HomeMy WebLinkAboutZ-5936-C Staff AnalysisOctober 7, 2004
ITEM NO.: 12 FILE NO.: Z -5936-C
NAME: Tract 5 Chenal Valley — The Promenade at Chenal — Site Plan Review
LOCATION: Located on the Southwest corner of Rahling Road and Chenal Parkway
DEVELOPER:
Red Development Company
4717 Central
Kansas City, MO 64112
ENGINEER:
White Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 47.88 acres NUMBER OF LOTS: 4 FT. NEW STREET: 3200 LF
CURRENT ZONING: C-2, Shopping Center District
PLANNING DISTRICT: 19 — Chenal Planning District
CENSUS TRACT: 42.11
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST APPLICANT'S STATEMENT):
The Promenade at Chenal, a 531,981 square foot open-air, life-style center, is
proposed to be located in Chenal Valley. The shopping center will be home to a
variety of upscale national, regional and local retailers, restaurants and
entertainment venues. The development is proposed to be anchored by a
155,000 square foot Dillard's department store, the center will be designed in a
Gothic style. The open-air design of the center replicates a nostalgic Main Street
Shopping district. Vehicular access to the Main Street allows convenient parking
in front of the store or restaurant. Extensive sidewalks, landscaping and
hardscape will create a pedestrian -friendly environment ideal for shopping,
entertainment and socializing.
October 7, 2004
SUBDIVISION
ITEM NO.: 12 Cont. FILE NO.: Z -5935-C
The French Gothic design style will showcase buildings and steeply pitched slate
roof treatments punctuated by vertical elements such as masonry piers, tall
windows and decorative tower elements. Stone and brick square pillars will
anchor the entrance features and the corners of the buildings. The materials
used will be warm and earthly such as brick stone, precise stone, simulated
stucco and simulated slate roofs. With its refreshing openness and strong,
vertical lines, the shopping center reflects the heavily timbered landscape of the
Chenal Valley area.
B. EXISTING CONDITIONS:
The site is a vacant wooded site on the west side of Chenal Parkway. Chenal
Parkway has been constructed as a four lane median roadway with curb and
gutter but without sidewalks adjacent to the proposed development. LaGrange
Drive has been constructed with curb and gutter adjacent to the southern
boundary of the property but also dose not have a sidewalk in place. Rahling
Road has not been constructed adjacent to the site but is proposed as a part of
the development. There are commercial and office uses located in the area
southeast and south of the site. To the north of the site is currently vacant and
zoned PCD.
C. NEIGHBORHOOD COMMENTS:
As of this writing staff has received several informational phone calls from area
residents. The Bayonne Place Property Owners Association, the Margeaux
Place Property Owners Association, the Duquesne Place Property Owners
Association, the Aberdeen Court Property Owners Association, the Parkway
Place Property Owners Association, the St. Charles Community Association and
all owners of property located within 200 -feet of the site were notified of the
public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Existing and proposed right-of-way widths are adequate to meet current
Master Street Plan Requirements. Sidewalk improvements are shown as
required.
2. Rahling Road is classified as a principal arterial, however, construction is
shown to a minor arterial standard, which corresponds to Phase 1 standard
for a principal arterial. A third lane each direction will ultimately be required.
3. Repair or replace any existing curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
2
October 7, 2004 .
SUBDIVISION
ITEM NO.: 12 (Cont.
FILE NO.: Z -5936-C
4. Plans for all work in the right-of-way shall be submitted for approval prior to
the start of work. Obtain barricade permit prior to doing any work in the right-
of-way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
5. A grading permit in accordance with Section 29-186(c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted an approved prior to the
start of construction.
6. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property and the location of all storm water facilities. Show the
proposed final contours and critical cross sections of maximum cut and fill.
7. Street improvement plans shall be include signage and striping. Traffic
engineering must approve complete plans prior to construction.
8. Prepare a letter of pending development addressing street lights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpot) for additional information regarding street light
requirements.
9. A traffic study for the site is currently under review, and comments will be
provided under separate cover.
Traffic Comments:
1. Left turn lane into main entrance on west bound Chenal Parkway needs to
increase to 250 feet.
2. A 200 foot right turn lane needs to be added at both shopping center
entrances on east bound Chenal Parkway.
3. Shopping center entrances on La Grande Drive and Rahling Road need to be
increased to 36 feet.
4. A 200 foot right turn lane needs to be added at both shopping center
entrances along north bound Rahling Road.
