HomeMy WebLinkAboutZ-5887 Staff AnalysisOctober 18, 1994
ITEM FILE N Z- 887
DAME: EMBASSY SUITES -- SHORT -FORM PLANNED COMMERCIAL
DEVELOPMENT DISTRICT
LOCATION: On the south side of Financial Center Parkway,
approximately 0.4 mile west of Shackleford Rd.
REVEL PER
ENGINEER•
JOHN Q. HAMMONS JOE WHITE
JOHN Q. HAMMONS HOTELS WHITE-DATERS & ASSOCIATES, INC.
300 Hammons Parkway, Suite 900 401 S. victory St.
Springfield, MO 65806 Little Rock, AR 72201
(417) 864-4300 374-1666
AREA: 4.13 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 584
ZONING: R-2 PROPOSED USES: Hotel and Convention Center
PLANNING DI TRTQT: 11
CENSUS TRACT: 24.04
VARIANCES REQUESTED: None,
STATEMENT QF PR P AL:
The applicant proposes the development of an Embassy Suites hotel
and convention center facility.- The hotel portion -of the
development is proposed to be 9 stories, containing approximately
250 suites and an atrium with approximately 10,000 square feet of
meeting space.` The convention facility is to be on a single
level and is to contain approximately 12,000 square feet of
meeting space. Below the hotel and convention center is a 2-
level parking garage. Because of the topography of the site,
both levels of -the garage and the hotel and convention center
will have street -level access. In the two levels of the garage,
there is to be space for parking approximately 300 vehicles.
Surface parking will add another 128 spaces. The site is a 4.13
acre (179,902 square foot) tract; the building area is 56,862
square feet (31.5% of the site); the paved area is 74,688 square
feet (41.5% of the site); and, the landscaped area is 48,352
square feet (27% of the site). An existing street right-of-way
which lies along the west property line is proposed to be
developed, and access to the facility will be taken from this
street. No access from Financial Center Parkway is proposed. A
single monument sign is indicated along the Financial Center
Parkway frontage of the site.
October 18, 1994
,gUBDIVISIO
ITEM NO.: 8 (Cyntinutesi) FILE NO.: Z-5$57
A. PRQPQSALZRRF3T:
Planning Commission review and Board of Directors approval
is requested for a PCD for the development of a 4.13 tract
for an Embassy Suites hotel and convention center. The
hotel is proposed to have approximately 250 two -unit suites,
to be 9 stories in height, and to have an atrium which will
provide approximately 10,000 square feet of meeting space.
The convention center is proposed to be a single level at
the rear of the hotel, and is to have approximately 12,000
square feet of meeting space. Below the hotel and
convention center is to be a 2-level parking garage for 300
vehicles. Because of the topography of the site, slopping
downward to the south, the hotel, the convention center, and
both levels of the parking garage will have street level
access. An unimproved and substandard street right-of-way
along the west boundary of the site is to be developed and
used for access to the property. This will involve
dedication of additional right-of-way and construction of
the street. A single monument -type sign is to be located
along the Financial Center Parkway frontage. No variances
are requested.
B. EXISTING O ITI
The site currently contains a single residence along the
Financial Center Parkway frontage and another residence at
the rear of the property. The site is partially wooded.
The topography drops from a high point at the northeast
corner of the site, at Financial Center Parkway, of
approximately 480 feet Mean Sea Level to an elevation of
approximately 445 at the southwest corner of the site, a
difference of 35-feet. There is a 30 foot wide dedicated -
street right-of-way along the west boundary of the site..._
The site is currently zoned R-2. To the south and southeast
is the remainder of the R-2 area. To the east is an 0-3
zoned tract; -to the west is a C-3 zoned tract and is the
location of the -Pinnacle Point Hospital. Across Financial
Center Parkway, to the north, is an 0-3 zoned tract; to the
northwest is the recently rezoned PCD for Chenal village; to
the northeast is the recently rezoned PCD for the Hampton
Inn hotel and a C-3 zoned lot.
C. ENGINEERING/UTILITY COMMENTS:
Public Works comments that, prior to the issuance of a
building permit, a complete grading and drainage plan and a
stormwater detention plan must be submitted. The proposed
street along the west property line must be constructed to
collector/commercial street standards. The street name for
this boundary street, shown as "Rector", must be approved by
Public Works.
