HomeMy WebLinkAboutZ-5804 ApplicationBILL OF ASSURANCE
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, BAPTIST MEDICAL SYSTEM, 9601 Interstate 630, Exit 7, Little
Rock, Arkansas, is the sole owner of the following described lands situated in Pulaski
County, Arkansas, to wit:
PROPERTY DESCRIPTION
Part of the Southeast 1/4 of the Southeast 1/4 of Section 3 and part of the Northeast 1/4 of
the Northeast 1/4 of Section 10 all in T -1-N, R -13-W, Pulaski County, Arkansas being more
particularly described as follows:
Beginning at the Northwest corner of Lot 7, Baptist Medical Center development as recorded
in Plat Book A at Page 477; thence North 01'49'18" East along the East right-of-way line of
Emergency Drive 729.22 feet; thence continuing along said East right-of-way line on a curve
to the right having a radius of 40.00 feet, an arc distance of 81.34 feet and a chord which
bears North 60°04'50" East 68.03 feet to the South right-of-way line of Lile Avenue; thence
along said South right-of-way line of Lile Avenue on a curve to the left having a radius of
554.51 feet, an arc distance of 164.79 feet and a chord which bears South 70°10'21" East
164.19 feet; thence South 01'49'18" West 716.77 feet to the North line of said Lot 7; thence
North 87030'22" West along said North line of Lot 7 a distance of 214.01 feet to the POINT
OF BEGINNING containing 3.655 acres, more or less.
shown on the plat herein mentioned as Lot 13 of Baptist Medical Center Campus,
City of Little Rock, County of Pulaski, State of Arkansas; and
WHEREAS, said owner desires to subdivide the above property into a single lot;
NOW, THEREFORE, the said BAPTIST MEDICAL SYSTEM, hereinafter referred
to as the "Grantor", has caused said property to be surveyed by The Mehlburger Firm,
Registered Professional Engineers and Registered Professional Land Surveyor, and a plat
thereof which in identified by the title, "Lot 13 of Baptist Medical System Campus", to the
City of Little Rock, Pulaski County, Arkansas," and dated to 18th day of June , 1994 and
by the signature of the Circuit Clerk and ex -officio Recorder of Pulaski County, Arkansas
and being now of record in Plat Book D at page 727 , in the records of the said Circuit
Clerk; therefore, the Grantor herein does make this Bill of Assurance.
Bill of Assurance
Page 2 of 5
The Grantor hereby certifies that it has laid off, platted and subdivided, the said lands
in accordance with said plat. The lands embraced in said plat shall be forever be known and
described as "Lot 13 of Baptist Medical Center Campus" to the City of Little Rock, Pulaski
County, Arkansas, and conveyance of said land by lot number shown on the plat shall be
considered a complete and proper description thereof.
There are certain strips of ground shown and described on the plat, marked "Utility
Easements and reserved for the use of public utilities purposes, subject at all times to the
proper authorities and to the easements herein reserved. Owners of the above-described
property shall take their title subject to the rights of public utilities and the public.
The filing of this Bill of Assurance and plat for record in the Office of the Circuit
Clerk and ex -officio Recorder of Pulaski County shall be a valid and complete delivery and
dedication of the easements and street rights -of -ways shown on the said plat.
The lot shall be subject to the following covenants:
1. Any rights-of-way behind the curb of the lot shall be maintained by the owners
of the lot.
2. Said land within said lot shall be held, owned, and used in compliance with the
zoning, subdivision, landscaping, runoff detention, excavation and sign
ordinances of the City of Little Rock as they applied to said land at the time of
recording hereof or as such ordinances may be amended from time to time to
provide for less restrictive use.
3. Easements of way for streets shown on the plat filed herewith have heretofore
been donated and dedicated to the public, and person, firms or corporations
Bill of Assurance
Page 3 of 5
engaged in supplying public utility services, the same being without limiting
the generality of the foregoing, electric, power, gas, telephone, water and
sewer, shall have the right to use and occupy said easements of way and street
for the installation, maintenance, repair and replacement of such facilities as
are necessary to supply such utility services. Easements for the installation,
maintenance, repair and replacement of utility facilities and services, sewer
and drainage, have theretofore been reserved, said easements being of various
widths, reference being made to the plat filed herewith for a specific
description of the width and location thereof. Excavations within the area of
such easements of the erection of any fence (wood, wire, stone, brick or any
other material) or for any other purpose shall be made without interference
with the installation, maintenance, repair and replacement of any utitility
facilities and services.