5. Rahling Road needs 2 through lanes, 2 left turn lanes, and one right turn lane
at the intersection of Chenal Parkway.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional details.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
3
October 7, 2004
SUBDIVISION
ITEM NO.: 12 (Cont.
FILE NO.: Z -5936-C
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This fee will apply to all meter connections including any
metered connections off the private fire system. A water main extension and on-
site fire protection will be required in order to provide service to this property.
Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department
to obtain information regarding the required placement of the hydrant(s) and
contact Central Arkansas Water regarding procedures for installation of the
hydrant(s). This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection. Contact Central Arkansas Water at 992-2438 for
additional information.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: Current there is no bus service in the area. If the City elects to extend
bus service to this area, the cost would be approximately $200,000 annually for
full day and evening service. To accommodate future transit service to the
Promenade at Chenal Valley, CATA recommends that as part of the project a
bus pullout bay be added to allow the bus to pull out of traffic while loading,
enhancing both safety and traffic flow. The preferred location would connect
pedestrians directly to the shopping plaza via a sidewalk, minimizing the need to
walk through the parking lot. A bus pullout, however, could be constructed at
virtually any location along the streets surrounding the proposed shopping plaza.
The pathway from the bus stop to the main entrance should be developed with
ADA and pedestrian safety in mind. Please contact CATA at (501) 375-6717 for
additional information.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: No comment.
Landscape: The proposed street buffer width around the perimeter of the site is
less than the full width requirement of 50 feet, but with one exception, meets
ordinance requirements when averaged out. The one exception being the
proposed street buffer average width proposed along Rahling Road, which is
3,232 square feet short of the requirement.
Additional interior landscape islands are required to help soften the impact of
large areas of proposed asphalt. Interior landscape islands should be generally
evenly distributed throughout the on-site paved areas.
4
October 7, 2004
SUBDIVISION
TEM NO.: 12
FILE NO.: Z -5936-C
An irrigation system to water landscaped areas will be required.
Prior to obtaining a building permit, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect.
The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Extra credit toward fulfilling Landscape Ordinance
requirements can be given when properly preserving trees of 6 -inch caliper or
larger. A minimum of 75% of the dripline of trees to be preserved must be
protected with temporary fencing.
G. SUBDIVISION COMMITTEE COMMENT- (September 16, 2004)
Mr. Joe White was present representing the request. Staff presented an
overview of the proposed development indicating the request was a site plan
review to allow the placement of a commercial shopping center on the site. Staff
requested the applicant provide additional information concerning the proposed
development. Staff requested the applicant provide a detailed signage plan, the
proposed building coverage and the total floor area in the general notes section
of the site plan. Staff also requested the applicant provide a bus stop for CATA
to access the site. Staff noted CATA had submitted a more detailed request and
the applicant should contact them directly for additional information.
Public Works comments were addressed. Staff stated the proposed site plan
indicated the development of boundary street improvements and the placement
of additional traffic signals on the site. Staff stated clearing and grading permits
would be required for the site and approved prior to construction. Staff
questioned if the development would be constructed in phases. The applicant
stated the development would be constructed in a single phase.
Landscaping comments were addressed. Staff noted the indicated landscaping
around the perimeter of the site was less than the full width requirement of fifty
feet, but with one exception, the indicated buffer met ordinance requirements
when average out. Staff stated the one exception was the proposed street buffer
average width along Rahling Road was 3,232 square feet short of the
requirement. Staff also stated interior landscaping islands were required to help
soften the impact of large pave areas. Staff stated the interior landscape islands
should be evenly distributed through the site.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
5
October 7, 2004
SUBDIVISION
ITEM NO.: 12 (Cont.) FILE NO.: Z -5936-C
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the September 16, 2004, Subdivision Committee meeting. The
applicant has provided a detailed signage plan, maximum building height, total
floor area and total building coverage. The applicant has indicated four 50 -foot
tower elements and three 60 -foot tower elements. The Zoning Ordinance allow
steeples, chimneys or similar ornamental structure to be constructed provided
the structure does not exceed twice the height permitted in the classification.
The site is zoned C-2, Shopping Center District with allows a maximum building
height of 45 -feet. The indicated structures are within the allowable height for
C-2, Shopping Center District zoning.
The applicant has indicated all mechanical equipment will be roof mounted and
screened from view by parapet walls. The applicant has also indicated the low
architectural walls will be faced with stone or brick and conform to the general
architectural theme of the center.