�a
October 18, 1994
BDIVT T
ITEM n in FILE Z- 7
Little Rock Water Works comments that a pro-rata front
footage fee of $12 per foot applies, and that this charge is
in addition to the normal connection charges. A water main
extension will be required to tie into an existing 8" main
approximately--1-0-0 feet east of this- property, on the south
side of Financial Center Parkway. On -site fire protection
will be required.
Little Rock Wastewater Utility comments that a capacity
analysis will be required. If capacity is available, a
capacity contribution fee and Farm Bureau fee will be
assessed. If capacity is available, a sewer main extension,
with easements, will be required.
Arkansas Power and Light Co. will require easements along
the east, west, north, and south property lines.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require easements.
The Little Rock Fire Department commented that the number of
fire hydrants must be increased; the number shown is
inadequate. The entrance driveway radius must be opened up
for better access by fire equipment. The Fire Department
would prefer to have more than the one entrance to the
property off the west roadway. I .
Landscape review comments that a 6 foot high opaque wood
fence, with its structural supports facing inward, or dense
evergreen scrubbery, will be required along the entire south
property line and -along the east property line where it, --
abuts residential property. A 29 foot wide street buffer is
required along Financial Center Parkway. A 29 foot wide land
use buffer is required along the south property line. The
ground sign must be a monument -type sign, with a maximum
height of 8 feet and a maximum area of 100 square feet.
D. I E LB AI, TE HNICAL DE I
Section 31-201(h) of the Subdivision Regulations states
that: "Whenever a proposed subdivision abuts a partially
dedicated or constructed public street, the developer shall
provide the minimum of one-half of the required improvements
and right-of-way. Dedication of additional ---right-of-way
and cons*tiviction of at 'least' one-half street improvements
will be required along the west boundary of the site.
Because of the volume of traffic using this street for the
only access to the facility, full width street improvements
need to be provided.
October 18, 1994
y +N
ITEM NO, 8 (Continued) — FILE bM, : Z-5887
Lighting of the building and the site is not dealt with in
the project narrative. This aspect of the development needs
to be a subject of discussion at the Planning Commission.
The project narrative does not indicate whether the facility
will also include a restaurant. This must be classified.
The Subdivision Regulations require the following
information, omitted from the submission, to be furnished
with a PCD application: a preliminary plat with all
required information relative to filing of a preliminary
plat, including showing the zoning classifications within
the plated area and of abutting areas, execution of
preliminary certification of engineering accuracy, and a
preliminary Bill of Assurance.
The Planning staff reports that the proposed PCD is in the
I-430 District, and the adopted Land Use Plan calls for this
area to be developed as office uses. The hotel/convention
center use, then, is in conflict with the exiting Plan, and
the Planning staff does not encourage further disregard of
the Plan. Alternatively, staff needs to re -study the area
in view of amending the Land Use Plan for the area.
Chenal Parkway, which was originally foreseen to eventually
be developed as a 6-lane parkway, is currently developed as
4 lanes. With the rezonings to commercial -uses along the
Financial -Center Parkway-Chenal-Parkway-corridor which have
occurred over the past year and a half, staff has concerns
about the capacity of the existing parkway -to handle the -
traffic to be generated. The rezoning within the past year
and a half for the Wal-Mart and Sams site, the Home -
Quarters PCD, the Best Buy PCD, the Chenal Village PCD,--
Chenal Center, the Hampton Inn PCD, Sonic Drive-in, etc. are
all heavy traffic generators. The Embassy Suites hotel and
convention center would add significantly to the traffic
congestion, and the parkway may not be able to safely handle
the capacity. A traffic study needs to be performed prior
to -adding another traffic generator of the magnitude of the
Embassy Suites facility.
E. ANALYSIS•
The proposed development is an extremely large-scale
development for a 4-acre t site. The street landscape and
land .use -buffers- are below -minimum; --the -use- is -not in
conformance with the adopted Land Use Plan; and, the
contribution of the facility to a developing traffic problem
are concerns. Wastewater Utility is not at all certain that
there is capacity for such a facility, and will require a
capacity analysis be performed.
