HomeMy WebLinkAboutZ-6015 Staff AnalysisNAM: ARKANSAS SYSTEMS -- SITE PLAN REVIEW
LgCATz_Q3: On the east side of Chenal Parkway, approximately 0.5
mile north of the Kanis Rd. intersection
DEVELOPER:
ARKANSAS SYSTEMS
8901 Kanis Rd.
Little Rock, AR 72205
227-8471
AREA: 12 ACRES N RfBER LOT,9:
ZONING: O-2
PLANNING DI TRICT: 19
CENS9S TRA T• 42.06
VARIANCES REOIIE$TED: None
STATE4ENT OF PROPOSAL
�x EER
Joe White
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
1 FT. NEW TREET: 440
PROPOSED USES: Off ices
The applicant proposes the development of the first phase of the
Arkansas Systems corporate campus facility. This first phase is
to be constructed on Lot 2 of the Arkansas Systems Office Park
Subdivision, the preliminary plat of which is being reviewed for
approval on this agenda. The first phase will entail
construction of a 5 -story, 65 foot tall, 150,000 square foot
office building, and parking for approximately 450 vehicles. The
first phase of a future east -west public Collector street is to
be constructed with the development of Lot 2. This street is to
extend eastward from Chenal Parkway, and is to involve,
initially, construction of approximately 440 feet of the street.
The main entrance drive to the development is to be constructed
northward from this new collector street. With this initial
phase, the main entrance drive is to be an 875 foot long. it is
to be a private street built to public street standards. with
the first phase development, the west shoreline of the existing
5 -acre lake will be "groomed and landscaped", and access to the
water's edge will be provided. A masonry wall, Containing the
building name and address, is planned for the northeast corner of
the intersection of the new east -west collector street and the
private entrance drive.
A. PRO 'QSALIKE E T•
Planning Commission review and approval of a site plan is
requested.
B. FIXISTIN92 ONDITIONS:
The property is currently undeveloped. There are dense
woods along the west boundary of the tract, and a pasture
and a 5 -acre lake along the east boundary. The terrain
ranges from gently rolling meadow along the lake to a 15%
grade hillside at the northwest corner of the property.
This hillside, along with a matching hillside to the east,
forms a valley, between witch there is an earthen dam which
backs up water to form the lake.
The existing zoning of the tract is 0-3. The 0-3 zoning
district extends to all abutting tracts in all directions.
C. EN I ERI TILITY COMM -NIM:
The Public Works staff comments that:
1) The unnamed collector street requires a 60 foot right-
of-way and 36 feet of pavement, with sidewalks on both
sides. Chenal Parkway will require sidewalks along the
parkway frontage. The Chenal Parkway intersection at
the unnamed collector must meet City Engineering design
standards.
2) The intersection shown on the submitted plan is located
only 200 feet from the collector's intersection with
Chenal Parkway. This spacing does not meet the
required minimum spacing requirement of 600 feet, as
specified in Sec. 31-285. This street will provide
major access to a multi -office complex, generating
large peak hour volumes and causing the intersection,
as designed, to fail. This intersection should be
moved to the east a minimum of 200 additional feet, and
preferably an additional 400 feet, to provide ample
left turn storage and weaving space to access the
development. Alternatively, the median island might be
extended to restrict left turn movements from the
unnamed collector. The intersection should be within
150 of a 900 intersection. The private street should
be 36 feet in width and have sidewalks on both sides.
The private street should not connect two public
streets, and should be limited to a short loop or be a
cul-de-sac street, where the development served
contains less than 5 acres. See Sec. 31-207.b(2)
3) Stormwater detention will be required for the site.
Open ditches are generally not permitted by the
Stormwater Management and Drainage Manual. If ditches
are planned, they must be shown on the plan and be
2
approved by the City Engineer prior to Planing
Commission approval of the site plan.
4) The location of the unnamed collector is recommended to
be moved south of the dam. Public liability for the
dam would be required if the dam is part of the public
right-of-way. The dam construction shall be certified
by a geotechnical engineer with experience in dam
construction.
5) A sketch plan identifying the floodplain and floodway
way is required before Planning Commission action.
