HomeMy WebLinkAboutZ-5817-E Staff AnalysisFILE NO.: Z -5817-E
NAME: Magnolia Terrace Addition Short -form POD
LOCATION: Located at 15104 Cantrell Road
DEVELOPER:
Battery Outfitters
HWY 86
Golden, MO 65658
ENGINEER:
William Dean, PE
209 Roya Lane
Bryant, AR 72022
AREA: 4.06 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE:
NUMBER OF LOTS: 4
R-2, Single-family
Single-family residential
-•s
FT. NEVA STREET: 0 LF
0-3, General Office District and Battery Outfitters
VARIAN CES1WAIVERS REQUESTED: None requested.
BACKGROUND:
Ordinance No. 16,690 adopted by the Little Rock Board of Directors on June 7, 1994,
established South Hills Terrace Addition Short -form POD, for a portion of this site
containing 1.27 acres. Ordinance No. 16,691 allowed for a deferral of the required
sidewalk, the required detention and the front yard landscaping for three years or to
within sixty days of completion of the sewer main which was proposed for constructed
along the Highway 10 frontage of the property. The proposal included (Phase 1) the
utilization of an existing residential structure located at the rear of the site as an office
use for a civil engineering company and (Phase II) was to consist of the construction of
a second office building (5,080 square feet) at the front of the property. The Phase I
FILE NO.: Z -5817-E Cont.
proposal included the remodeling of the existing structure and the utilization of the
existing 12 -foot driveway. The Phase II portion included the abandonment of the
existing driveway, closure of the existing curb cut, and construction of a new driveway
and curb cut. The new curb cut was to be 24 -feet. A new septic system was proposed
on the site with connection to city sewer when service became available. The applicant
indicated upon availability of sewer service Phase II would be initiated.
Ordinance No. 18,211 adopted by the Little Rock Board of Directors on February 15,
2000, established the Childress Short -form POD on property adjacent to the east
containing 1.5 acres. The site contained a 9,400 square foot, two-story brick building
which was previously used as a non -conforming photography studio. The applicant
proposed the rezoning to allow redevelopment of the site with building and parking lot
additions. The applicant proposed 0-1, Quiet Office District uses as allowable uses for
the site. The applicant proposed a two phased development for the property: Phase I
included the construction of an asphalt drive extending from Cantrell Road, construction
of 24 parking spaces on the south side of the existing building, dumpster location, use
of the exiting building for 0-1 permitted uses. Phase II was to consist of the
construction of an 8,000 square foot addition to the existing building, extend the
driveway along the east side of the building, construction of 32 additional parking
spaces on the north side of the building, relocation of the dumpster area. The applicant
noted a single sign would be placed near the entrance to the property, which would
conform to the Highway 10 Design Overlay Standards.
An application was filed for Lots 2 and 3 of the Boydston Subdivision to rezone the
property from R-2, Single-family to C-3, General Commercial District. The area is
located west of the South Hills Terrace Addition POD. The request was withdrawn prior
to the legal ad being placed for the June 11, 1985, Planning Commission Public
Hearing.
Ordinance No. 18,564 adopted by the Little Rock Board of Directors on September 18,
2001, rezoned Lots 1, 2 and 3 of the Boydston Subdivision from R-2, Single-family to
POD. The Board of Directors revoked the POD zoning approval on April 20, 2004, by
the adoption of Ordinance No. 19,085 restoring the previously held R-2, Single-family
zoning classification. The property contained 1.29 acres.
Ordinance No. 19,506 adopted by the Little Rock Board of Directors on March 21, 2006,
rezoned the two previously approved POD's and expanded the area to property located
to the west of the POD zoned property (the expanded area was zoned
R-2, Single-family) to POD to allow the development of four buildings containing three
lots. 0-3, General Office District uses were approved as allowable uses for the site.
The approval did allow the placement of ten percent of the total gross floor area as an
accessory use as identified in the 0-3, General Office Zoning District. The lots ranged
in size from 1.18 acres to 1.53 acres. The construction of a single story building was
proposed for Lots1 and 2 and Lot 3 was proposed with two buildings, a single -story
building and a two level building utilizing the slope of the site. The building located on
Lot 1 contained 9,000 square feet. The building on Lot 2 contained 12,600 square feet
K
FILE NO.: Z -5817-E Cont.
and the building on Lot 3 contained a 3;000 square foot building and a 12,000 square
foot building. The overall development plan was in compliance with the Highway 10
Design Overlay District with the exception of the rear yard setback, which was approved
with a 25 -foot setback (40 -feet typically required per the DOD). The dumpster service
hours were limited to 7 am to 7 pm.