4
October 18, 1994
SUBDIVISION
ITEM NO.: 8 (Continued) FILE NO.: Z- 887
F. TAFF RECOMMENDATIONS:
Staff recommends that the hearing of this issue be deferred
until the November 29, 1994 Commission meeting to allow
staff to consider the Land Use Plan issue and traffic
issues, and for the sewer capacity analysis to be
accomplished.
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 29, 1994)
Mr. Joe White, with White-Daters & Associates, Inc., the
engineering firm for the project, was present.
Staff outlined the proposed development, and the Subdivision
Committee members reviewed with Mr. White the concerns contained
in the discussion outline. There were concerns, for instance,
about the deficiency of the landscaping and the single driveway
off the west boundary street. The need for a topographic cross-
section was brought up. The deficiencies in the submittals were
noted. The various comments from the utilities and from Public
Works were discussed. Mr. White assured the Committee members
that he would address the questions and deficiencies noted, and
the Committee forwarded the item to the Commission for the public
hearing.
PLANNING COMMISSION ACTION: :(OCTOBER 18, 1994)
Staff pointed out that the staff recommendation, as written in
the agenda, is for a deferral of the request in order for the
City to complete a traffic study which is due to be'completed by
the end of'the year; for the City Planning staff to prepare an
updated land use study of the area; and, for the applicant to
address the issue on the availability of sewer. Staff reported,
however, that the applicant has told staff that a deferral would
delay the approval process too long, and that they want to
proceed with the hearing.
Mr. Joe White, with White-Daters & Associates, Inc., outlined the
scope of the proposed development, and responded to the staff
concerns: he reported that Wastewater Utility had indicated that
they would not withhold sewer service to the hotel, although
there may be a capacity charge imposed; and, that it is his
understanding that the Board of Directors had not been waiting on
the completion of the traffic study to make decisions on re -
zonings along the Financial Center Parkway-Chenal Parkway
corridor. Mr. White reported that he had one amendment to the
plan to propose: that the land use buffer along the south and
5
October 18, 1994
SUBDIVISIO,N
ITEM NO.: 8 Continued FILE NO.: Z-5887
the south portion of the east property line be reduced to the
standard landscape buffer width which would be imposed along
property lines of similarly zoned property, instead of the buffer
that is being imposed because the surrounding property is still
zoned residential. He said that he had a letter from the
abutting property owner of the affected property, and that the
owner agreed with the proposal.
Mr. John Hammons, the owner -developer, indicated that he had been
seeking a site to develop a hotel in Little Rock for some time,
and liked this site. He outlined the use which was proposed,
the hotel and convention center, saying that the hotel will
contain 250 suites, and the banquet area will seat 750 persons.
He described the scope of his business operations in hotel
developments around the country, saying that he has the financing
to built the hotels which he is proposing. He said that the
hotel would be "first class", and that he has been successful in
developing these types of facilities in the smaller markets.
Mr. Steve Menton, identifying himself as an architect for the
John Q. Hammons Co., outlined some of the characteristics of the
site and the means taken to address the site conditions. He said
that the site has a great deal of slope to it, but that, with the
parking deck beneath the hotel -convention center, not only were
the parking needs addressed, but the building works with the site
instead of against it.
Mr. Doyle Daniel, of the Birchwood neighborhood, said that he was
not sure that he was totally in opposition to the proposed
development, but that he would suggest that the item be deferred,
as recommended by staff. He said that access to Financial Center
Parkway from the proposed hotel -convention center would be almost
impossible, and he suggested that the developer extend the west
boundary street westward to Autumn Rd. in order to take advantage
of the future traffic signal at the Autumn Rd. -Financial Center
Parkway-Chenal Parkway intersection.
Ms. Ruth Bell, of the League of Women Voters of Pulaski Co.,
spoke in opposition to the proposed development. She said that
the development was one more commercial addition to the "hugely"
overburdened commercial corridor along Financial Center Parkway-
Chenal Parkway. The roadways do not have the carrying capacity
for the commercial development which is emerging, she said, and
it has been inappropriate, she added, to have rezoned so much of
the property for commercial uses. She also said that she was
opposed to reducing the land use buffer, as Mr. White had
requested.