Base flood elevations are required. Dedication of the
floodway is required. A grading and excavation plan
and permit are required. A development permit is
required. USAGE -LRD should be contacted for approval
prior to beginning any work. All drainage structures
for the floodway, including the spillway for the dam,
shall be designed for the 100 year storm.
Little Rock Municipal Water Works comments that a water main
extension and possibly on-site fire protection will be
required. A pro -rata front footage charge of $15.00 per
foot applies along Chenal Parkway, and an acreage charge of
$300 per acre also applies. Annexation to the City will be
required.
Little Rock Wastewater utility comments that a sewer main
extension, with easements, will be required.
Arkansas Power and Light Co. will require 15 foot easements
along the streets abutting the proposed development site.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. comments that an easement
will be required at the northeast corner of the intersection
of the unnamed arterial and Chenal Parkway in order to
construct a fiber optic equipment hub.
The Fire Department noted that on-site fire hydrants will be
required on the site.
The Neighborhoods and Planning Site Review Specialist
comments that: 1) the areas set aside for buffers and
landscaping exceed ordinance requirements; 2) the dumpster
areas must be screened with a minimum S foot high fence or
wall on three sides; and 3) curb and gutter or another
approved border will be required to protect landscaped areas
from vehicular traffic.
3
rA*IftZM .I
D. ISSUESILEGALITFCHNTCAL1DE T
Sec. 36-127 requires Planning Commission review of the
proposed site development for, among other zoning districts,
0-2 zoned land. Since the subject site is zoned 0-2, the
site plan review is required.
Sec. 36-130 requires that the parcel size and the building
coverage of the principal building be denoted.
Sec. 36-280(d) states: ,No building... shall exceed a height
of forth -five (45) feet at the required front, side, or rear
yard setback lines. Building heights ... in excess of forth -
five (45) feet may be authorized by the Planning commission
in conjunction with site plan review." "...one -(1) foot (of
height) may be added to the height of the building for each
foot that the building... is set back from the required yard
lines." ..the maximum height of the building (shall not)
exceed one hundred twenty (120) feet." The proposed
building is 65 feet in height. It is well in excess of 20
feet off the minimum required 25 foot building set -back
lines (See Sec. 36-280.3.e); therefore the additional 2,0 -
feet of height may be authorized. The Planning commission
needs to authorize the requested building height.
Sec. 36-502(g) specifies the minimum parking requirements
for various occupancies. For business and professional
office uses, for the first 10,000 square feet of floor area,
1 parking space for each 400 square feet of floor area is
required; for 10,001 to 20,000 square feet, 95% of the basic
requirement is specified; for 20,001. to 30,000, 90% is
required; for 30,001 to 40,000, 85% is required; and, for
areas over 40,000 square feet, 80% of the basic requirement
is to be provided. Based on this requirement, a 150,000
square foot office building will require 313 parking spaces.
The developer proposes to provide 450 spaces.
Since the masonry wall at the
contain the building name and
sign, and a detail drawing is
E. ANALYSTS:
entrance to the property is to
address, it is considered a
required.
There are issues remaining to be resolved which are critical
in being able to recommend approval of the site plan. The
issues raised in the review of the preliminary plat must be
addressed: the location of the floodway and floodplain must
be established; the matter of the route of the new east -west
collector street across the dam must be resolved; etc. The
Public works concern that there is insufficient "stacking"
and "weaving" space between'Chenal Parkway and the north -
south private drive entrance to the development needs to be
4
resolved. The phasing plan for the development of the
subdivision, including the establishing of a phasing plan
for the construction of the streets and the re -construction
of the dam need to be specified.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
needed additional information and corrections in the
submittals being addressed.
Staff recommends approval of the 65 foot building height.
IIBDIVI ION COMMITTEE COMMENT :
(JULY 20, 1995)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Staff outlined the proposal to
the Subdivision Committee member present, and discussed with Mr.
