ITEM 7 FILE NO.: Z-5887-A
NAME: EMBASSY SUITES -- AMENDED LONG -FORM PLANNED
DEVELOPMENT -COMMERCIAL
LOCATION: On the south side of Financial Center Parkway,
approximately 0.4 mile west of Shackleford Rd.
DEVELOPER•
ENGINEER:
Joe white
JOHN Q. HAMMONS WHITE-DATERS & ASSOCIATES, INC.
300 Hammons Parkway, Suite 900 401 S. Victory St.
Springfield, MO 65806 Little Rock, AR 72201
(417) 864-4300 374-1666
AREA: 6.38 ACRES NUMBER ❑F LOTS: 1 FT. NEW STREET: 586
ZONING: PD-C & R-2
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
BACKGROUND•
PROPOSED USES:
None
Hotel & Convention
Center; Restaurant
On October 18, 1994, the Planning Commission conducted a public
hearing on a request to establish the Embassy Suites Short -Form
PD-C on a 4.07 acre tract of land. By Ordinance No. 16,842,
passed on February 7, 1995, the Board of Directors approved the
PD-C, subject to the developer dedicating additional right-of-way
for Financial Center Parkway. Construction of the new west
boundary collector street was included in the approved PD.
STATEMENT OF PROPOSAL:
The applicant proposes to amend the previously approved planned
development to add a 2.31 acre tract to the site. This
additional tact is located at the southeast quadrant of the
previously approved site, and will be used for surface parking.
The approved PD anticipated providing parking for 298 vehicles in
a two -level, below -grade, parking facility which would extend
beneath the hotel tower and convention center buildings, plus
providing 128 surface -level parking spaces, for a total of 426
spaces. The revised PD proposes to eliminate the below -grade
parking facility beneath the hotel tower, and to provide 128
September 19, 1995.
SQBDIVISI�
ITEM NO.: 7 Cont. FILE N 7-5$ 7-A
spaces below --grade beneath the convention center, plus a total of
301 surface spaces, or a total of 429 parking spaces. The
amended PD also reorients the building from its front/north-
facing entrance and porte cochere to a west -facing entrance.
A. PRpPGSALIREQUET:
Planning Commission review and Board of Directors approval
of a an amended PD-C is requested.
B. EXISTING CONT]ITI:
The site is undeveloped and wooded and overgrown. The
topography slopes fairly evenly from a high point at a knoll
just southwest of the northeast corner of the tract the
south, southeast, and southwest. The knoll is at an
elevation of approximately 494 feet MSL; the southwest
corner of the tract is at approximately 445 feet MSL; the
southeast corner of the tract is at approximately 428 feet
MSL.
The site is currently zoned PD and
collector street to the west is the
on a C-3 zoned tract. To the south
To the East is 0-3 zoned land.
UTILI
C. ENGINEERING TY COMMENTS:
R-2. Across the new
Pinnacle Point Hospital
is a large R-2 tract.
Public Works comments the revised plan does not appear to
conflict with the original site plan as far as the interface
with the new 36 foot collector street and Chenal Parkway are
concerned. Traffic Engineering has approved the parking lot
layout.
Water Works comments that a front footage fee of $12.00 per
foot (E.5618,1989) applies; and that this fee is in addition
to normal connection fees. A main extension will be
required to tie into an existing 8" main approximately 100
feet east of this property on the south side of Financial
Center Parkway.
Wastewater comments that a capacity analysis will be
required prior to Wastewater Utility approval. If capacity
is not available, the developer will be required to upgrade
the existing system to handle any extra flow generated.
Capacity contribution fees and Farm Bureau Fees will be
assessed for this project.
Arkansas Power and Light Co. did not respond.
Arkansas Louisiana Gas Co. did not respond.
2
September 19, 1995
sgrenivl--0-14
ITEM O.: 7(Cont.)FILE O.; Z- 7-A
Southwestern Bell Telephone Co. did not respond.
The Fire Department comments that some minor changes need to
be made in the fire hydrant spacing. The pumper hydrant
located on the northeast corner in conjunction with where
the fire service water line enters the building is O.R. The
500' spacing should begin from that hydrant on around the
building with 500' or less spacing on the other 2 hydrants.
There are enough hydrants to meet Code; they simply need to
be relocated slightly.
The Neighborhoods and Planning Site Plan Review Specialist
commented that the areas set aside for buffers and
landscaping meet ordinance requirements.