On May 19, 2011, the Little Rock Planning Commission denied a request to allow the
site to develop with four (4) lots containing a mixed use development of office and retail
uses. The buildings were proposed containing 3,000 square feet to 19,000 square feet.
The uses included the uses within the 0-3, General Office Zoning District including the
ten percent allowable accessory uses for Lots 1 and 3B and C-1, Neighborhood
Commercial Zoning District for Lot 3A. The request included setback and landscaping
less than the typical standard set forth in the Highway 10 Design Overlay District. This
recommendation was appealed to the Little Rock Board of Directors but was withdrawn
prior to the Board acting on the request.
Ordinance No. 20,453 adopted by the Little Rock Board of Directors on August 16,
2011, repealed the previously approved POD's for these properties restoring the zoning
to R-2, Single-family.
A. PROPOSAL/REQUESTIAPPLICANT'S STATEMENT:
The applicant is now proposing to rezone the property from R-2, Single-family to
POD to allow the development of four (4) lots, one (1) containing Battery
Outfitters and the remaining three (3) lots with office buildings utilizing 0-3,
General Office District without the ten percent allowed accessory uses. This plan
differs from the plan denied by the Planning Commission on May 19, 2011, by
the dedication of right of way for a public street and staged construction of
290 linear feet of collector roadway and deletion of the previously proposed C-1,
Neighborhood Commercial District uses for Lot 3A in favor of 0-3, General Office
District uses.
The public street right of way dedication and staged collector street construction
will provide a future access for the development of the "Hughes Estate Property"
which contains approximately 53 acres and is located along the northern
boundary of this site. The applicant states the property is functionally
land -locked property because the existing Sorrells Road access cannot be
brought to City standards in its present location due to (a) inadequate separation
distance between the present Cantrell Road intersection and the North Taylor
Loop Creek bridge end and (b) since the existing roadway curvatures are too
severe. The applicant states these deficiencies cannot be corrected without
acquisition or condemnation of private property external to the land -locked tract.
B. EXISTING CONDITIONS:
The site is vacant. The former driveway locations are still in place. There is
undeveloped property located immediately north of the site and there is a
single-family residence located immediately west of the site adjacent to Rummell
K?
FILE NO.: Z-5817-E(Cont.
Road. To the east of the site is a branch bank facility and medical office uses.
Further west is a drive-through restaurant and vacant commercially and office
zoned property. There are single-family residences in the Westchester
Subdivision located across Cantrell Road to the south and southwest. An office
use, a pet grooming/boarding facility and a private school are located to the
southeast.
Cantrell Road is a five -lane roadway with curb and gutter in place. There is no
sidewalk located adjacent to the sites being proposed for rezoning. There is a
sidewalk located immediately east of the site in front of the branch bank facility.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received a number of phone calls and letters from
area property owners. All property owners located within 200 feet of the site, all
residents, who could be identified, located within 300 feet of the site, the Pinnacle
Valley Neighborhood Association, the Westchester/Heatherbare Property
Owners Association and the Tulley Cove Property Owners Association were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan specifies
that the proposed street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way of 60 feet.
2. Sidewalks with appropriate handicap ramps are required to be installed
along Cantrell Road in accordance with Section 31-175 of the Little Rock
Code and the Master Street Plan.
3. Sidewalks with appropriate handicap ramps are required to be installed on
both sides of the commercial street in accordance with Section 31-175 of
the Little Rock Code and the Master Street Plan.
4. With site development, provide the design of the street conforming to the
Master Street Plan. Construct street improvements to the proposed
commercial street including 5 -foot sidewalks on both sides with the planned
development.
5. All driveways shall be concrete aprons per City Ordinance.
6. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
7. Stormwater detention ordinance applies to this property. What storm event
is being detained by each pond?
0
FILE NO.: Z -5817-E Cont.
8. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
9. Street Improvement plans shall include signage and striping. Traffic
Engineering must approve completed plans prior to construction.
10. On site striping and signage plans should be forwarded to Public Works,
Traffic Engineering for approval with the site development package.
11. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering 379-1813
(Steve Philpott) for more information.
12. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The south driveway on the
east side of the commercial street must be removed due to insufficient
distance from Cantrell Road.
13. The east driveway on Lot 2 should be moved further to the north to meet the
parking area on Lot 3A at a 90 degree angle.
14. No consistent stopping and backing vehicle movements are allowed on
public streets.
15. Street names and street naming conventions for the commercial street must
be approved by Public Works. Contact David Hathcock at (501) 371-4808.
16. Provide a letter prepared by a registered engineer certifying the sight
distance at the intersections comply with 2004 AASHTO Green Book
standards.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wgstewater: Sewer available to this project. Sewer mains shown running north
from the existing sewer main are not part of the Little Rock Wastewater Utility
System. Contact Little Rock Wastewater Utility for additional information.
Enter : A 15 -foot underground or a 30 -foot overhead utility easement is
required along Cantrell Road and along the common lot lines within the proposed
development. Contact Entergy for additional information.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
ii
FILE NO.: Z -5817-E Cont.
and/or private fire hydrants) a're required. They will be installed
stall and/or te
fire
Developer's expense. Please submit plans for water facilities
protection system to Central Arkansas Water for review. Plan revisions may be
required after additional review. Contact Central Arkansas Water regarding
procedures for installation of water facilities and/or fire service. Approval of plans
by the Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required. Contact Central Arkansas Water regarding the size
and location of the water meter. A Capital Investment Charge based on the size
of meter connection(s) will apply to this project in addition to normal charges.
This fee will apply to all connections including metered connections off private
fire systems. Due to the nature of this facility, installation of an approved
reduced pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the first point of
use. Central Arkansas Water requires that upon installation of the
RPZ assembly, successful tests of the assembly must be completed by a
Certified Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you would like
to discuss backflow prevention requirements for this project.
Fire Department: Place fire hydrants per code. Maintain a 20 -foot minimum
access around the perimeters of the site. Contact the Little Rock Fire
Department for additional information.
Count Plannin No comment.
CATA: Approved as submitted. The site is located on CATA Bus Route #25, the
Highway 10/Pinnacle Mountain Express Route.
Parks and Recreation: No comment received.
F. ISSU ES/TECHNICAL/DESIGN:
Plannin Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Suburban Office for this property. The
applicant has applied for a request to rezone the property from R-2, Single-family
to Planned Office Development to allow the creation of four lots with individual
buildings located on each to lot with the use of the site being office and retail
uses.
Master Street Plan: Cantrell Road is a Principal Arterial. The primary function of
a Principal Arterial is to serve through traffic and to connect major traffic
generators or activity centers within urbanized areas_ Entrances and exits should
be limited to minimize negative effects of traffic and pedestrians on Cantrell Road
since it is a Principal Arterial.
R
FILE NO.: Z -5817-E Cont.
G
H
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landsca e:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Site is located within the Highway 10 Overlay District and must comply with all
the standards set forth.
3. It appears some of the driveways are located within the forty -foot (40') wide
landscape buffer required along Cantrell Road.
SUBDIVISION COMMITTEE COMMENT:
(September 15, 2011)
Mr. Bill Dean was present representing the request. Staff presented an overview
of the development stating there were a number of outstanding technical issues
associated with the request. Staff stated the Highway 10 Design Overlay District
had specific development criteria dealing with building setbacks and landscaping.
Staff stated the site plan as presented did not fully comply with the typical design
standards of the Overlay. Staff noted signage allowed per the Highway 10 DOD.
Staff also questioned the proposed uses for the four lots.
Public Works comments were addressed. Staff stated the driveway as indicated
on the site plan did not comply with the driveway spacing requirement of the
Master Street Plan and the Subdivision Ordinance. Staff stated the drives were
located nearer the property line than allowed per these ordinances. Staff stated
the eastern driveway on Lot 2 should be, moved further to the north. Staff stated
streetlights were required prior to the issuance of the certificate of occupancy.
Landscaping comments were addressed. Staff stated the site plan as presented
did not comply with the landscaping requirements of the Highway 10 DOD. Staff
stated a portion of the drive was indicated within the front 40 -foot landscape strip.
The applicant was advised to respond to staff issues by September 21, 2011.
The Committee determined there were no other issues and forwarded the item to
the full Commission.
ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the September 15, 2011, Subdivision Committee meeting. The
revised plan has relocated driveways as requested by Public Works staff. The
drive located within the front 40 -foot landscape strip has been redesigned and
pulled back from the landscape area.
7
FILE NO.: Z -5817-E Cont.
As noted the property is located within the Highway 10 Design Overlay District.
The following notes the specific requirements of the Highway 10 DOD and the
applicant's compliance with the typical standards:
• There shall be a minimum development tract size of not less than two (2)
acres — the lots are proposed containing less than the two acre minimum
criteria, Lot 1 is proposed containing 1.19 acres, Lot 2 1.35 acres Lot 3A
0.90 acres and Lot 4 0.61 acres
• Principal and accessory buildings or structures are required to have a
one -hundred -foot building setback from the property line abutting
Highway 10 — the site plan is meeting the requirement
• Rear yard shall not be less than forty (40) feet — the rear yard building
setback is meeting this requirement
• Side yard shall not be less than thirty (30) feet — The eastern side yards on
Lots 2, 3A and 3 B do not meet this minimum requirement
• Landscaped areas shall attempt to incorporate existing on-site trees and
shrubbery into the landscaping scheme and the plans shall indicate such
incorporation — there are few on-site trees, the applicant has not indicated
trees will be saved
• Landscaped areas shall have water sprinkler systems to maintain plant
materials — irrigation will be provided
Erosion retardant vegetation shall be used on all cuts and fills — this criteria
will be met
+ Tree species to be planted within this corridor should be consistent with other
species present — this requirement will be met
• The Highway 10 frontage (front yard) shall consist of a minimum of forty (40)
feet of landscaped area exclusive of right-of-way. The landscaped area shall
contain organic and/or combined man-made/organic features as berms, brick
walls and dense plantings such that vehicular use areas are screened when
viewed from an elevation of forty-two (42) inches above the elevation of the
adjacent street. Alternative screening methods and designs must be
approved by the plans review specialist. Appeals from the staff will be
directed to the planning commission. Within the landscaped area trees shall
be planted or be existing at least every twenty (20) feet and have a minimum
of two (2) inches in diameter when measured twelve (12) inches from the
ground at time of planting — the 40 -foot buffer will be met, the applicant has
not indicated if the screening will be berming or plantings but has indicated
compliance with the DOD standard, trees will be planted per the Overlay
requirements
■ Rear and side yards shall have a landscaped buffer averaging a minimum of
twenty-five (25) feet from the property line. Where such yards abut a street
right-of-way, a fifteen -foot landscaped strip shall be required adjacent to land
zoned office and residential. A seven -foot landscaped strip shall be required
0
FILE NO.: Z -5817-E Cont.
when adjacent to lands zoned- commercial — Lot 1 is not meeting the 25 -foot
landscape strip requirement along the northern perimeter, the remaining
landscape strips appear to meet the Overlay standard
• Each separate commercial building will be allowed a single monument
ground -mounted sign located on the building site or in the landscaped front
yard of the commercial development. The sign shall be a maximum of six (6)
feet in height and seventy-two (72) square feet in area — signage will comply
with the typical Overlay standard — Lots 3A and 3B will share a single sign
• Maximum, one (1) curb cut per three hundred (300) feet and no curb cut
closer to an intersection than one hundred (100) feet - the site as developed
is not meeting this requirement
• Parking lot lighting shall be designed and located in such manner so as not to
disturb the scenic appearance preserved in this corridor. Lighting should be
directed to the parking areas and not reflected into the adjacent
neighborhoods — the site will comply with this development standard
• The maximum number of buildings per commercial development shall be
measured both by minimum tract size and minimum frontage as follows: One
(1) building every two (2) acres — the development is not complying with this
standard, the lots are proposed less than two acres
Although the applicant has done an adequate job in addressing the development
criteria of the Highway 10 Design Overlay standards staff is not supportive of the
request. The site is indicated as Suburban Office on the City's Future Land Use
Plan. Suburban Office is to provide low intensity development of office or office
parks in close proximity to lower density residential areas to assure compatibility.
The applicant is requesting a stand-alone commercial use, Battery Outfitters,
which does not meet the Suburban Office Land Use Classification.
STAFF RECOMMENDATION:
Staff recommends denial of the request as filed.
