HomeMy WebLinkAboutZ-6019-B Staff AnalysisFILE NO.: Z-6019-B
NAME: GMAC - Long -Form POD
LOCATION: Southwest corner of Chenal Parkway and LaGrande Drive
DEVELOPER: ENGINEER:
Barnes Quinn Flake & Anderson
400 W. Capitol Avenue
Little Rock, AR 72201
White-Daters and Associates
401 S. Victory Street
Little Rock, AR 72201
AREA: 33.4 acres NUMBER OF LOTS: 1 FT. NEW STREET: 550 if
ZONING: O-2/R-2/PCD ALLOWED USES: Office
PROPOSED USE: Office
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The majority of this property is zoned 0-2, with a small portion
of R-2 and PCD (part of the large PCD on the north side of
LaGrande Dr.). The existing GMAC office building (27,000 square
feet, 30 feet in height) and associated parking areas are
located within the southeast corner of the property. Access to
the site is gained by utilizing an existing drive from LaGrande
Drive, with a future access point shown to Chenal Parkway.
There are currently 268 parking spaces on the site.
A. PROPOSAL/REQUEST:
The applicant proposes to rezone the property to POD to
allow for additional office development in two (2) phases.
Phase I of the project includes construction of a 73,500
square foot (60 foot tall) office building and 402 parking
spaces within the northeast portion of the property.
Access to this phase will be gained by utilizing the
existing drive from LaGrande Drive.
FILE NO.: Z-6019-B (Cont.)
Phase II of the proposed development includes construction
of a 96,500 square foot office building (60 feet in height)
and 783 additional parking spaces within the west one-half
of the property. This phase will also be accessed from the
existing drive from LaGrande Drive as well as a second
drive from LaGrande Drive with the street's extension. A
small portion of the property within Phase II is outside
the city limits. The proposed building locations, parking
areas, drives and landscape areas are noted on the attached
site plan.
The applicant has noted that the hours of operation for the
office development will be 7:00 a.m. to 6:00 p.m. Monday -
Saturday. The applicant has shown two (2) ground -mounted
signs on the site plan, one on each side of the main entry
drive from LaGrande Drive. It is noted that the signs will
not exceed the maximum ordinance allowances. The ordinance
would typically allow signs in office zoning to have a
maximum height of six (6) feet and a maximum area of 64
square feet.
B. EXISTING CONDITIONS:
There is an existing two-story office building and parking
areas on the site. The remainder of the property is
undeveloped, with the western portion being wooded.
There is undeveloped property immediately west of this site
and to the north across LaGrande Drive. There is a mixture
of office and commercial uses to the east across Chenal
Parkway. An AP&L substation and single family residences
on large lots are located to the south along the north side
of Kanis Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received no comment from the
surrounding property owners. There was no established
neighborhood association to notify of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Provide design of
for Chenal.
2. Plans of all work
approval prior to
3. Repair or replace
is damaged in the
occupancy.
Chenal entrance to standards approved
in right-of-way shall be submitted for
start of work.
any curb and gutter
public right-of-way
or sidewalk that
prior to
4. Stormwater detention ordinance applies to this property.
E
FILE NO.: Z-6019-B (Cont.)
5. Easements for proposed stormwater detention facilities
are required.
6. Dedicate regulatory floodway easement to the City of
Little Rock.
7. Chenal Parkway has an average daily traffic count of
11,000.
8. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
9. Existing topographic information at maximum five foot'
contour interval 100 base flood elevation is required.
10. A Sketch Grading and Drainage Plan per Sec. 29-186(e) is
required.
11. A Sketch Grading and Drainage Plan per Secs. 29-186(c)
and (d) is required.
12. A Grading Permit for Special Flood Hazard Area per Sec.
8-283 is required.
13. A Development Permit for Flood Hazard Area per Sec. 8-
283 is required.
14. Contact the ADPC&E for approval prior to start of work
is required.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
AP&L: A 10 foot utility easement is requested along the
south and west property lines.
Arkla: No Comment.
Southwestern Bell: No Comment received.
Water: An acreage charge of $300 per acre applies in
addition to normal charges.
Fire Department: Contact Dennis Free at 918-3752 regarding
information on fire hydrant placement and turning radii.
Count Plannin No Comment.
CATA: Site is not currently served by CATA. Approved for
transit purposes.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is in the Chenal Planning District. The Land
Use Plan currently shows Office. The change to POD is
consistent with the current land use category.
