crystal Valley Road and Lawson Road.
2. CopDatibility with Neighborhood:
The proposed site is bordered by vacant, wooded land to the
east and south, an existing church building to the north
across Crystal valley Road, and Lawson Road to the west.
The proposal should have little effect on the surrounding
property.
3. On -Site Drives and Pa_rkinq:
A 71 space parking lot exists on the property. Twenty-two
new parking spaces are proposed with the construction. The
proposed use does not require any additional on-site
parking.
4. ggre-ening and Buffers:
Compliance with the City's Landscape and Buffer Ordinances
is required.
The existing parking lot projects over the full buffer
requirement of 50 feet by 44 feet. The average minimum
requirements is 33 feet. The Landscape Ordinance
requirement is 6 feet.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic.
October 31, 1995
��BDIVISIOH
mm n
Applicant should contact Betty Smith, Pulaski County
Floodplain Administrator, for Flood Zone determination prior
to permit.
This property Ines at the intersection of a principal
arterial and a minor arterial. Applicant was advised prior
to this application to submit a plan for the rights-of-way
and street improvements as desired by applicant to allow
this intersection to function.. That request was not
included in this application. Therefore, this application
should be denied until the study is completed. This plan
should be revised and resubmitted showing the above,
including: street improvements, sidewalks, driveways that
conform to ordinance and circulation and parking for buses.
Stormwater detention analysis will be required.
6. IItiIity nd Fire Comment :
Little Rock Municipal Water Works requires execution of a
pre -annexation agreement. On-site fire protection may be
required when annexed to the City.
Fire Department Comment: The parking lot should have a
clearance of at least 20 feet for each aisle including both
entrances.
7. f f _A4a 1 i
The applicant proposes an 18,720 square foot gymnasium on
this R-2 zoned, 20.38 acre site. The property is located
approximately 2.5 miles outside the Little Rock city limits,
within the City's extraterritorial zoning jurisdiction. The
proposed site is partially cleared and contains a 71 space
parking lot which does not conform to the City's Landscape
Ordinance.
The existing parking lot serves the church which is across
Crystal Valley Road to the north.
8. icer a f f Recommendat ion:
Staff recommends approval of the application subject to the
following conditions:
1. Compliance with the City's Landscape and Buffer
Ordinances
2
October 31, 1995
S12BD VT I
2. Compliance with City Engineer Comments
3. Compliance with Utility Comments
SUBDIVISION MMITTEE MMENT: (OCTOBER 12, 1995)
Larry Ballard was present, representing the application.
David Scherer, of Public Works, reviewed his comments and there
was a lengthy discussion regarding the right-of-ways and street
improvements needed to allow this intersection to function.
The Committee accepted the presentation and forwarded the issue
to the full Commission for final action.
PLANNING C-0mmiS ION ACTIO : (OCTOBER 31, 1995)
The Staff presented a positive recommendation on this application
as there were no further issues for resolution. There were no
objectors to this matter.
Monte Moore, of the Planning Staff, explained to the Commission
that the applicant has requested a deferral in street
improvements until the property is redeveloped with a future
phase of the church and that if placed on the Consent Agenda, a
recommendation of approval of the deferred improvements would be
forwarded to the Board of Directors.
David Scherer, of Public Works, explained that his department is
in favor of the deferral,
sentbut
to themore
Boardspecific
Directorswill be
formulated before
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval.
A motion to that effect was made. The motion was passed by a
vote of 9 ayes, 0 nays and 2 absent.
3