White the concerns noted in the discussion outline. David
Scherer, with the Public Works staff, discussed the Public Works
concerns, specifically, the need for locating the floodway and
floodplain on the property, and the need to provide additional
"stacking" and "weaving" space between Chenal Parkway and the
main entrance drive into the office building site. Regarding the
traffic concern, the two alternatives of either moving the north -
south private drive further to the east, or extending the median
to restrict turns from the east -west collector onto the private
drive were discussed. Mr. White indicated that the latter
alternative, extending the median, would be preferable, and said,
that the plan would be changed to accomplish this. The Public
Works concern regarding a private street connecting two public
streets, and serving an area over 5 acres was discussed. It was
determined that, in the case of the subject development, the
private drive to serve the development is appropriate. It was,
however, noted that the private drive must meet City street
standards; it must be 36 feet in width and have sidewalks
constructed along both sides of the street frontages. The
Committee forwarded the item to the full Commission for the
public hearing.
PLANNING COMMISSION ACTION: (AUGUST 8, 1995)
Planning Staff reported that the several issues attendant to this
preliminary plat had been determined for resolution. The Public
Works' staff and Neighborhoods and Planning staff instructed the
Commission that the remaining issues could be worked out at staff
level; therefore, this item should be placed on the Consent
Agenda for approval.
5
The Commission determined it appropriate
Consent Agenda for approval. A motion to
The motion passed by a vote of 7 ayes, 0
C
to place this item on the
that effect was made.
nays and 4 absent.
FILE N0,; Z-601
NAME: ARKANSAS SYSTEMS -- SITE PLAN REVIEW
LOCATION: On the east side of Chenal Parkway, approximately 0.5
mile north of the Kanis Rd. intersection
DEVELOPER:
ARKANSAS SYSTEMS
8901 Kanis Rd.
Little Rock, AR 72205
227-8471
AREA: 12 ACRES NUMBER OF LOTS:
ZONING: O-2
PLANNING DISTRIgT: 19
CENSUS TRACT: 42.06
VARIANCES REQUESTED: None
STATEMENT OF PROPOSAL:
ENGINEER;
Joe White
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
1 FT. NEW STREET: 440
PROPOSED USES: Offices
The applicant proposes the development of the first phase of the
Arkansas Systems corporate campus facility. This first phase is
to be constructed on Lot 2 of the Arkansas Systems Office Park
Subdivision, the preliminary plat of which is being reviewed for'
approval on this agenda. The first phase will entail
construction of a 5 -story, 65 foot tall, 150,000 square foot
office building, and parking for approximately 450 vehicles. The
first phase of a future east -west public collector street is to
be constructed with the development of Lot 2. This street is to
extend eastward from Chenal Parkway, and is to involve,
initially, construction of approximately 440 feet of the street.
The main Entrance drive to the development is to be constructed
northward from this new collector street. With this initial
phase, the main entrance drive is to be an 875 foot long. It is
to be a private street built to public street standards. With
the first phase development, the west shoreline of the existing
5 -acre lake will be "groomed and landscaped", and access to the
water's edge will be provided. A masonry wall, containing the
building name and address, is planned for the northeast corner of
the intersection of the new east -west collector street and the
private entrance drive.
A. PR P SAL RE E T•
Planning Commission review and approval of a site plan is
requested.
FILE Z - U15— (Cont.)
B. EXIi2TING CONDITIO
The property is currently undeveloped. There are dense
woods along the west boundary of the tract, and a pasture
and a 5 -acre lake along the east boundary. The terrain
ranges from gently rolling meadow along the lake to a 15%
grade hillside at the northwest corner of the property.
This hillside, along with a matching hillside to the east,
forms a valley, between witch there is an earthen dam which
backs up water to form the lake.
The existing zoning of the tract is 0-3. The 0-3 zoning
district extends to all abutting tracts in all directions.
C. ENGINEERING/UTILITYCOMMENTS:
The Public Works staff comments that:
1) The unnamed collector street requires a 60 foot right-
of-way and 36 feet of pavement, with sidewalks on both
sides. Chenal Parkway will require sidewalks along the
parkway frontage. The Chenal Parkway intersection at
the unnamed collector must meet City Engineering design
standards.