D. Z ES LEGAL TECHNICAL DE IGN:
The previous approval approved the same uses with a total of
426 parking spaces. This was approved with the assurance of
the developer that this was sufficient parking. The amended
application, though, has supplied the needed parking
analysis. This analysis shows that, to meet the City's
parking ordinance requirements, for all the various uses to
be going on simultaneously, 601 spaces are required. The
analysis shows, however, that, based on the time of day, and
when, during the day the various uses will be taking place,
the 429 spaces provided with this application will be
sufficient.
All agreements associated with the originally approved PD
have been reaffirmed; e.g., that the additional right-of-way
for Financial Center Parkway is being dedicated, and that
the full width of the west boundary collector street will be
constructed as part of this project.
E. ANALYSIS:
The Planning staff comments that the site is located in the
I-430 Planning District. The adopted Land Use Plan
recommends "Mixed Office CommOrcial" uses. The use is
consistent with the adopted Plan.
The developer has furnished a parking analysis which
justifies to their satisfaction the adequacy of the number
of parking spaces provided. The Planning Commission may
either concur with this conclusion, or may require more (or
fewer) spaces.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the amended PD-C.
3
September 19, 1995,
5VBDIVISz9N
ITEM NO.: 7 nt. FILE NO-: Z- 87-A
BDIVI I MMITTEECOMMENT: (AUGUST 31, 1995)
Mr. Joe White, with White-Daters & Associates, was present.
Staff explained that an amended planned development was being
sought in order to add a 4 acre tract to the previously approved
PD in order to accommodate needed surface parking for the hotel
and convention center. Staff explained that, initially, the
developer had anticipated extending the below -grade parking deck
not only under the convention center, but under the hotel area as
well, but that this was not going to be possible; that structural
requirements of the 9-story hotel would preclude having workable
maneuvering and parking areas under the hotelp.consequently, the
lost below -grade parking would have to be made.up for in surface
parking. Mr. White reported that his, as well as the developer's
staff, were in consultation with Bill Henry, the Traffic
Engineer, and that all concerns of Traffic Engineering would be
addressed. Staff reported that, other than Mr. White and the
developer getting finished drawings in to staff, there were no
major issues to be resolved. The Committee forwarded the planned
development to the full Commission for the public hearing.
PLANNING COMMISSION ACTION:
Staff reported that the developer and
communication with Public Works, and
resolved. Staff recommended approval
item was approved with the vote of 8
0 abstentions, and 1 open position.
(SEPTEMBER 19, 1995)
his engineer had been in
that all issues had been
of the amended PD, and the
ayes, 0 nays, 2 absent,
4
FILE NO.: Z-5887-A
NAME: EMBASSY SUITES -- AMENDED LONG -FORM PLANNED
DEVELOPMENT -COMMERCIAL
LOCATION: On the south side of Financial Center Parkway,
approximately 0.4 mile west of Shackleford Rd.
DEVELOPER:
ENGINEER:
Joe White
JOHN Q. HAMMONS WHITE-DATERS & ASSOCIATES, INC.
300 Hammons Parkway, Suite 900 401 S. Victory St.
Springfield, MO 65806 Little Rock, AR 72201
(417) 864-4300 374-1666
AREA: 6.38 ACRES NUMBER OF LOTS: I FT. NEW STREET: 586
ZONING: PD-C & R-2
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
PROPOSED USES:
None
Hotel & Convention
Center; Restaurant
BACKGROUND:
On October 18, 1994, the Planning Commission conducted a public
hearing on a request to establish the Embassy Suites Short -Form
PD-C on a 4.07 acre tract of land. By Ordinance No. 16,842,
passed on February 7, 1995, the Board of Directors approved the
PD-C, subject to the developer dedicating additional right-of-way
for Financial Center Parkway. Construction of the new west
boundary collector street was included in the approved PD.
STATEMENT OF PROPOSAL:
The applicant proposes to amend the previously approved planned
development to add a 2.31 acre tract to the site. This
additional tact is located at the southeast quadrant of the
previously approved site, and will be used for surface parking.
The approved PD anticipated providing parking for 298 vehicles in
a two -level, below -grade, parking facility which would extend
beneath the hotel tower and convention center buildings, plus
providing 128 surface -level parking spaces, for a total of 426
spaces. The revised PD proposes to eliminate the below -grade
parking facility beneath the hotel tower, and to provide 128
spaces below -grade beneath the convention center, plus a total of
301 surface spaces, or a total of 429 parking spaces. The
FILE N . Z-5887-A C n
amended PD also reorients the building from its front/north-
facing entrance and porte cochere to a west -facing entrance.
A. PROPOSAL LaB UE T:
Planning Commission review and Board of Directors approval
of a an amended PD-C is requested.