PLANNING COMMISSION ACTION: (OCTOBER 6, 2011)
Mr. Bill Dean and Mr. Lane Shumaker were present representing the request. There
were registered objectors present. Staff presented with a recommendation of denial.
Mr. Shumaker addressed the Commission concerning Battery Outfitters and their
operation. He presented slides of existing operations. He stated the neighbor at the
Rogers location was a bank. Mr. Shumaker stated the batteries provided by his store
were small batteries. He stated there were few automobile batteries changed at the
store but this was a service provided. He stated this was the first location in Little Rock.
He stated he did have a location in North Little Rock on JFK. He stated this was a
family owned and run business and not a franchise.
N
FILE NO.: Z -5817-E Cont.
Mr. Sill Dean addressed the Commission with regard to the overall development. He
stated the request would allow for the dedication of a public street which would benefit
the entire City and not just this development. He stated the development would also
address drainage issues in this area. He stated the development was willing to provide
detention for the 10, 25 and 50 year storm events and not just the 50 year as previously
indicated. He stated there were not a lot of homes located in the immediate area. He
stated there were two homes in Westchester located across from Lot 1 but the nearest
other homes were one quarter to one half a mile away.
Mr. Dean stated this was a logical break in commercial and office development. He
stated to the west was a significant floodplain and floodway. He stated this
development would not increase the traffic volumes on Cantrell Road. He stated
presently there were 26,000 to 38,000 vehicles per day on Cantrell Road. He stated the
positive impact would be reducing vehicle speeds and the potential for a traffic signal at
the intersection with the new collector street.
Mr. Dean stated the development was complying with the Highway 10 DOD standards
with regard to landscaping. He stated the development would contain three buildings
which were 100 percent office development. He stated the fourth building would be
33 percent retail traffic and 67 percent inventory storage. He stated he was willing to
limit any successor to no more than 50 percent retail traffic space with the remainder
warehouse or storage. Mr. Dean provided the Commission with a comparison of the
2006 approval and the current request indicating the overall development was less
building square footage and an increase in the overall green space. He stated the
building space was reduced by 48 percent and the number of parking spaces was
reduced by 35 percent. He stated the landscaping had been increased by 5,862 square
feet or 0.13 acres. Mr. Dean stated this was the logical location for a break from heavy
to light business. He stated this was the transitional zoned due to the natural barrier for
the next one half mile on the north side of Cantrell Road.
Mr. Ken Harrison addressed the Commission in opposition. He stated he was the
representative for the Tulley Cove Neighborhood Association. He stated his
neighborhood had been down a number of times in opposition of the request and
nothing had changed. He stated he felt this was a fine business and welcomed the
business to Little Rock but the business should be located in a commercial area. He
stated this area was a transitional area which allowed for office development. He stated
the City planners had done a good job and to allow the encroachment of commercial
businesses into transitional areas was not good planning. He stated this would allow a
scar on the corridor in an area the City was trying to keep beautiful.
Ms. Celia Martin addressed the Commission in opposition of the request. She stated
her home was located in the Westchester Subdivision. She stated the neighborhood
supported commercial businesses in commercial areas. She stated she was concerned
with the retail warehouse portion of the development. She stated she was unsure if the
development would have large trucks delivering batteries to various businesses around
town. She stated this area was a transition area and not a part of the commercial node.
She stated the commercial node was originally compact and located at the intersection
10
NO.: Z-5817-E(Cont.
of Cantrell Road and Taylor Loop Road. She stated the node had now expanded to
Burger King. She requested the Commission not expand the node even further.
Ms. Hallie Simmins addressed the Commission in opposition of the request. She stated
her home was on Countryside Cove. She stated when she and her husband bought
their home they called the City to find out the zoning of the property behind them and
was told single-family. She stated on a number of occasions signs had gone up on the
property and once again called the City and was reassured the property was zoned for
single-family use. She stated her concern was the future plans for the property if a
commercial street was constructed to serve the area. She stated her concern was that
the property could be rezoned to allow for apartments. She stated she felt commercial
should be kept at large intersections. She requested the Commission uphold the plans
of the previous planners and commissioners.
Mr. Kirk Simmins addressed the Commission in opposition of the request. He stated he
agreed with the previous speakers but wanted to add his concerns with potential
development of multi -family on the 53 acres to the north of the proposed road. He
stated the development was not an advantage to the neighborhood with regard to the
new street and drainage. He stated he felt these non -issues.