3
FILE NO.: Z-6019-B (Cont.
citV Recognized Neighborhood Action Plan: This area is not
covered by a city neighborhood plan.
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements.
A 6 feet high opaque screen is required along the southern
and a portion of the western perimeter which abut
residential property: This screen may be a wooden fence
with its face side directed outward or dense evergreen
plantings which grow to a height of 6 feet within three
years.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
December 15, 1999. The revised plan provides the
additional notations as required. The hours of operation,
sign and dumpster locations have been shown on the revised
plan. The dumpster areas must be screened on three (3)
sides with an 8 foot wood fence or wall. The applicant
must also provide screening of the project from the
property along the southern boundary and a portion of the
western boundary. This screen can be a six (6) foot wood
fence or dense evergreen plantings which will grow to a
height of six (6) feet in three (3) years.
The ordinance would typically require a minimum of 405
parking spaces for an office development of this size.
There is a total of 1,453 spaces proposed for this entire
development. The applicant noted at the Subdivision
Committee meeting that the industry standard for an office
development was five (5) parking spaces per 1,000 square
feet of floor area. He explained that the number of
parking spaces proposed for this development was based on
the needs of this particular tenant. It was noted that
this particular tenant required 6.5 spaces per 1,000 square
feet of floor area. This is based on the tenant being a
service -type company involving heavy telephone usage and
small work stations.
The 6.5 parking spaces per 1,000 square feet of floor area
is equivalent to one (1) space per 154 square feet of floor
area. This would calculate to 1,279 spaces for the entire
development which has a total building area of 197,000
square feet. Staff has no problem with the parking design
4
FILE NO.: Z-6019-B (Cont.
as proposed, based on adequate buffer/landscape areas and
screening being provided.
As noted at the Subdivision Committee meeting, the
applicant will be given extra credit (toward meeting
landscape ordinance requirements) for portions of the site
where existing trees are preserved. Staff recommends
preserving as many trees as possible within the exterior
buffer (60% of which must remain undisturbed) and interior
landscape areas. Based on the fact that the western one-
half of this property is wooded, staff will recommend that
no additional site work be done until a building permit for
that particular phase is issued.
As noted in paragraph A., a small portion of the property
within Phase II is located outside the city limits. This
small portion must be annexed prior to a building permit
being issued for -Phase II.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with the proposed site plan. The
proposed development should have no adverse effect on the
surrounding property.
H. STAFF RECOrMENDATIONS:
Staff recommends approval of the proposed POD subject to
the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The small portion of the property located outside the
city limits must be annexed prior to a building permit
being issued for Phase II.
3. There is to be no additional site work within the phase
areas until a building permit is issued for the
particular phase.
4.Any site lighting must be low-level and directed away
from adjacent property.
5. The site must comply with the Chenal/Financial Center
Design Overlay District with respect to utilities. Any
utilities between the rear lines of the buildings and
Chenal Parkway must be underground.
6. The dumpster areas must be enclosed on three (3) sides
with an 8 foot wood fence or wall.
7.Based on the fact that the majority of the property is
currently zoned 0-2, staff will recommend 0-2 permitted
uses as a use mix for the development.
5
FILE NO.: Z-6019-B (Cont.
SUBDIVISION COMMITTEE COMMENT: (DECEMBER 9, 1999)
Joe White, Dickson Flake and Kevin Hutchinson were present,
representing the application. Staff described the proposed POD
site plan, noting that some additional information was needed.
The Public Works requirements were briefly discussed. Mr. White
noted that he would meet with Dennis Free regarding the Fire
Department comment.
The primary topic of discussion regarded the proposed number of
parking spaces for this project. Mr. Flake noted that the
industry standard for an office development was five (5) parking
spaces per 1,000 square feet of floor area. He stated that the
proposed number of parking spaces for this development was based
on the needs of a particular tenant. He noted that the
particular tenant required 6.5 spaces per 1,000 square feet of
floor area, based on the fact that it is a servicing company
with heavy telephone usage and small work stations. There was
additional discussion on this topic.
The landscape requirements for this project were briefly
discussed. Bob Brown, Site Plan Review Specialist, noted that
the applicant would be given extra credit for portions of the
site where existing trees are preserved.
After the discussion, the Committee forwarded the item to the
full Commission for resolution.
PLANNING COMMISSION ACTION:
(JANUARY 6, 2000)
Staff presented a positive recommendation on this application,
as there were no further issues for resolution. There were no
objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 11 ayes and 0 nays.