Mr. Ron Newman, of the Planning staff, indicated that a land use
study needs to be made of the entire Financial Center Parkway-
Chenal Parkway corridor, from Shackleford Rd. to Ranis; that the
6
October 18■ 1994
SUBDIVISIQ
ITEM NO.: 8 (Continued) FILE NO.: Z-5887
Land use Plan amendments which have been made over the past
several years have been "piece -meal", and a comprehensive study
needs to be undertaken.
Mr. Jeff Sharp, Board of Directors member, saying that he was
speaking as a private citizen, spoke in support of the proposed
development. He said that the proposed development would add
substantially to the economy of the City, and would not compete
with the downtown convention facilities. He reported that the
Board of Directors had not placed a moratorium on development
while the traffic study was being conducted; that the Board knows
that, eventually, something is going to have to be done about the
carrying capacity of the Parkway, but that it is unfair to
developers to defer their projects while the City solves this
problem.
Commissioner Walker asked Bob Brown, with the Planning staff, to
explain the land use and landscaping buffer requirements along
the south and east property lines abutting the residentially
zoned property.
Mr. Brown indicated that the same buffer requirements would be
imposed, as were indicated, for the perimeter of the site if the
abutting properties were zoned commercial or residential; that
the buffer widths are based on the depth of the site. He
reported that the plan melts the landscaping requirements on the
front property line and for internal and building landscaping,
and that a version of the plan had been submitted which meets the
rear and side landscaping requirements.
Commissioner -Walker then brought out that, if the site were zoned
C-3, there would be a maximum height allowed of 35 feet; and,
that if the site were zoned for office uses, then the maximum
height, with enough separation, would be 60 feet._ He said that,
with the hotel being proposed to be 9 stories, plus the 2 level
garage, the hotel will be significantly higher than would be
allowed in either the office or commercial zoning districts. He
said that the proposed development is extremely dense for the
site. He also suggested that the developer pay the costs of
adding a future lane along Financial Center Parkway, if the
traffic study which is to be produced indicates that such a lane
is needed.
Mr. White responded that the requested variance from the buffer
requirement would be withdrawn, and the developer would comply
with the standard buffer requirements.
Mr. Bob Brown, responding to Commissioner Walker's inquiry
regarding the development's compliance with the bulk and area
requirements of the zoning ordinance, stated that, with the
7
October 18, 1994
�SUBDIVI.SIQN
ITEM NO.: 8 (Continued) FILE NO.: Z-5887
request withdrawn for the buffer variance, the site meets the
zoning ordinance requirement for bulk and area.
Commissioner Walker pointed out that, with the parking beneath
the building, there was justification for permitting greater lot
coverage for the building. He said that he wanted to give the
developer credit for placing the parking under the building, in
lieu of having to provide an expansive parking lot.
Commissioner Oleson asked for a description of the signage.
Mr. Hammons responded that the monument sign would comply with
the overlay requirements, and that there would be back -lighted
signs on"the building: one would say "Embassy Suites" and one
would be a single "E".
A motion was made and seconded to approve the PCD request, with
the requirements that: 1) the developer participate in the
provision of a traffic signal at the intersection of what is
shown as Rector St. on the plan and Financial Center Parkway, if
required by the City's traffic engineer; and 2) that the
developer pay the cost of providing an additional lane along the
Financial Center Parkway frontage of the site if the traffic
study indicates that this lane is required and if the City
undertakes a contract to build the additional lane along
Financial Center Parkway-Chenal Parkway. The motion passed with
the vote of 9 ayes, 1 nays, 1 absent, and 0 abstentions.
8
FILE NO.: -Z-5F87
NAME: EMBASSY SUITES -- SHORT -FORM PLANNED COMMERCIAL
DEVELOPMENT DISTRICT
LOCATION: On the south side of Financial Center Parkway,
approximately 0.4 mile west of Shackleford Rd.
DEVELOPER:
ENGINEER•
JOHN Q. HAMMONS JOE WHITE
JOHN Q. HAMMONS HOTELS WHITE-DATERS & ASSOCIATES, INC.