The applicant has addressed landscaping comments by increasing the street
buffer along Rahling Road to meet the minimum ordinance requirement. The
applicant has also included landscape islands within the development to soften
the impact of the on site paved area. The applicant has not included the
placement of pedestrian tables to allow for safe pedestrian movement within the
development. Staff would recommend pedestrian tables be added to the site to
allow safe movement and connectivity throughout the site.
The proposed site plan includes the placement of 3079 parking spaces. There
are 2379 surface parking spaces and 700 deck parking spaces. Based on the
total retail square footage of the site 2364 parking spaces would typically be
required.' The indicated parking is more than adequate to meet the minimum
parking demand.
The applicant has indicated signage will comply with the Chenal Parkway Design
Overlay District and signage allowed in commercial zones per the Zoning
Ordinance. The Chenal/Financial Center Design Overlay District allows a single
sign not to exceed one hundred square feet in area and eight feet in height. In
cases where a parcel fronts on two streets one sign per different street may be
erected. The signs are to be monument type signs. The applicant has indicated
fagade signage, over -door transom signage and blade signage (required). The
total sign area and lettering height is based on the tenant space leased by the
retailer but less than typically allowed per the zoning ordinance for signs in
commercial zones.
D
October 7, 2004
SUBDIVISION
ITEM NO.: 12 (Cont.) FILE NO.:_Z-5936-C
The applicant has indicated the maximum building coverage of 429,353 square
feet or twenty-one percent of the total site area.
The applicant has indicated a bus pull -off located along LaGrande Drive. The
applicant has indicated pedestrian access will be provided per CATA's request
and comply fully with ADA requirements.
The applicant has indicated additional lanes per Traffic Comments. The
applicant has increased the length of the left turn lane into the main entrance on
the east and west bound traffic lanes. The applicant has also indicated turn
lanes along Rahling Road as requested by staff.
The applicant is requesting approval of the creation of a five lot plat with cross
access easements in conjunction with the site plan review. The applicant has
indicated the lots range in size from 1.17 acres to 36.29 acres. Property zoned
C-2, Shopping Center District typically requires a minimum lot size of five acres,
except in those instances where a subdivision site plan and plat proposing
peripheral lots and multiple ownership is approved by the Commission. The
ordinance further states there shall be not less than three hundred feet of district
frontage on at least one abutting street, whether for single or multiple building/lot
development. Proposed Lots 1 — 3 do not appear to meet the minimum lot
frontage criteria established for the zoning district. The lots appear to be 260 -
feet plus. Staff does not feel the reduced lot frontage will have any adverse
impact on adjoining properties. Although the lots are located on a public street,
the indicated lots do not have direct access to the roadway through a curb -cut.
Staff feels the serving of these lots by internal drives will lessen any potential
negative impact on the adjacent roadway. Staff is supportive of the reduced lot
frontage.
Staff is supportive of the proposed site plan and proposed preliminary plat. Staff
feels the applicant has met most of the minimum requirements with regard to a
zoning site plan review for the proposed site with regard to landscaping, access
and circulation, signage, maximum building height and parking. To Staff's
knowledge there are no outstanding issues associated with the proposed
request. Staff feels the proposed development should have minimal impact on
adjoining properties.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the staff report.
Staff recommends approval of the requested variance to allow the development
of lots with less than the required 300 -foot minimum street frontage.
Staff recommends additional pedestrian tables be added to the site to allow safe
pedestrian connectivity through the site.
7
October 7, 2004,
s
SUBDIVISION
ITEM NO.: 12 (Cont.
PLANNING COMMISSION ACTION:
FILE NO.: Z -5936-C
(OCTOBER 7, 2004)
Mr. Tim Daters was present representing the request. There were registered objectors
present. Staff stated the development was a site plan review request and the applicant
had meet the minimum ordinance standards for the review process.
Mr. Daters stated he was requesting to amend his application and place an additional
condition of approval. He stated when the areas of transition between the cuts and fills
were determined the developer would survey and locate all the trees in these areas.
Mr. Daters stated they would then take all necessary steps to save the identified trees.
He stated the developer would also incorporate hardwood species in their replanting of
landscaped areas.
Ms. Dottie Funk addressed the Commission with concerns. She stated the current
ordinance did not require the preservation of trees on site. She stated she appreciated
the developer commitment to not "mow down" all the trees on the site if possible. She
stated the ordinances were adopted six years ago with a lot of work between citizens,
staff and the Commission. She stated it was possibly time to review the ordinances to
see if there were areas that needed refining.
There was no further discussion of the item. The chair entertained a motion to approve
the request as amended. The motion carried by a vote of 8 ayes, 0 noes and 3 absent.