2) The intersection shown on the submitted plan is located
only 200 feet from the collector's intersection with
Chenal Parkway. This spacing does not meet the
required minimum spacing requirement of 600 feet, as
specified in Sec. 31-285. This street will provide
major access to a multi -office complex, generating
large peak hour volumes and causing the intersection,
as designed, to fail. This intersection should be
moved to the east a minimum of 200 additional feet, and
preferably an additional 400 feet, to provide ample
left turn storage and weaving space to access the
development. Alternatively, the median island might be
extended to restrict left turn movements from the
unnamed collector. The intersection should be within
150 of a 900 intersection. The private street should
be 36 feet in width and have sidewalks on both sides.
The private street should not connect two public
streets, and should be limited to a short loop or be a
cul-de-sac street, where the development served
contains less than 5 acres. See Sec. 31-207.b(2)
3) Stormwater detention will be required for the site.
Open ditches are generally not permitted by the
Stormwater Management and Drainage Manual. If ditches
are planned, they must be shown on the plan and be
2
FILE z-6015 n
approved by the City Engineer prior to Planing
Commission approval of the site plan.
4) The location of the unnamed collector is recommended to
be moved south of the dam. Public liability for the
dam would be required if the dam is part of the public
right-of-way. The dam construction shall be certified
by a geotechnical engineer with experience in dam
construction.
5) A sketch plan identifying the floodplain and floodway
way is required before Planning Commission action.
Base flood elevations are required. Dedication of the
floodway is required. A grading and excavation plan
and permit are required. A development permit is
required. USACE-LRD should be contacted for approval
prior to beginning any work. All drainage structures
for the floodway, including the spillway for the dam,
shall be designed for the 100 year storm.
Little Rock Municipal Water Works comments that a water main
extension and possibly on-site fire protection will be
required. A pro -rata front footage charge of $15.00 per
foot applies along Chenal Parkway, and an acreage charge of
$300 per acre also applies. Annexation to the City will be
required.
Little Rock Wastewater utility comments that a sewer main
extension, with easements, will be required.
Arkansas Power and Light Co. will require 15 foot easements'
along the streets abutting the proposed development site.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. comments that an easement
will be required at the northeast corner of the intersection
of the unnamed arterial and Chenal Parkway in order to
construct a fiber optic equipment hub.
The Fire Department noted that on-site fire hydrants will be
required on the site.
The Neighborhoods and Planning Site Review Specialist
comments that: 1) the areas set aside for buffers and
landscaping exceed ordinance requirements; 2) the dumpster
areas must be screened with a minimum 8 foot high fence or
wall on three sides; and 3) curb and gutter or another
approved border will be required to protect landscaped areas
from vehicular traffic.
3
FILE NQ., z -6 Q15 '(Cont.)
D. ISSUES/LEGAL/TE HNICALID8SIGtH:
Sec. 36-127 requires Planning Commission review of the
proposed site development for, among other zoning districts,
0-2 zoned land. Since the subject site is zoned 0-2, the
site plan review is required.
Sec. 36-130 requires that the parcel size and the building
coverage of the principal building be denoted.
Sec. 36-280(d) states: "No building... shall exceed a height
of forth -five (45) feet at the required front, side, or rear
yard setback lines. Building heights ... in excess of forth -
five (45) feet may be authorized by the Planning Commission
in conjunction with site plan review." "... one.(1) foot (of
height) may be added to the height of the building for each
foot that the building... is set back from the required yard
lines." "...the maximum height of the building (shall not)
exceed one hundred twenty (120) feet." The proposed
building is 65 feet in height. It is well in excess of 20
feet off the minimum required 25 foot building set -back
lines (See Sec. 36-280.3.e); therefore the additional 20
feet of height may be authorized. The Planning Commission
needs to authorize the requested building height.
Sec. 36-502(g) specifies the minimum parking requirements
for various occupancies. For business and professional
office uses, for the first 10,000 square feet of floor area,
1 parking space for each 400 square feet of floor area is
required; for 10,001 to 20,000 square feet, 95% of the basic
requirement is specified; for 20,001 to 30,000, 90% is
required; for 30,001 to 40,000, 85% is required; and, for
areas over 40,000 square feet, 80% of the basic requirement
is to be provided. Based on this requirement, a 150,000
square foot office building will require 313 parking spaces.
The developer proposes to provide 450 spaces.