300 Hammons Parkway, Suite 900 401 S. Victory St.
Springfield, MO 65806 Little Rock, AR 72201
(417) 864-4300 374-1666
AREA: 4.13 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 584
ZONING: R-2 PROPOSED USES: Hotel and Convention Center
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARIANCES_REQUESTED: None
TATEMENT OF PROPOSAL:
The applicant proposes the development of an Embassy Suites hotel
and convention center facility. The hotel portion of the
development is proposed to be 9 stories, containing approximately
250 suites and an atrium with approximately 10,000 square feet of
meeting space. The convention facility is to be on a single
level and is to contain approximately 12,000 square feet of
meeting space. Below the hotel and convention center is a 2-
level parking garage. Because of the topography of the site,
both levels of the garage and -the hotel and convention center
will have street -level access. In the two levels of the garage,
there is to be space for parking approximately 300 vehicles.
Surface parking will add another 128 spaces. The site is a 4.13
acre (179,902 square foot) tract; the building area is 56,862
square feet (31.5% of the site); the paved area is 74,688 square
feet (41.5% of the site); and, the landscaped area is 48,352
square feet (27% of the site). An existing street right-of-way
which lies along the west property line is proposed to be
developed, and access to the facility will be taken from this
street. No access from Financial Center Parkway is proposed. A
single monument sign is indicated along the Financial Center
Parkway frontage of the site.
A. PROPO AL RE VEST:
Planning Commission review and Board of Directors approval
is requested for a PCD for the development of a 4.13 tract
for an Embassy Suites hotel and convention center. The
FILE NO.: Z-5887 (-Continued)
hotel is proposed to have approximately 250 two -unit suites,
to be 9 stories in height, and to have an atrium which will
provide approximately 10,000 square feet of meeting space.
The convention center is proposed to be a single level at
the rear of the hotel, and is to have approximately 12,000
square feet of meeting space. Below the hotel and
convention center is to be a 2-level parking garage for 300
vehicles. Because of the topography of the site, slopping
downward to the south, the hotel, the convention center, and
both levels of the parking garage will have street level
access. An unimproved and substandard street right-of-way
along the west boundary of the site is to be developed and
used for access to the property. This will involve
dedication of additional right-of-way and construction of
the street. A single monument -type sign is to be located
along the Financial Center Parkway frontage. No variances
are requested.
B. EXISTING CONDITION :
The site currently contains a single residence along the
Financial Center Parkway frontage and another residence at
the rear of the property. The site is partially wooded.
The topography drops from a high point at the northeast
corner of the site, at Financial Center Parkway, of
approximately 480 feet Mean Sea Level to an elevation of
approximately 445 at the southwest corner of the site, a
difference of 35 feet. There is a 30 foot wide dedicated
street right-of-way along the west boundary of the site.
The site is currently zoned R-2. To the south and southeast
is the remainder of the R-2 area. To the east is an 0-3
zoned tract; to the west is a C-3 zoned tract and is the
location of the Pinnacle Point Hospital. Across Financial
Center Parkway, to the north, is an 0-3 zoned tract; to the
northwest is the recently rezoned PCD for Chenal _Village; to
the northeast is the recently rezoned PCD for the Hampton
Inn hotel and a C-3 zoned lot.
C. ENGINEER I TILITYCOMMENTS:
Public Works comments that, prior to the issuance of a
building permit, a complete grading and drainage plan and a
stormwater detention plan must be submitted. The proposed
street along the west property line must be constructed to
collector/commercial street standards. The street name for
this boundary street, shown as "Rector", must be approved by
Public Works.
Little Rock Water Works comments that a pro-rata front
footage fee of $12 per foot applies, and that this charge is
in addition to the normal connection charges. A water main
extension will be required to tie into an existing 8" main
0)
FILE NO.: Z-5887 (ntinVed)
approximately 100 feet east of this property, on the south
side of Financial Center Parkway. On -site fire protection
will be required.
Little Rock Wastewater Utility comments that a capacity
analysis will be required. If capacity is available, a
capacity contribution fee and Farm Bureau fee will be
assessed. If capacity is available, a sewer main extension,
with easements, will be required.
Arkansas Power and Light Co. will require easements along
the east, west, north, and south property lines.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require easements.
The Little Rock Fire Department commented that the number of
fire hydrants must be increased; the number shown is
inadequate. The entrance driveway radius must be opened up
for better access by fire equipment. The Fire Department
would prefer to have more than the one entrance to -the
property off the west roadway.
