Loading...
HomeMy WebLinkAboutZ-6039-A Staff Analysis'September 25, 1995 Fill NoN : caner' Address: DescriP-LL n • Zoned• Variance Requested: Justification: Present Use of Proper: Proposed Use of Prop y_ : Staff Report: A. EncTineerincr Issues: Z -6039-A E -Z Mart Stores, Incorporated 11701 West Markham Street Lot "A", Markham Pines Addition R-2 (A C-3 rezoning request will be heard by the Planning Commission on October 3, 1995.) Variances are requested from the area regulations of Section 36-301 and the building line provisions of Section 31-12 to permit construction of a canopy with a reduced front yard setback and which crosses a platted 40 foot building line. The proposed canopy is to replace an existing, smaller canopy with the same setback. The canopy will be built over existing gas pumps which are not to be relocated as part of the remodeling proposed for this store. Convenience store with gas pumps Convenience store with gas pumps Widen Alamo Drive 6 feet to allow left turn lane. Dedicate additional ROW such that property line is 30 feet from centerline, prior to dedication, clearance of underground soils must be certified due to underground storage tanks. Improve sidewalks to eliminate tripping areas and install ramps at intersection. Provide additional sidewalk to provide 3 feet clearance around telephone pole in walk. Eliminate driveway on Markham closest to Alamo. B. staff Analysis: E -Z Mart Convenience Store was in existence at this location at the time the property was annexed to the City on June 5, 1978. S,aptember 25, 1995 Item No.: 1 (Co Land which is annexed to the City is classified as R-2, single family residential. As such, the convenience store is nonconforming. An application has been filed with the Planning commission asking that the property be rezoned to C-3, General Commercial. The rezoning request will be heard by the Commission on October 3, 1995. The rezoning application and this accompanying variance request are necessary to allow for the planned remodeling of the convenience store. The remodeling includes the addition of a second pump island and a new, larger canopy which will extend from the building to a point 5 feet from the West Markham Street property line. Once the property is zoned C-3, it will have a required front yard setback of 25 feet. Variances are requested to allow for the new canopy to have a reduced front yard setback of 5 feet and to allow it to be built across a platted 40 foot building line. The proposed canopy will have a clearance of 15.6 feet from the ground and the support posts will be located at the pump islands. This larger canopy, extending from the building out over the pump islands, will replace a smaller, freestanding canopy which is currently over the pump island nearest Markham Street. The existing canopy has a setback from Markham Street similar to that proposed for the new structure. The new canopy will have no greater impact than the existing canopy. The clearance of 15.6 feet will preclude a sight distance problem. Staff believes the proposal to be reasonable and supports the requested front yard setback and building line variances. If the building line variance is approved, the applicant will have to do a one lot replat to reflect the change approved by the Board. The applicant should review the filing procedure with the circuit clerk to determine if the replat requires a revised Bill of Assurance. C. Staff Recommendation: Staff recommends approval of the requested front yard setback and building line variances subject to the following conditions: 1. Compliance with the City Engineer's Comments 2. A replat of the lot which reflects the change in the building line as approved by the Board of Adjustment. 3. The property being rezoned to C-3. 2 September 25, 1995 item No... 1 .(Cont.) BOARD OF A3]JIISTMENT: (SEPTEMBER 25, 1995) The item as moved to the end of the agenda as the applicant was not present when the item was first called up. The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval, with conditions. The applicant offered no additional comments other than to say that he understood and agreed with the staff recommendation. A motion was made to approve the requested front yard setback and building line variances subject to compliance with the three conditions outlined in the staff recommendation. The motion was approved by a vote of 8 ayes, 0 noes and 1 absent. 3