Loading...
HomeMy WebLinkAboutZ-5983 Staff AnalysisMay 16, 1995 ITEM NO.: 16 FILE NO.: Z- 983 NAME: LOCATION• OWNER/APPLICANT: PR P AL: ORDINANCE DESIGN STANDARDS: 1, SiLatiQn: Zion Wheel Missionary Baptist Church - Conditional Use Permit 4411 East 38th Street Zion Wheel Missionary Baptist Church; Edward Alexander, Pastor A conditional use permit is requested to allow for the expansion of this existing, R-2 zoned church. The proposed two story expansion will consist of two offices, two classrooms and an enlarged fellowship room._ The church site is located on the south side of East 38th Street, one block east of Jones Street; in the College Station Community. 2e Com ati)ilit with Nei hborhood: Zion Wheel is a small church which has been located in this predominately single family neighborhood for many years. The surrounding neighborhood is comprised primarily of small single family homes ranging from older single -wide mobile homes in a state of disrepair to moderately sized brick homes. The City limits line is at Jones Street, one block west of the site. The large area of vacant R-2 zoned property to the north of this site is currently under consideration for rezoning to I-2 to accommodate the American Freightways expansion. The proposed expansion of this small church should not affect its continued compatibility with the neighborhood. 3. Dn-Site Drives and Parking: No expansion of the sanctuary seating capacity is proposed through this application. As such, no increase in on-site parking is required. The church is currently using the Mount Nebo Street right-of-way as a parking lot.. The right- of-way should be closed or a franchise obtained for use of the public right-of-way. May 16, 1995 SUBDIVZSIC)iI ITEM N 16 [Cont.] FILE NO.: Z -598a 4. Screening and B ffers: An upgrade in landscaping equal to the 25% building expansion is required. 5. City Engineer's Comments: a. Dedicate ROW per Master Street Plan. Construct improvements on 38th Street per Master Street Plan or apply to the City Engineer for a hardship In -Lieu contribution of 15% of the construction costs or seek a waiver or deferral from the Board of Directors. b. Close ROW on Mount Nebo or obtain a franchise for pavement on ROW. C. Provide Stormwater Detention Analysis for addition. The addition appears to be in excess of 500 square feet. If the expansion is over impervious surfaces and the increase in impervious surfaces is less than 500 square feet, state this in a letter to David L. Scherer, Public Works and seek a waiver of stormwater analysis by staff as allowed by ordinance. 6. Utility CommQnts: Little Rock Wastewater utility reports a sewer main extension is required with easements. 7. Staff Analysis: Zion Wheel Missionary Baptist Church, a small church located in the College Station Community, is requesting a conditional use permit to allow for the construction of a two-story addition containing a kitchen and dining area, office space and two classrooms. No expansion of the sanctuary's seating capacity is proposed. The church property is surrounding on three sides by vacant, heavily wooded property. Two single family homes are adjacent to the south of the church site. The building addition is approximately 50 feet -from the south property line and should have no effect on these adjacent homes. As is true of much of the College Station area, the streets abutting this site have never been developed or are in an extremely substandard state. 38th Street is comprised of a 40 foot right-of-way containing a 15 foot wide chip seal street. Mount Nebo Street has never been developed. The church has paved over the area of the Mount Nebo right-of- way and is using the public right-of-way as a parking lot. The conditional use permit process compels compliance with May 16, 1995 SpBDIVISIO ITEM N 16 n FILE NO.: Z-5983 the City's Master Street Plan including right-of-way dedication and street_improvements. These issues, outlined in the City Engineer's Comments, must be resolved prior to issuance of a building permit for the church expansion. Staff is supportive of the request and feels that the expansion of this church building'will not have a negative effect on the adjoining neighborhood.; 8. Staff Recommendation: Staff recommends approval of this;application subject to compliance with the following conditions: a. Compliance with the City Engineer's Comments b. Compliance with the Utility Comments C. Compliance with the City's Landscape and Buffer Ordinances including the required 25% upgrade in landscaping SUBDIVISION COMMITTEE_COMMENT: (APRIL 27, 1995) The applicant was not present. Staff presented the item and noted the City Engineer, Utility and Landscape Comments outlined above. David Scherer, of the City Engineer's Staff, expounded upon the various comments made by his office concerning the adjacent streets. The Committee determined that there were no outstanding issues and forwarded the item to the full Commission., PLANNING COMMISSION ACTION: (MAY 16, 1995) The applicant was present. There were no objectors present. Staff presented the item and informed the Commission that there were no outstanding issues. The item was placed on the Consent Agenda and approved subject to the conditions as outlined in the staff recommendation. The vote was 11 ayes, 0 noes and 0 absent. 3