Landscape review comments that a-6 foot high opaque wood
fence, with its structural supports facing inward, or dense
evergreen scrubbery,,will be required along the entire south
property line and along the east property line where it
abuts residential property. A 29 foot wide street buffer is
required along Financial Center Parkway. -A 29-foot wide land
use buffer is required along the south property line. The
ground sign must be a monument -type sign, with a maximum
height of 8 feet and a maximum area of 100 square -feet.
D. ISSgESILEGALITECHNICALIDESICN:
Section 31-201(h) of the Subdivision Regulations -states -
that: "Whenever a proposed subdivision abuts a partially
dedicated or constructed public street, --the developer -shall
provide the minimum of one-half of the required improvements
and right-of-way." Dedication of additional right-of-way
and construction of at least one-half street improvements
will be required along the west boundary of the site.
Because of the volume of traffic using this street for -the
only access to the facility, full width street improvements
need to be provided.
Lighting of the building and
the project narrative. This
to be a subject of discussion
the site is not dealt with in
aspect of the development needs
at the Planning Commission.
3
FILE NO.: Z-5887 (Continued
The project narrative does not indicate whether the facility
will also include a restaurant. This must be classified.
The Subdivision Regulations require the following
information, omitted from the submission, to be furnished
with a PCD application: a preliminary plat with all
required information relative to filing of a preliminary
plat, including showing the zoning classifications within
the plated area and of abutting areas, execution of
preliminary certification of engineering accuracy, and a
preliminary Bill of Assurance.
The Planning staff reports that the proposed PCD is in the
I-430 District, and the adopted Land Use Plan calls for this
area to be developed as office uses. The hotel/convention
center use, then, is in conflict with the exiting Plan, and
the Planning staff does not encourage further disregard of
the Plan. Alternatively, staff needs to re -study the area
in view of amending the Land Use Plan for the area.
Chenal Parkway, which was originally foreseen to eventually
be developed as a 6-lane parkway, is currently developed as
4 lanes. With the rezonings to commercial uses along the
Financial Center Parkway-Chenal Parkway corridor which have
occurred over the past year and a half, staff has concerns
about the capacity of the existing parkway to handle the
traffic to be generated. The rezoning within the past year
and a half for the Wal-Mart and Sam's site, the Home
Quarters PCD, the Best Buy PCD, the Chenal Village PCD, _
Chenal Center, the Hampton Inn PCD, Sonic Drive-in, etc. are
all heavy traffic generators. The Embassy Suites hotel and
convention center would add significantly to the traffic
congestion, and the parkway may not be able to safely handle
the capacity. A traffic study needs to be performed prior
to adding another traffic generator of the magnitude of the
Embassy Suites facility.
E. ANALYSIS•
The proposed development is an extremely large-scale
development for a 4-acre ± site. The street landscape and
land use buffers are below minimum; the use is not in
conformance with the adopted Land Use Plan; and, the
contribution of the facility to a developing traffic problem
are concerns. Wastewater Utility is not at all certain that
there is capacity for such a facility, and will require a
capacity analysis be performed.
F . STAFF RECOMMENDATIONS:
Staff recommends that the hearing of this issue be deferred
until the November 29, 1994 Commission meeting to allow
staff to consider the Land Use Plan issue and traffic
4
FILE NO.: Z-5887 Continued
issues, and for the sewer capacity analysis to be
accomplished.
SUBDIVISIQN COMMITTEE CDMMENT:
(SEPTEMBER 29, 1994)
Mr. Joe White, with White-Daters & Associates, Inc., the
engineering firm for the project, was present.
Staff outlined the proposed development, and the Subdivision
Committee members reviewed with Mr. White the concerns contained
in the discussion outline. There were concerns, for instance,
about the deficiency of the landscaping and the single driveway
off the west boundary street. The need for a topographic cross-
section was brought up. The deficiencies in the submittals were
noted. The various comments from the utilities and from Public
Works were discussed. Mr. White assured the Committee members
that he would address the questions and deficiencies noted, and
the Committee forwarded the item to the Commission for the public
hearing.