4. These covenants and restrictions shall run with the land and shall be binding
on all parties claiming under them in perpetuity.
5. The covenants and restrictions herein set forth shall run with the land and shall
bind the present owner, its successors and assigns, and all parties claiming by
through under it shall be taken to hold, agree and covenant with the owner of
the lots hereby restricted, and with its successors and assigns, and with each of
them to conform to and observe said covenants and restrictions as to the use of
such lots in the construction of improvements thereon, but no restrictions
herein set forth shall be personally binding upon any corporation, person or
Bill of Assurance
Page 4 of 5
person, except in respect to breaches committed during its, his or their seisin
of title to said land, and Grantor, its successors and assigns, and also the
owner or owners of the lot hereby restricted shall have the right to sue for and
obtain in injunction, prohibited or mandatory, to prevent the breach of or to
enforce the observance of the covenants and restrictions above set forth, in
addition to ordinary legal action for damages. Failure of Grantor, its
successors or assigns, or any owner of owners of such lots to enforce any of
the covenants restrictions herein set forth at the time of its violations shall, in
no event, be deemed to be a waiver of the right to do so thereafter.
6. In the event any provision of this Bill of Assurance shall be determined to be
invalid by a court of competent jurisdiction, such invalidity shall not affect the
remaining provisions, which shall remain in full force and effect.
7. Any and all of the covenants set forth herein may be amended, modified,
extended, changed or canceled in whole or in part from time to time by
written instrument signed and acknowledged by the owner or owners of tow -
thirds (2/3rds) of the total land included in Lot 13.
Bill of Assurance
Page 5 of 5
EXECUTED at Little Rock, Arkansas, this 17th day of June , 1994.
BAPTIST MEDICAL SYSTEM
Larry Lazenby, Senior Vice President
ATTEST
LOU
In the State of Arkansas
In the County of Pulaski
Date:
ACKNOWLEDGEMENT
On this day personally appeared before me, the undersigned, a Notary Public, duly
commissioned and acting, Larry Lazenby, Senior Vice President of BAPTIST MEDICAL
SYSTEM, an Arkansas corporation, Grantor, who stated and acknowledged that he had
executed the aobve and foregoing Bill of Assurance with due authority from said Corporation
and for the uses and purposes therein contained and set forth.
My Commission Expires:
Notary Public
(SEAL)
LITTLE ROCK PLANNING COMMISSION
By: Date:
City of Little Rock
Department of
Public Works
701 ';;est t.1,ar1r,h9m
Little Rock, Arkansas
.371-4800
MEMO
FEBRUARY 24, 1994
TO: Richard Wood, Planning Manager
VIA: Jerry Gardner, Civil Engineering Manager
FROM: Tad Borkowski
SUBJ: March 22, 1994 Planning Commission Agenda
Civil And Traffic Engineering review
PRELIMINARY PLATS:
Camp Addition (S-1008)
No Comments.
72201-1300
Engineering Division
Chenal Business Addition (S-1009)
Dedicate 10' of additional right-of-way on Chenal. Construct additional lane on
Chenal Parkway with sidewalks and improvements on Markham including
sidewalks. Construct sidewalks on Atkins Road. Detention and Excavation
Ordinances apply. Show Pagis Monuments.
Apple Subdivision (S-1010)
Construct Apple Blossom Lane to meet Master Street Plan requirements. Comply
with Section 31-402 Street lighting installation.
Mary Kay Addition (S-1011)
Dedicate right-of-way and construct improvements to Sullivan Road and Brixie
Road. Detention and Excavation Ordinances apply. Comply with Section 31-402
Street lighting installation.
Freeway Business Park (S-1012)
Construct sidewalk on Hughes Street. Construct 36' wide road on Freeway Drive
and dedicate 60' right-of-way with sidewalks on both sides. Detention and
Excavation Ordinances apply. Comply with Section 31-402 Street lighting
installation.
Big "K" Subdivision (S-1013)
Construct 36' road and dedicate 60' right-of-way on Labette Drive and show
centerline alignment to connect with Labette Drive to the west. Detention and
Excavation ordinances apply.
PLANNED UNIT DEVELOPMENTS:
P & L Investment Co. (Z -4016-D)
No Comments.
Freeway Business Park (Z -4249-A)
Construct sidewalk on Hughes Street. Construct 36' wide road on Freeway Drive
and dedicate 60' right-of-way with sidewalks on both sides. Detention and
Excavation Ordinances apply. Comply with Section 31-402 Street lighting
installation.