2
January 6, 2000
ITEM NO.: 10
NAME: GMAC - Long -Form POD
FILE NO.: Z-6019-B
LOCATION: Southwest corner of Chenal Parkway and LaGrande Drive
DEVELOPER: ENGINEER:
Barnes Quinn Flake & Anderson White-Daters and Associates
400 W. Capitol Avenue 401 S. Victory Street
Little Rock, AR 72201 Little Rock, AR 72201
AREA: 33.4 acres NUMBER OF LOTS: 1 FT. NEW STREET: 550 if
ZONING: 0-2/R-2/PCD ALLOWED USES: Office
PROPOSED USE: Office
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The majority of this property is zoned 0-2, with a small portion
of R-2 and PCD (part of the large PCD on the north side of
LaGrande Dr.). The existing GMAC office building (27,000 square
feet, 30 feet in height) and associated parking areas are
located within the southeast corner of the property. Access to
the site is gained by utilizing an existing drive from LaGrande
Drive, with a future access point shown to Chenal Parkway.
There are currently 268 parking spaces on the site.
A. PROPOSAL/REQUEST:
The applicant proposes to rezone the property to POD to
allow for additional office development in two (2) phases.
Phase I of the project includes construction of a 73,500
square foot (60 foot tall) office building and 402 parking
spaces within the northeast portion of the property.
Access to this phase will be gained by utilizing the
existing drive from LaGrande Drive.
January 6, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
B.
LW
a
FILE NO.: Z-6019-B
Phase II of the proposed development includes construction
of a 961500 square foot office building (60 feet in height)
and 783 additional parking spaces within the west one-half
of the property. This phase will also be accessed from the
existing drive from LaGrande Drive as well as a second
drive from LaGrande Drive with the street's extension. A
small portion of the property within Phase II is outside
the city limits. The proposed building locations, parking
areas, drives and landscape areas are noted on the attached
site plan.
The applicant has noted that the hours of operation for the
office development will be 7:00 a.m. to 6:00 p.m. Monday -
Saturday. The applicant has shown two (2) ground -mounted
signs on the site plan, one on each side of the main entry
drive from LaGrande Drive. It is noted that the signs will
not exceed the maximum ordinance allowances. The ordinance
would typically allow signs in office zoning to have a
maximum height of six (6) feet and a maximum area of 64
square feet.
EXISTING CONDITIONS:
There is an existing two-story office building and parking
areas on the site. The remainder of the property is
undeveloped, with the western portion being wooded.
There is undeveloped property immediately west of this site
and to the north across LaGrande Drive. There is a mixture
of office and commercial uses to the east across Chenal
Parkway. An AP&L substation and single family residences
on large lots are located to the south along the north side
of Kanis Road.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has received no comment from the
surrounding property owners. There was no established
neighborhood association to notify of the public hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Provide design of
for Chenal.
2. Plans of all work
approval prior to
3. Repair or replace
Chenal entrance to standards approved
in right-of-way shall be submitted for
start of work.
any curb and gutter or sidewalk that
K,
January 6, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.
E.
FILE NO.: Z-6019-B
is damaged in the public right-of-way prior to
occupancy.
4. Stormwater detention ordinance applies to this property.
5. Easements for proposed stormwater detention facilities
are required.
6. Dedicate regulatory floodway easement to the City of
Little Rock.
7. Chenal Parkway has an average daily traffic count of
11,000.
8. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
9. Existing topographic information at maximum five foot
contour interval 100 base flood elevation is required.
10. A Sketch Grading and Drainage Plan per Sec. 29-186(e) is
required.
11. A Sketch Grading and Drainage Plan per Secs. 29-186(c)
and (d) is required.
12. A Grading Permit for Special Flood Hazard Area per Sec.
8-283 is required.
13. A Development Permit for Flood Hazard Area per Sec. 8-
283 is required.
14. Contact the ADPC&E for approval prior to start of work
is required.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
AP&L: A 10 foot utility easement is requested along the
south and west property lines.
Arkla: No Comment.
Southwestern Bell: No Comment received.
Water: An acreage charge of $300 per acre applies in
addition to normal charges.
Fire Department: Contact Dennis Free at 918-3752 regarding
information on fire hydrant placement and turning radii.
County Planning: No Comment.
CATA: Site is not currently served by CATA. Approved for
transit purposes.
3
January 6, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
F.
G.
ISSUES/TECHNICAL/DESIGN:
Planning Division:
FILE NO.: Z-6019-B
This request is in the Chenal Planning District. The Land
Use Plan currently shows Office. The change to POD is
consistent with the current land use category.