Mr. Don Henderson addressed the Commission in opposition of the request. He stated
his home was on Countryside Cove. He stated he did not have an objection to the
battery store but he did not feel this was the proper location. He stated he did not want
Cantrell Road to be another Asher Avenue with the number of commercial businesses
and the number of curb cuts. He stated he recently pulled onto Cantrell Road and it
took him 50 minutes to travel from his home to Reservoir Road. He stated once a
variance was approved the developers would be down requesting additional variances
from the plan.
Mr. Gary Cope addressed the Commission in opposition of the request. He stated he
did not feel this was the type development the City envisioned on the route to Pinnacle
Mountain and the State Park. He stated it was near impossible to get out on Cantrell
Road from Rummell Road. He stated a number of times one was forced to turn right
and go down the road to turn around to go east on Cantrell Road.
Ms. Dawn Piasifka addressed the Commission in opposition of the request. She stated
she wanted to share with the Commission a comment from her 25 year old son. She
stated when she moved to her home on Tulley Cove her son stated on his first trip to
see the new home he loved the drive out. She stated she felt it important for the
Commission to know that a 25 year old had noticed the beauty and peacefulness of the
roadway and enjoyed the drive.
Mr. Greg Williams addressed the Commission in opposition. He questioned if there
would be a right turn lane for the development. He stated his fear was his daughter,
who made a number of trips out on a daily basis, when trying to get onto Cantrell Road
with cars slowing and others pulling out around vehicles that were slowing to enter the
site would create a greater unsafe condition. He challenged the Commission to take the
11
FILE NO.: Z -5817-E (Cont.
easy way out. He stated the staff and the neighborhoods did not feel this was the right
development for the site so he encouraged the Commission to deny the request.
Ms. Ruth Bell, League of Women Voters addressed the Commission in opposition of the
request. She stated she was around when the Highway 10 Overlay was being drafted
and implemented. She requested the Commission uphold the plan and deny the
request. She stated the site was identified as Suburban Office and did not feel 0-3
uses were appropriate for this classification. She stated this was not an appropriate
area for an office warehouse development.
Mr. Phil Cox addressed the Commission in opposition of the request. He stated his
home was located in Tulley Cove. He stated he felt the Commission was well aware of
the water issues in this area. He stated he felt now the sales tax had passed the City
could find a real though out solution to the drainage problems in the area.
Mr. Dean requested public works comment on the location of the proposed street. He
stated the project was not for benefit of the property owner but for the entire City. He
stated the development would create a tax base and jobs. He requested the
Commission look at the greater good.
Staff stated the street was not a part of the Master Street Plan but at some point in the
future could become a viable part of the street network. Staff stated this was not the
issue before the Commission. Staff stated they had reviewed the drainage in the area
and felt in the near future a plan could be implemented to aid in the drainage issues.
Commissioner Laha questioned the depth of the property. Staff stated the property was
250 feet at the proposed street location. Commissioner Laha stated with the Highway
10 Overlay and the build setback of 100 -feet created a hardship on potential
development in the area.
The Commission questioned the distance the residential in the area. Mr. Dean stated
Tulley Cove was one half a mile away and Countryside Cove was one quarter to one
half a mile. There was a general discussion concerning the development, the impact on
nearby residential and the proposed collector street.
The chair entertained a motion for approval of the item subject to all staff comments in
sections D, E and F of the agenda write-up. The motion failed by a vote of 1 aye,
8 noes and 2 absent.
12
ITEM NO.: 9. Z -5817-E
NAME: Magnolia Terrace Addition Short -form POD
LOCATION: located at 15104 Cantrell Road
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than September 21, 2011. The Office of
Planning and Development must receive the proof of notice no later than September
30, 2011.
2. The Highway 10 DOD typically requires the placement of a 25 -foot side and rear
yard landscape strip and a 40 -foot front yard landscape strip.
3. The Highway 10 DOD typically requires the placement of a 40 -foot rear yard building
setback, 30 -foot side yard setbacks and a 100 -foot front yard setback.
4. Commercial development signage is limited to a single monument style sign not to
exceed six feet in height and seventy-two square feet in area. Building signage is
limited to a maximum of ten percent of the fagade area abutting the public street.
Provide the dimension for the indicated ground signage on the site plan.