The Washing Well (Z -5106-A)
Dedicate right-of-way and construct sidewalk along Highway 10.
Walgreens, Rodney Parham & Hinson (Z -5412-B)
Dedicate right-of-way and construct Master Street Plan improvements on N.
Rodney Parham. Construct sidewalk along Hinson Road and Buff Lane.
Detention and Excavation ordinances apply.
The Oaks of Chenal, Lots B & G (Z -5588-A)
Comply with section 31-402 street lighting. Remove section of island from the
entrance to the subdivision.
Barrow Mini -Storage (Z-5709)
Construct 36' road and dedicate 60' right-of-way on Labette Drive. Construct cul-
de-sac or hammer head on the end of Labette Drive. Detention and Excavation
ordinances apply.
Coulson Oil Company (Z-5799)
Construct sidewalks along Highway
Excavation Ordinances Apply.
10 and Southridge Drive. Detention and
Bowman Commercial Park (Z-5800)
Construct Master Street Plan improvements to Bowman Road and Dedicate right-
of-way. Detention and Excavation ordinances apply.
Medical Electronics (Z-5801)
Dedicate right-of-way and construct Master Street Plan improvements to Lawson
Road. Detention and Excavation Ordinances apply.
Dick Layton Buick (Z-5803)
Dedicate 10' of right-of-way and construct additional lane on Chenal Parkway.
Detention and Excavation ordinances apply. Construct improvements along
Markham and sidewalks along Atkins Road.
Perkins Subdivision, Lot 1 (Z-5806)
Dedicate right-of-way and construct Master Street Plan improvements to
Bowman Road. Detention and Excavation ordinances apply.
SITE PLAN REVIEWS:
Independence Square, Phase III (S -357-A)
Construct sidewalk laong Woodland Heights Road. Detention and Excavation
Ordinances apply.
Baptist Adolescent Transitional Home (Z-5804)
Detention and Excavation Ordinances apply.
CONDITIONAL [.USES:
Custom Services for the Home (Z-5796)
No Comments.
Byrd Daycare Center (Z-5797)
Dedicate additional 5' of right-of-way on Zion. Provide parking for drop-off and
employees.
United Properties (Z -4103-C)
Construct sidewalk along Garfield Drive. Eliminate Cul-de-sac from the plan or
explain how you are going to terminate both ends of the street. Detention and
Excavation ordinances apply.
Sonic Drive-in
Dedicate right-of-way and construct Westhaven Drive along property. Construct
additional lane on Chenal Parkway to meet Master Street Plans. Close one
driveway.
RIGHT OF WAY ABANDONMENT:
Birchwood Drive (G-23-206)
No objection.
02/28'94 08:44 $501 3771244 LRM NATER WORKS
PLANNING COMMISSION REVIEW
LITTLE ROCK MUNICIPAL WATER WORKS
22 March 1994 Meeting
0002'004
ITEM NAME
TYPE ISSUE
COMMENTS
--
A SHACKLEFORDIRD
- PRELIM-
- A water main extension will be
INDUSTRIAL PARK
PLAT
required. A pro rata front footage
S-1003
charge of $15/front foot applies in
addition to the normal connection
charge for connections off of
Shackieford Road,
S. ZU ZU'S
- CUP
- The S" water main and abandoned r/w of
Z -5524-B
Birchwood Dr (retained as a utility
easement) should be shown. This main
may conflict with the proposed sewer
main to the east.
1. CAMP ADD
- PRELIM
- A water main extension and possibly a
PLAT
private fire hydrant will be required
S-1008
to serve this property.
2. CHENAL BUSINESS ADD
- PRELIM
- The water main in West Markham is a 20"
PLAT
main, Domestic service is not allowed
8-1009
off of a 20" water main. A Nater main
extension and possibly on site fire
protection will be required,
3 APPLE SUE
- PRELIM
- A water main extension will be
PLAT
required. It appears that Apple Dr. is
5-1010
private. An acreage charge of
$150/acre applies in addition to the
normal charges.
4. MARY 'KAY ADD
- PRELIM
- An acreage charge a $150/acre applies
PLAT
in addition to the normal connection
S-1011
fee. Execution of a Pre -annexation
Agreement and approval of the City or
Little Rack will be required to obtain
water service.
5. FREEWAY BUSINESS
- PRELIM
- A water main extension will be
PARK
PLAT
required. An acreage charge of
S-1012
$150/acre applies in addition to the
normal charges.
