Loading...
HomeMy WebLinkAboutZ-5817-A Map 2S8TOi'13"E General Notes 1. All paved areas to be asphalt w/ concrete curb & gutter. 2. Lot 1 - 9000 SF (0-3 Uses w/ 10% Accessory Uses) 3. Lot 2 - 12600 SF (0-3 Uses w/ 10% Accessory Uses) 4. Lot 3 - 15000 SF (Two Bldgs) (0-3 Uses w/ 10% Accessory Uses) 5. Underground detention to be designed to CLR requirements per ordinance. 6. All work in the Hwy R/W to meet AHTD Standards. 7. Signage to comply with Highway 10 DOD, with additional landscaping around sign location. 8. Site lighting to be low level and directional, directed inward away from residentially zoned properties. 9. Dumpsters to be visually screeed to best blend into overall site appearance and be as visually appealing as possible. Pickup times to be restricted to the hours of lam to 7 pm. Lot 1 - 28 Spaces Provided (1 Space / 321 SF) Reqd # of Handicap Spaces to be provided) Lot 2 - 36 Spaces Provided (1 Space / 350 SF) Reqd # of Handicap Spaces to be provided Lot 3 - 43 Spaces Provided (1 Space / 349 SF) Reqd # of Handicap Spaces to be provided Storm S86°51'05"E to ig6l Y 10 Vanes 20 0 20 20 sc_�le feet S86'5C32"E 01 :r DRAwNC Sheei__ 1 Of 1