B. EXISTING CONDITIONS:
The site is undeveloped and wooded and overgrown. The
topography slopes fairly evenly from a high point at a knoll
just southwest of the northeast corner of the tract the
south, southeast, and southwest. The knoll is at an
elevation of approximately 494 feet MSL; the southwest
corner of the tract is at approximately 445 feet MSL; the
southeast corner of the tract is at approximately 428 feet
MSL.
The site is currently zoned PD and
collector street to the west is th
on a C-3 zoned tract. To the south
To the East is 0-3 zoned land.
C. E INEERING ❑TILITY COMMENTS:
R-2. Across the new
e Pinnacle Point Hospital
is a large R-2 tract.
Public Works comments the revised plan does not appear to
conflict with the original site plan as far as the interface
with the new 36 foot collector street and Chenal Parkway are
concerned. Traffic Engineering has approved the parking lot
layout.
Water Works comments that a front footage fee of $12.00 per
foot (E.5618,1989) applies; and that this fee is in addition
to normal connection fees. A main extension will be
required to tie into an existing 8" main approximately 100
feet east of this property on the south side of Financial
Center Parkway.
Wastewater comments that a capacity analysis will be
required prior to Wastewater Utility approval. If capacity
is not available, the developer will be required to upgrade
the existing system to handle any extra flow generated.
Capacity contribution fees and Farm Bureau Fees will be
assessed for this project.
Arkansas Power and Light Co. did not respond.
Arkansas Louisiana Gas Co. did not respond.
Southwestern Bell Telephone Co. did not respond.
The Fire Department comments that some minor changes need to
be made in the fire hydrant spacing. The pumper hydrant
K
FILE NO.: Z- 887-A (Cont
located on the northeast corner in conjunction with where
the fire service water line enters the building is O.R. The
500' spacing should begin from that hydrant on around the
building with 500' or less spacing on the other 2 hydrants.
There are enough hydrants to meet Code; they simply need to
be relocated slightly.
The Neighborhoods and Planning Site Plan Review Specialist
commented that the areas set aside for buffers and
landscaping meet ordinance requirements.
D . ISSUES/LEGALITECHNICAL/DESiGHI :
The previous approval approved the same uses with a total of
426 parking spaces. This was approved with the assurance of
the developer that this was sufficient parking. The amended
application, though, has supplied the needed parking
analysis. This analysis shows that, to meet the City's
parking ordinance requirements, for all the various uses to
be going on simultaneously, 601 spaces are required. The
analysis shows, however, that, based on the time of day, and
when, during the day the various uses will be taking place,
the 429 spaces provided with this application will be
sufficient.
All agreements associated with the originally approved PD
have been reaffirmed; e.g., that the additional right-of-way
for Financial Center Parkway is being dedicated, and that
the full width of the west boundary collector street will be
constructed as part of this project.
E. ANALYSIS•
The Planning staff comments that the site is located in the
I-430 Planning District. The adopted Land Use Plan
recommends "Mixed Office COMMOrcial" uses. The use is
consistent with the adopted Plan.
The developer has furnished a parking analysis which
justifies to their satisfaction the adequacy of the number
of parking spaces provided. The Planning Commission may
either concur with this conclusion, or may require more (or
fewer) spaces.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the amended PD-C.
SUBDIVISION COMMITTEE COMMENT:
Mr. Joe white, with White-Daters
Staff explained that an amended
sought in order to add a 4 acre
(AUGUST 31, 1995)
& Associates, was present.
planned development was being
tract to the previously approved
3
FILE N Z- 87-A(Cont.)
PD in order to accommodate needed surface parking for the hotel
and convention center. Staff explained that, initially, the
developer had anticipated extending the below -grade parking deck
not only under the Convention center, but under the hotel area as
well, but that this was not going to be possible; that structural
requirements of the 9-story hotel would preclude having workable
maneuvering and parking areas under the hotel; consequently, the
lost below -grade parking would have to be made up for in surface
parking. Mr. White reported that his, as well as the developer's
staff, were in consultation with Bill Henry, the Traffic
Engineer. and that all concerns of Traffic Engineering would be
addressed. Staff reported that, other than Mr. White and the
developer getting finished drawings in to staff, there were no
major issues to be resolved. The Committee forwarded the planned
development to the full commission for the public hearing.
pLANNING COMMISSION ACTION: (SEPTEMBER 19, 1995)
Staff reported that the developer and his engineer had been in
communication with Public Works, and that all issues had been
resolved. Staff recommended approval of the amended PD, and the
item was approved with the vote of 8 ayes, 0 nays, 2 absent,
0 abstentions, and 1 open position.