6. BIG "K" SUE
- PRELIM
- Pro rata front footage charges of
PLAT
$15/ft apply for water connections off
S-1013
of the main in LaBette Dr.
7, P&L INVESTMENT CO
- PCD
- No objection. Has existing service.
Z -4016-D
8, FREEWAY BUSINESS - PCD - A water main extension will be
PARK Z -4249-A required. An acreage charge of
6150/acre applies in addition to the
normal charges. On site fire
protection will probably be required*
for some lots.
02/28/94 08:45 '$501 3771244
LRM WATER WORKS 0 003/004
PLANNING COMMISSION
REVIEW
LITTLE ROCK MUNICIPAL
WATER WORKS
22 March 1994
Meeting
ITEM
NAME
TYPE ISSUE
COMMENTS
9.
WASHING WELL
- PCD -
No objection.
Z -5106-A
10.
WALGREENS / RODNEY
- PCD Z-5412 -
No objection.
PARHAM & HINSON SUB
11.
OAKS OF CHENAL
- PRD -
Water main extensions will be required.
Z -5588-A
An acreage charge of $300 per acre
applies in addition to normal charges.
12.
BARROW MINI -STORAGE
- PCD Z-5709 -
On site fire protection will be
required.
13.
COULSON OIL CO
- PCD Z--5799 -
Details of water main relocation will
need to be more specific and layout
will vary from that shown. Water main
will need to be laid outside of highway
right-of-way and Water Works will need
a 10 foot easement adjoining the back
side of the 20 foot permanent
construction easement for construction
of this main.
14.
BOWMAN COMMERCIAL
- PCD Z-5800
- On site fire protection will be
PARK
required,
15.
MEDICAL ELECTRONICS
- PCD Z-5801
- No objection.
INC
16.
DICK LAYTON BUICK
- PCD Z-5803
- On site line will be a private fire
service. Main in Markham is a 20" not
10" as shown. We rcommend the
installation of a main on the westerly
side of Chenal Pkwy. across this
property. The fire service could be
taken off of this'main. A main would
be in place across this property to
serve the property to the south. It
appears that an extension at that point
eliminates the need for a main crossing
West Markham St.
17.
PERKINS SUB
- PCD Z-5806
- A water main extension will be
required.
18. INDEPENDENCE SQUARE - SITE PLAN
PH 3 5-357-A
- The fire Department will probably
recommend an additional public fire
hydrant be installed in conjunction
with this project. The installation of
this hydrant will be by the water Works
at Water Works expense, but will need
to be coordinated with the contractor.
02/28/94 08:45 $501 3771244 LRX WATER WORKS
PLANNING COMMISSION REVIEW
LITTLE ROCK MUNICIPAL WATER WORKS
22 March 1994 Meeting
ITEM
NAME
TYPE ISSUECOMMENTS
-----r-- _-_______-_--_-_
19.r
- -
BAPTIST ADOLESCENT-
~ -Tr
SITEQPPLAN -
n site will be
edfirenprotection
TRANSITIONAL HOME
$150/acre applies in addition t0 the
normal connection charge.
20.
CUSTOM SERVICES FOR
- CUP Z-5796 -
No objection.
THE HOME
21.
BYRD OAYCARE CENTER
- cup 2-5797
- No objection.
22.
UNITED PROPERTIES
- CUP
An acreage charge of $150/acre applies
Z -4103-C
in addition to the normal connection
charges.
23.
SONIC QRIVE-IPi
- CUP Z-5507
- No objection 'Ab kiI
2,.
BIRCHWOOD OR
- ABANDON
- The r/w � be r=ned as a
ds to
RGW
-s=i1 *-f easement. There is an
G-23-206
existing 8" water main in this
right-of-way,
25.
CHENAL PKWY &
- REZONE
- No objection. A water mair extension
MARKHAM
will be required.
26.
CHENAL COMMERCIAL
- EXTEND
- No objection.
PARK
TIME S-962
27.
UNIVERSITY OFFICE
- EXTEND
- No objection.
PARK
TIME
S-203-9
11004/004
Little Rock 221 E. Capitol
WastewaterO Little Rock, Arkansas 72202
Utility
501/376-2903
Fax: 501/376-3541
SUBDIVISION COMMITTEE REVIEW
March 03, 1994
A. Preliminary Plats
1. Camp Addition
Sewer Main located on property. Easement must be provided.
Contact Little Rock Wastewater Utility for details.
2. Chenal Business Addition
Sanitary Sewer Easement shown must match the location of the
existing 10" Sewer Main shown on Plat.