5. All site lighting is to be low level and directional, directed downward and into the site.
6. Is the development proposing the placement of the ten percent accessory uses as
identified in the 0-3, General Office Zoning District within the office buildings?
7. Indicate on the site plan the proposed dumpster locations and provide a note on the
site plan if the hours of dumpster service will be limited to daylight hours.
Variance/Waivers: None requested.
Public Works Conditions:
1. Due to the proposed use of the property, the Master Street Plan specifies that the
proposed street for the frontage of this property must meet commercial street
standards. Dedicate right-of-way of 60 feet.
2. Sidewalks with appropriate handicap ramps are required to be installed along
Cantrell Road in accordance with Section 31-175 of the Little Rock Code and the
Master Street Plan.
3. Sidewalks with appropriate handicap ramps are required to be installed on both
sides of the commercial street in accordance with Section 31-175 of the Little Rock
Code and the Master Street Plan.
4. With site development, provide the design of the street conforming to the Master
Street Plan. Construct street improvements to the proposed commercial street
including 5 -foot sidewalks on both sides with the planned development.
5. All driveways shall be concrete aprons per City Ordinance.
6. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
Item # 9.
7. Stormwater detention ordinance applies to,this property. What storm event is being
detained by each pond?
8. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
9. Street Improvement plans shall include signage and striping. Traffic Engineering
must approve completed plans prior to construction.
10. On site striping and signage plans should be forwarded to Public Works, Traffic
Engineering for approval with the site development package.
11. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
12. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The south driveway on the east side of
the commercial street must be removed due to insufficient distance from Cantrell
Road.
13. The east driveway on Lot 2 should be moved further to the north to meet the parking
area on Lot 3A at a 90 degree angle.
14. No consistent stopping and backing vehicle movements are allowed on public
streets.
15. Street names and street naming conventions for the commercial street must be
approved by Public Works. Contact David Hathcock at (501) 371-4808.
16. Provide a letter prepared by a registered engineer certifying the sight distance at the
intersections comply with 2004 AASHTO Green Book standards.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project. Sewer mains shown running north from
the existing sewer main are not part of the Little Rock Wastewater Utility System.
Contact Little Rock Wastewater Utility for additional information.
Entergy: A 15 -foot underground or a 30 -foot overhead utility easement is required
along Cantrell Road and along the common lot lines within the proposed development.
Contact Entergy for additional information.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. The Little Rock Fire Department needs
to evaluate this site to determine whether additional public and/or private fire hydrant(s)
are required. They will be installed at the Developer's expense. Please submit plans
for water facilities and/or fire protection system to Central Arkansas Water for review.
Plan revisions may be required after additional review. Contact Central Arkansas Water
regarding procedures for installation of water facilities and/or fire service. Approval of
plans by the Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required. Contact Central Arkansas Water regarding the size and
location of the water meter. A Capital Investment Charge based on the size of meter
Item # 9.
connection(s) will apply to this project in addition to normal charges. This fee will apply
to all connections including metered connections off private fire systems. Due to the
nature of this facility, installation of an approved reduced pressure zone backflow
preventer assembly (RPZ) is required on the domestic water service. This assembly
must be installed prior to the first point of use. Central Arkansas Water requires that
upon installation of the RPZ assembly, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of Arkansas and
approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
Fire Department: Place fire hydrants per code. Maintain a 20 -foot minimum access
around the perimeters of the site. Contact the Little Rock Fire Department for additional
information.
Countv Planninq: No comment.
CATA: Approved as submitted. The site is located on CATA Bus Route #25, the
Highway 10/Pinnacle Mountain Express Route.
Parks and Recreation: No comment received.
Planning Division: This request is located in the River Mountain Planning District. The
Land Use Plan shows Suburban Office for this property. The applicant has applied for a
request to rezone the property from R-2, Single-family to Planned Office Development
to allow the creation of four lots with individual buildings located on each to lot with the
use of the site being office and retail uses.
Master Street Plan: Cantrell Road is a Principal Arterial. The primary function of a
Principal Arterial is to serve through traffic and to connect major traffic generators or
activity centers within urbanized areas. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Cantrell Road since it is a
Principal Arterial.
Bic cle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Site is located within the Highway 10 Overlay District and must comply with all the
standards set forth.
3. It appears some of the driveways are located within the forty -foot (40') wide
landscape buffer required along Cantrell Road.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, September 21, 2011.
Item # 9.