PLANNING COMMISSION ACTION:
(OCTOBER 18, 1994)
Staff pointed out that the staff recommendation, as written in
the agenda, is for a deferral of the request in order for the
City to complete a traffic study which is due to be completed by
the end of the year; for'the City Planning staff to prepare an
updated land use study of the area; and, for the applicant to
address the issue on the availability of sewer. Staff reported,
however, that the applicant has told staff that a deferral would
delay the approval process too long, and that they want to
proceed with the hearing.
Mr. Joe White, with White-Daters & Associates, Inc., -outlined the
scope of the proposed development, and responded to the staff
concerns: he reported that Wastewater utility had indicated that
they would not withhold sewer service to the hotel, although
there may be a capacity charge imposed; and, that it is his
understanding that the Board of Directors had not been waiting on
the completion of the traffic study -to make decisions= on -re -
zonings along the Financial Center Parkway-Chenal Parkway
corridor. Mr. White reported that he had one amendment to the
plan to propose: that the land use buffer along the south and
the south portion of the east property line be reduced to the
standard landscape buffer width which would-be imposed along
property lines of similarly zoned property, instead of the buffer
that is being imposed because the surrounding property is still
zoned residential. He said that he had a letter from the
abutting property owner of the affected property, and that the
owner agreed with the proposal.
Mr. John Hammons, the owner -developer, indicate
seeking a site to develop a hotel in Little Roc
and liked this site. He outlined the use which
d that he had been
k for some time,
was proposed,
5
FILE NO.: Z-5887 ___Continued
the hotel and convention center, saying that the hotel will
contain 250 suites, and the banquet area will seat 750 persons.
He described the scope of his business operations in hotel
developments around the country, saying that he has the financing
to built the hotels which he is proposing. He said that the
hotel would be "first class", and that he has been successful in
developing these types of facilities in the smaller markets.
Mr. Steve Menton, identifying himself as an architect for the
John Q. Hammons Co., outlined some of the characteristics of the
site and the means taken to address the site conditions. He said
that the site has a great deal of slope to it, but that, with the
parking deck beneath the hotel -convention center, not only were
the parking needs addressed, but the building works with the site
instead of against it.
Mr. Doyle Daniel, of the Birchwood neighborhood, said that he was
not sure that he was totally in opposition to the proposed
development, but that he would suggest that the item be deferred,
as recommended by staff. He said that access to Financial Center
Parkway from the proposed hotel -convention center would be almost
impossible, and he suggested that the developer extend the west
boundary street westward to Autumn Rd. in order to take advantage
of the future traffic signal at the Autumn Rd. -Financial Center
Parkway-Chenal Parkway intersection.
Ms. Ruth Bell, of the League of Women Voters of Pulaski Co.,
spoke in opposition to the proposed development. She said that
the development was one more commercial addition to the "hugely"
overburdened commercial corridor along Financial Center Parkway-
Chenal Parkway. The roadways do not have the carrying capacity
for the commercial development which is emerging, she said, and
it has been inappropriate, she added, to have rezoned so much of
the property for commercial uses. She also said that she was
opposed to reducing the land use buffer, as Mr. White had
requested. _
Mr. Ron Newman, of the -Planning staff, indicated that -a land use
study needs to be made of the entire Financial Center Parkway-
Chenal Parkway corridor; from Shackleford-Rd.- to- Kanis;--that`-the
Land Use Plan amendments which have been made over the past
several years have been "piece -meal", and a comprehensive study
needs to be undertaken.
Mr. Jeff Sharp, Board of -Directors member; saying that he was
speaking as a private citizen, spoke in support of the proposed
development. He said that the proposed development would add
substantially to the economy of the City, and would not compete
with the downtown convention facilities. He -reported- that -the
Board of Directors had not placed a moratorium on development
while the traffic study was being conducted; that the Board knows
that, eventually, something is going to have to be done about the
6
FILE NO_: z-5887 Continued
carrying capacity of the Parkway, but that it is unfair to
developers to defer their projects while the City solves this
problem.
Commissioner Walker asked Bob Brown, with the Planning staff, to
explain the land use and landscaping buffer requirements along
the south and east property lines abutting the residentially
zoned property.