Since the masonry wall at the
contain the building name and
sign, and a detail drawing is
E. ANALYSIS•
entrance to the property is to
address, it is considered a
required.
There are issues remaining to be resolved which are critical
in being able to recommend approval of the site plan. The
issues raised in the review of the preliminary plat must be
addressed: the location of the floodway and floodplain must
be established; the matter of the route of the new east -west
collector street across the dam must be resolved; etc. The
Public Works concern that there is insufficient "stacking"
and "weaving" space between Chenal Parkway and the north -
south private drive entrance to the development needs to be
4
FILE Z- 3 c n .
resolved. The phasing plan for the development of the
subdivision, including the establishing of a phasing plan
for the construction of the streets and the re -construction
of the dam need to be specified.
F. OTAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
needed additional information and corrections in the
submittals being addressed.
Staff recommends approval of the 65 foot building height.
HDIVI ION COMMITTEECOMMENT:
(JULY 20, 1995)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Staff outlined the proposal to
the Subdivision Committee member present, and discussed with Mr.
White the concerns noted in the discussion outline. David
Scherer, with the Public Works staff, discussed the Public Works
concerns, specifically, the need for locating the floodway and
floodplain on the property, and the need to provide additional
"stacking" and "weaving" space between Chenal Parkway and the
main entrance drive into the office building site. Regarding the
traffic concern, the two alternatives of either moving the north -
south private drive further to the east, or extending the median
to restrict turns from the east -west collector onto the private
drive were discussed. Mr. White indicated that the latter
alternative, extending the median, would be preferable, and said
that the plan would be changed to accomplish this. The Public '
Works concern regarding a private street connecting two public
streets, and serving an area over 5 acres was discussed. It was
determined that, in the case of the subject development, the
private drive to serve the development is appropriate. It was,
however, noted that the private drive must meet City street
standards; it must be 36 feet in width and have sidewalks
constructed along both sides of the street frontages. The
Committee forwarded the item to the full Commission for the
public hearing.
PLANNING COMMIS IDN ACTION: (AUGUST 8, 1995)
Planning Staff reported that the several issues attendant to this
preliminary plat had been determined for resolution. The Public
Works' staff and Neighborhoods and Planning staff instructed the
Commission that the remaining issues could be worked out at staff
level; therefore, this item should be placed on the Consent
Agenda for approval.
5
FILE N Z 6 5 nt.1
The Commission determined it appropriate
Consent Agenda for approval. A motion to
The motion passed by a vote of 7 ayes, 0
6
to place this item on the
that effect was made.
nays and 4 absent.
August 8, 1995
ITEM NO.: 6 FILE Z- 1
NAME: ARKANSAS SYSTEMS -- SITE PLAN REVIEW
L ATI On the east side of Chenal Parkway, approximately 0.5
mile north of the Kanis Rd. intersection
DEVELOPER:
ARKANSAS SYSTEMS
8901 Kanis Rd.
Little Rock, AR 72205
227-8471
AREA: 12 ACRES NUMBER OF LOTS:
ZONING: O-2
PLANNING DISTRICT: 19
CENSUS TRACT: 42.06
VARIANCES REQUESTED: None
STATEMENT OF PR P AL•
ENGTNEER:
Joe White
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
1 FT. NEW STREET: 440
PROPOSED USES: Offices
The applicant proposes the development of the first phase of the
Arkansas Systems corporate campus facility. This first phase is
to be constructed on Lot 2 of the Arkansas Systems Office Park
Subdivision, the preliminary plat of which is being reviewed for
approval on this agenda. The first phase will entail
construction of a 5 -story, 65 foot tall, 150,000 square foot
office building, and parking for approximately 450 vehicles. The
first phase of a future east -west public collector street is to
be constructed with the development of Lot 2. This street is to
extend eastward from Chenal Parkway, and is to involve,
initially, construction of approximately 440 feet of the street.
The main entrance drive to the development is to be constructed
northward from this new collector street. With this initial
phase, the main entrance drive is to be an 875 foot long. It is
to be a private street built to public street standards. With
the first phase development, the west shoreline of the existing
5 -acre lake will be "groomed and landscaped", and access to the
water's edge will be provided. A masonry wall, containing the
building name and address, is planned for the northeast corner of
the intersection of the new east -west collector street and the
private entrance drive.