3. Apple Subdivision
Sewer Main Extension required with Easements.
4. Mary Kay Addition
Outside service boundary. No Comment.
5. Freeway Business Park
Sewer main located on property has never been accepted by Little
Rock Wastewater Utility. Sewer Main extension required with
easements. Contact Little Rock Wastewater Utility for details.
6, Big "K" Subdivision
Sewer Main Extension required with Easements.
B. Planned Unit Developments
7. P&L Investment Company
Sewer available, not adversely affected.
8. Freeway Business Park
See Item 5 Above For Comment
9. The Washing Well
Sewer available, not adversely affected.
I
SUBDIVISION COMMITTEE REVIEW
March 03, 1994
10. Walgreens Rodney Parham & Hinson
Sewer available in Hinson Road and Buff Lane. Developer will be
required to extend sewer service to property.
11. The Oaks of Chenal, Lots B & G
Sewer Main Extension required with Easements.
12. Barrow Mini -Storage
Sewer main relocation must be approved by Little Rock
Wastewater Utility and completed prior to any construction within
the existing sewer main easement.
13. Coulson Oil Co.
Sewer available, not adversely affected.
14. Bowman Commercial Park
Sewer Main located on property. No permanent structure shall be
built over existing sewer easement. Contact Little Rock
Wastewater Utility for details.
15. Medical Electronics, Inc.
Outside service boundary. No Comment.
16. Dick Layton Buick
See Item 2 Above For Comment.
17. Perkins Subdivision, Lot 1
Sewer main extension required with easements. Capacity
Contribution Analysis Required. Contact Little Rock Wastewater
Utility for details.
C. Site Plan Review
18. Independence Square
Sewer available, not adversely affected.
19. Baptist Adolescent Transitional Home
Sewer available, not adversely affected. Capacity Contribution
Analysis Required. Contact Little Rock Wastewater Utility for
details.
2
SUBDIVISION COMMITTEE REVIEW
March 03, 1994
D. Conditional Use Permit
20. Custom Services For The Home
Sewer available, not adversely affected.
21. Byrd Daycare Center
Sewer available, not adversely affected.
22. United Properties
Sewer main relocation must be approved by Little Rock
Wastewater Utility and completed prior to any construction over
the existing sewer main.
23. Sonic Drive In
Sewer mains installed for Parkway West Commercial Addition
have never been accepted by Little Rock Wastewater Utility. No
Sewer Service Available for this property. Contact Little Rock
Wastewater for details.
E. Right Of Way Abandonment
24. Birchwood Drive
No objection to right of way abandonment, however, right of way
must be retained as a utility easement.
F. Rezonings
25. A Tract of land, in the vicinity of Chenal Parkway and West Markham
Street, from 0-3 to C-2
No objection.
3
LiCity of Little Rock
Department of Neighborhoods and Planning
723 West Markham
Little Rock, Arkansas 72201-1334
(501) 371-4790
AIEi<IORAINDUM
Feb. 28, 1994
TO: Richard Wood, Zoning and Subdivision Manager
FROM: Bob Brown, Plans Review Specialist
SUBJECT: Buffer/Landscape Review of the Tentative Subdivision Agenda for March
22, 1994.
Planning
Zoning and
Subdivision
B. Zu Zu's (Z -5524-B)
The proposed 6 ft. high opaque wood fence needs moved eastward 4 ft. to provide
greenspace between the vehicular use area and screening fence. This fence must be
the good neighbor type. The dumpster must be enclosed on three sides t-,zth an 8 ft.
high opaque wall or fence. *The plan submitted is short of the 6% interior
landscaping required by 270 sq. ft.
7. P&L Investment Co. (Z -4016-D)
The landscaping has deteriorated and needs to be fiilly reinstalled and maintained.
8. Freeway Business Park(Z-4249-A)
Landscape areas equal to a 3 ft. wide landscape strip are required between public
vehicular parking areas and the bldg. they serve. A 6 ft. high opaque screen is
required along the southern and eastern perimeters adjacent to lands zoned
residential. This screen must be a good neighbor wood fence or dense evergreen
plantings.
9. The Wishing Well (Z -5106-A)
An opaque screen 6 ft. in height is required to screen the proposed use from the
residential property use from the residential property to the south, east and west. This
screen can be a good neighbor wood fence or dense evergreen plantings. The
landscape strip width west of the proposed parking lot must be increased to 6 ft.