Mr. Brown indicated that the same buffer requirements would be
imposed, as were indicated, for the perimeter of the site if the
abutting properties were zoned commercial or residential; that
the buffer widths are based on the depth of the site. He
reported that the plan meets the landscaping requirements on the
front property line and for internal and building landscaping,
and that a version of the plan had been submitted which meets the
rear and side landscaping requirements.
Commissioner Walker then brought out that, if the site were zoned
C-3, there would be a maximum height allowed of 35 feet; and,
that if the site were zoned for office uses, then the maximum
height, with enough separation, would be 60 feet. He said that,
with the hotel being proposed to be 9 stories, plus the 2 level
garage, the hotel will be significantly higher than would be
allowed in either the office or commercial zoning districts. He
said that the proposed development is extremely dense for the
site. He also suggested that the developer pay the costs of
adding a future lane along Financial Center Parkway, if the
traffic study which is to be produced indicates that such a lane
is needed.
Mr. White responded that the requested variance from the buffer
requirement would-be withdrawn, and the developer would comply
with the standard buffer requirements.
Mr. Bob Brown, responding to Commissioner Walker's inquiry
regarding the development's compliance with the bulk and area
requirements of the zoning ordinance, - stated that, with--the-
request withdrawn for the buffer variance, the site meets the
zoning ordinance -requirement for bulk and area: -
Commissioner Walker pointed out that, with the parking beneath
the building, there was justification for permitting greater lot
coverage for the building. He said that he wanted to give the
developer credit for placing the parking..under the building, -in
lieu of having to provide an expansive parking lot. -
Commissioner Oleson asked for a description of the signage.
Mr. Hammons responded that the monument - sign would .comply with
the overlay requirements, and that there would be back -lighted
signs on the building: one would say "Embassy Suites" and one
would be a single "E"..
7
FILE NO.: Z-5887 Contixiued
A motion was made and seconded to approve the PCD request, with
the requirements that: 1) the developer participate in the
provision of a traffic signal at: the intersection of what is
shown as Rector St. on the plan and Financial Center Parkway, if
required by the City's traffic engineer; and 2) that the
developer pay the cost of providing an additional lane along the
Financial Center Parkway frontage of the site if the traffic
study indicates that this lane is required and if the City
undertakes a contract to build the additional lane along
Financial Center Parkway-Chenal Parkway. The motion passed with
the vote of 9 ayes, 1 nays, 1 absent, and 0 abstentions.
8
ITEM:
LOCATION:
REQUEST:
SOURCE:
TAFF REPOR
Amend the City Land Use Plan -
I-430 District
South of Chenal Parkway, west
of Hermitage
office to Mixed office
Commercial
Planning Commission
The Planning Commission after hearing a request to rezone
property, recommends a higher use than the plan recommends.
While staff questions the need for additional commercialization
and has serious concerns about traffic impacts, in order to
approve the Planning Commissions actions amendment to the Plan is
necessary.
The staff would suggest a Mixed Office Commercial use for the
site if the Board wishes to approve the Commission's
recommendation.
STAFF RECQMMEjP-.&T QN :
Deferral ' -
1. Meeting -Date: January 17, 1995
2. Case No_: Z-5887
3. Rom: Establish EMBASSY SUITES -- SHORT -FORM PD-C
4. Location: On the south side of Financial Center
Parkway, approximately 0.4 mile west of Shackleford Rd.
5. Owner/Applicant: John Q. Hammons
6. Existing status: There are 2 existing residences
located on the property, but the majority of the site
is undeveloped and wooded. The existing zoning is R-2.
7. Proposed Use: Hotel and Convention Center
8. Staff Recommendation: Deferral
9. Planning Commission Recommendation: Approval
10. Conditions or Issues Remaining to be Resolved:
Amendment of the Land Use Plan
11. Right -of -Way Issues: None. The applicant will
dedicate the required right-of-way and make the street
improvements along the west boundary of the site.
12. Recommendation Forwarded With: A vote of 9 ayes, 1 nay,
1 absent, and 0 abstentions
13. Objectors: Ruth Bell, League of Women Voters of
Pulaski County; and Doyle Daniel
14. Neighborhood Contact _Person/others: Georgiana Henry,
Birchwood Neighborhood Association
15. Neighborhood Plan: I-430 (11)