August 8, 1995
C+ ; rte i I
ITEM N 6(Cont.)_FILE N Z-6015
A. PROPOSAL/REQUEST:
Planning Commission review and approval of a site plan is
requested.
B. EXISTING CONDITIONS:
The property is currently undeveloped. There are dense
woods along the west boundary of the tract, and a pasture
and a 5 -acre lake along the east boundary. The terrain
ranges from gently rolling meadow along the lake to a 15%
grade hillside at the northwest corner of the property.
This hillside, along with a matching hillside to the east,
forms a valley, between witch there is an earthen dam which
backs up water to form the lake.
The existing zoning of the tract is 0-3. The 0-3 zoning
district extends to all abutting tracts in all directions.
C. ENGINEERING/UTILITY COMMENTS:
The Public Works staff comments that:
1) The unnamed collector street requires a 60 foot right-
of-way and 36 feet of pavement, with sidewalks on both
sides. Chenal Parkway will require sidewalks along the
parkway frontage. The Chenal Parkway intersection at
the unnamed collector must meet City Engineering design
standards.
2) The intersection shown on the submitted plan is located
only 200 feet from the collector's intersection with
Chenal Parkway. This spacing does not meet the
required minimum spacing requirement of 600 feet, as
specified in Sec. 31-285. This street will provide
major access to a multi -office complex, generating
large peak hour volumes and causing the intersection,
as designed, to fail. This intersection should be
moved to the east a minimum of 200 additional feet, and
preferably an additional 400 feet, to provide ample
left turn storage and weaving space to access the
development-. Alternatively, the median island might be
extended to restrict left turn movements from the
unnamed collector. The intersection should be within
150 of a 900 intersection. The private street should
be 36 feet in width and have sidewalks on both sides.
The private street should not connect two public
streets, and should be limited to a short loop or be a
cul-de-sac street, where the development served
contains less than 5 acres. See Sec. 31-207.b(2)
2
August 8, 1995
ITEM NO-: ont FILE D.- 17- 1
3) Stormwater detention will be required for the site.
open ditches are generally not permitted by the
Stormwater Management and Drainage Manual. If ditches
- are planned;--- they --must 'be --shown -on -the --plan, and -be
approved by the City Engineer prior to Planing
Commission approval of the site plan.
4) The location of the unnamed collector is recommended to
be moved south of the dam. Public liability for the
dam would be required if the dam is part of the public
right-of-way. The dam construction shall be certified
by a geotechnical engineer with experience in dam
construction.
5) A sketch plan identifying the floodplain and floodway
way is required before Planning Commission action.
Base flood elevations are required. Dedication of the
floodway is required. A grading and excavation plan
and permit are required. A development permit is
required. USACE-LRD should be contacted for approval
prior to beginning any work. All drainage structures
for the floodway, including the spillway for the dam,
shall be designed for the 100 year storm.
Little Rock Municipal Water Works comments that a water main
extension and possibly on-site fire protection will be
required. A pro -rata front footage charge of $15.00 per
foot applies along Chenal Parkway, and an acreage charge of
$300 per acre also applies. Annexation to the City will be
required.
Little Rock Wastewater utility comments that a sewer main
extension, with easements, will be required.
Arkansas Power and Light Co. will require 15 foot easements
along the streets abutting the proposed development site.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. comments that an easement
will be required at the northeast corner of the intersection
of the unnamed arterial and Chenal Parkway in order to
construct a fiber optic equipment hub.
The Fire Department noted that on-site fire hydrants will be
required on the site.
The Neighborhoods and Planning Site Review Specialist
comments that: 1) the areas set aside for buffers and
3
August 8, 1995
a 11
ITEM Na.- 6 n FILE D.: -- 015
landscaping exceed ordinance requirements; 2) the dumpster
areas must be screened with a minimum 8 foot high fence or
wall on three sides; and 3) curb and gutter or another
approved border will be required to protect landscaped areas
from vehicular -traffic. - -"
D. ISS ES LEGAL TE HNICAL DE IGN:
Sec. 36-127 requires Planning Commission review of the
proposed site development for, among other zoning districts,
0-2 zoned land. Since the subject site is zoned 0-2, the
site plan review is required.