City Recognized Neighborhood Action Plan: This area is not
covered by a city neighborhood plan.
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements.
A 6 feet high opaque screen is required along the southern
and a portion of the western perimeter which abut
residential property. This screen may be a wooden fence
with its face side directed outward or dense evergreen
plantings which grow to a height of 6 feet within three
years.
ANALYSIS:
The applicant submitted a revised site plan to staff on
December 15, 1999. The revised plan provides the
additional notations as required. The hours of operation,
sign and dumpster locations have been shown on the revised
plan. The dumpster areas must be screened on three (3)
sides with an 8 foot wood fence or wall. The applicant
must also provide screening of the project from the
property along the southern boundary and a portion of the
western boundary. This screen can be a six (6) foot wood
fence or dense evergreen plantings which will grow to a
height of six (6) feet in three (3) years.
The ordinance would typically require a minimum of 405
parking spaces for an office development of this size.
There is a total of 1,453 spaces proposed for this entire
development. The applicant noted at the Subdivision
Committee meeting that the industry standard for an office
development was five (5) parking spaces er 1 000 s are
P , Qu
feet of floor area. He explained that the number of
parking spaces proposed for this development was based on
4
January 6, �000
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-6019-B
the needs of this particular tenant. It was noted that
this particular tenant required 6.5 spaces per 1,000 square
feet of floor area. This is based on the tenant being a
service -type company involving heavy telephone usage and
small work stations.
The 6.5 parking spaces per 1,000 square feet of floor area
is equivalent.to one (1) space per 154 square feet of floor
area. This would calculate to 1,279 spaces for the entire
development which has a total building area of 197,000
square feet. Staff has no problem with the parking design
as proposed, based on adequate buffer/landscape areas and
screening being provided.
As noted at the Subdivision Committee meeting, the
applicant will be given extra credit (toward meeting
landscape ordinance requirements) for portions of the site
where existing trees are preserved. Staff recommends
preserving as many trees as possible within the exterior
buffer (60% of which must remain undisturbed) and interior
landscape areas. Based on the fact that the western one-
half of this property is wooded, staff will recommend that
no additional site work be done until a building permit for
that particular phase is issued.
As noted in paragraph A., a small portion of the property
within Phase II is located outside the city limits. This
small portion must be annexed prior to a building permit
being issued for Phase II.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with the proposed site plan. The
proposed development should have no adverse effect on the
surrounding property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the proposed POD subject to
the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The small portion of the property located outside the
city limits must be annexed prior to a building permit
being issued for Phase II.
0
January 6, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
FILE NO.: Z-6019-B
3. There is to be no additional site work within the phase
areas until a building permit is issued for the
particular phase.
4. Any site lighting must be low-level and directed away
from adjacent property.
5. The site must comply with the Chenal/Financial Center
Design Overlay District with respect to utilities. Any
utilities between the rear lines of the buildings and
Chenal Parkway must be underground.
6. The dumpster areas must be enclosed on three (3) sides
with an 8 foot wood fence or wall.
7.Based on the fact that the majority of the property is
currently zoned 0-2, staff will recommend 0-2 permitted
uses as a use mix for the development.
SUBDIVISION COMMITTEE COMMENT:
(DECEMBER 91 1999)
Joe White, Dickson Flake and Kevin Hutchinson were present,
representing the application. Staff described the proposed POD
site plan, noting that some additional information was needed.
The Public Works requirements were briefly discussed. Mr. White
noted that he would meet with Dennis Free regarding the Fire
Department comment.
The primary topic of discussion regarded the proposed number of
parking spaces for this project. Mr. Flake noted that the
industry standard for an office development was five (5) parking
spaces per 1,000 square feet of floor area. He stated that the
proposed number of parking spaces for this development was based
on the needs of a particular tenant. He noted that the
particular tenant required 6.5 spaces per 1,000 square feet of
floor area, based on the fact that it is a servicing company
with heavy telephone usage and small work stations. There was
additional discussion on this topic.
The landscape requirements for this project were briefly
discussed. Bob Brown, Site Plan Review Specialist, noted that
the applicant would be given extra credit for portions of the
site where existing trees are preserved.
After the discussion, the Committee forwarded the item to the
full Commission for resolution.
C
January 6, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
FILE NO.: Z-6019-B
PLANNING COMMISSION ACTION: (JANUARY 6, 2000)
Staff presented a positive recommendation on this application,
as there were no further issues for resolution. There were no
objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 11 ayes and 0 nays.
7