Sec. 36-130 requires that the parcel size and the building
coverage of the principal building be denoted.
Sec. 36-280(d) states: "No building... shall exceed a height
of forth -five (45) feet at the required front, side, or rear
yard setback lines. Building heights ... in excess of forth -
five (45) feet may be authorized by the Planning Commission
in conjunction with site plan review." "...one (1) foot (of
height) may be added to the height of the building for each
foot that the building... is set back from the required yard
lines." "...the maximum height of the building (shall not)
exceed one hundred twenty (120) feet." The proposed
building is 65 feet in height. It is well in excess of 20
feet off the minimum required 25 foot building set -back
lines (See Sec. 36-280.3.e); therefore the additional 20
feet of height may be authorized. The Planning Commission
needs to authorize the requested building height.
Sec. 36-502(g) specifies the minimum parking requirements
for various occupancies. For business and professional
office uses, for the first 10,000 square feet of floor area,
1 parking space for each 400 square feet of floor area is
required; for 10,001 to 20,000 square feet, 95% of the basic
requirement is specified; for 20,001 to 30,000, 90% is
required; for 30,001 to 40,000, 85% is required; and, for
areas over 40,000 square feet, 80% of the basic requirement
is to be provided. Based on this requirement, a 150,000
square foot office building will require 313 parking spaces.
The developer proposes to provide 450 spaces.
Since the masonry wall at the entrance to the property is to
contain the building name and address, it is considered a
sign, and a detail drawing is required.
E. ANALYSIS•
There are issues remaining to be resolved which are critical
in being able to recommend approval of the site plan. The
4
August 8, 1995
SUBDIVISI�T[
ITEM(Cont,FILE Z -C n1
issues raised in the review of the preliminary plat must be
addressed: the location of the floodway and floodplain must
be established; the matter of the route of the new east -west
collector street across the dam must be resolved; etc. The
Public -Works concern that -there is -insufficient "stacking"
and "weaving" space between .Chenal Parkway and the north -
south private drive entrance to the development needs to be
resolved. The phasing plan for the development of the
subdivision, including the establishing of a phasing plan
for the construction of the streets and the re --construction
of the dam need to be specified.
F. STAFF' RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
needed additional information and corrections in the
submittals being addressed.
Staff recommends approval of the 65 foot building height.
SUBDIVISION COMMITTEE COMMENT:
(JULY 20, 1995)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Staff outlined the proposal to
the Subdivision Committee member present, and discussed with Mr.
White the concerns noted in the discussion outline. David
Scherer, with the Public Works staff, discussed the Public Works
concerns, specifically, the need for locating the floodway and
floodplain on the property, and the need to provide additional
"stacking" and "weaving" space between Chenal Parkway and the
main entrance drive into the office building site. Regarding the
traffic concern, the two alternatives of either moving the north -
south private drive further to the east, or extending the median
to restrict turns from the east -west collector onto the private
drive were discussed. Mr. White indicated that the latter
alternative, extending the median, would be preferable, and said
that the plan would be changed to accomplish this. The Public
Works concern regarding a private street connecting two public
streets, and serving an area over 5 acres was discussed. It was
determined that, in the case of the subject development, the
private drive to serve the development is appropriate. it was,
however, noted that the private drive must meet City street
standards; it must be 36 feet in width and have sidewalks
constructed along both sides of the street frontages. The
Committee forwarded the item to the full Commission for the
public hearing.
5
August 8, 1995
ITEM NO • n FILE NO.: ry- Z
PLAI+TNTNG COMMISSIQN ACT
(AUGUST 8, 1995)
Planning Staff reported that the several issues attendant to this
preliminary plat had been determined for resolution. The Public
Works' staff and Neighborhoods and Planning staff instructed the
Commission that the remaining issues could be worked out at staff
level; therefore, this item should be placed on the Consent
Agenda for approval.
The Commission determined it appropriate
Consent Agenda for approval. A motion t
The motion passed by a vote of 7 ayes, 0
6
to place this item on the
o that effect was made.
nays and 4 absent.