10. Walgreens (Z -5412-B)
The full average buffer width required along Hinson Rd. is 20 ft. and 12 ft. along
Rodney Parham Rd. The buffer width along Hinson Rd. should be increased to
a minimum of 13 ft. in width. A 6 ft. high opaque screen is required along the
western perimeter to screen the proposed use from the. residential zoned property
to the west.
11. The Oaks of Chenal (Z -5588-A)
N/A
12. Barrow 1<'Iin-Storage (Z-5709)
The buffer width along Barrow Rd. and the western perimeter should be increased to
24 ft. in order to rneet the full requirement. The buffer «idths along Labette Dr. and
the southern perimeter should be increased to an average width of 16 ft. A 6 ft. high
opaque screen will be required to screen business activity from the residential
properties to the south and west.
13. Coulson Oil Co. (Z-5799)
The Highway 10 Overlay Ordinance requires additional screening and trees along
Cantrell Rd. above that required by the Landscape Ordinance. A sprinkler system to
water the plants will be necessary.
14. Bowman Commercial Park (Z-5800)
The buffer width along Bowman Rd. should be increased to an average minimum
width of 27 ft. and along the eastern perimeter to 33 ft. The full buffer requirements
without transfers are 40 ft. and 50 ft. respectively. A 6 ft. high opaque Qood neighbor
wood fence or dense evergreen plantings will be required to screen this use from the
residential properties to the north, south and east.
15. Afedical Electronics, Inc. (Z-5801)
This site will be required to be screened from the residential properties to the south,
east and west. This screen may be a 6 ft. high good neighbor type Food fence or
dense evergreen plantings. Existing and proposed vehicular use areas «-ill have to
fully comply 'With the Landscape Ordinance.
16. Dick LaNrton Buick (Tr5503)
The average full buffer wwidth required along Chenal Parkway is 34 ft. The miztin�um
average requirement with transfers is 23 ft. A width of 20 ft. is shoxNm on the plan .
submitted. Sone of the proposed areas for car display from the property line along
W. Markham St. is less than the 20 ft. setback required in areas zoned for outdoor
display.
17. Perkins Planned Commercial Development (Z-5806)
A 6 ft. high opaque, screen will be required to screen this site from the residential
properties to the north, south, and east. This screen can be a wood good neighbor
fence or dense ev=ergreen plantings.
18. Independence Square, Phase JU (5-357-A)
The average full buffer width required along Woodland Heights Rd. is 20 ft. The
minimunr average requirement is 13 ft.
J. aptust ALLV1�J<LLT1L 1 r 41n1-]liiVLA4R IAvu�"
1R
The areas set aside on the proposed plan for buffers and landscaping exceed
ordinance requirements.
13 City of Little Rock
Department of Neighborhoods and Planning
723 West Markham
Little Rock, Arkansas 72201-1334
(501) 371-4790
Name: Baptist Adolescent Transitional Hore
File No. Z-5805
Location: E. side Lile Ct., 350' N of Lile
TvDe of Issues: Dr,
RE:
Date February 14 1994
Planning
Zoning and
Subdivision
Arkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
Public Works Department - Engineering
Parks and Recreation Department
Neighborhoods & Planning - Site Plan Review
Graphics
TO WHOM IT MAY CONCERN:
On March 22 19 gam_ , the Little Rock Planning
Commission will consider the above referenced subject.
Note: Interdepartmental Meeting held on
A copy of the Issue is enclosed for your consideration, and your
comments and/or recommendations will be greatly appreciated.
sincerely,
Depa tment of Neighborhoods and Planning
(Please respond below, and return this letter for our records.)
Approved as submitted
Easement required (see attached plat or description)
Comments: _
By: GsJ
Enclosure
13 City of Little Rock
Department of Neighborhoods and Planning
723 West Markham
Little Rock, Arkansas 72201-1334
(501) 371-4790
RE:
Date February 14, 1994
Planning
Zoning and
Subdivision
Name: Baptist Adolescent Transitional Hor
File No. Z-5805
Location: E. side Lile Ct., 350' N of Li]
Type of Issues: Dr.
Arrkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
Public Works Department - Engineering
Parks and Recreation Department
Neighborhoods & Planning -- Site Plan Review
Graphics
TO WHOM IT MAY CONCERN:
On March 22- , 19 94 , the Little Rock Planning
Commission will consider the above referenced subject.
Note: Interdepartmental Meeting held on . >~Ah,-1.larr95, 1995 •
A copy of the Issue is enclosed for your consideration, and your
comments and/or recommendations will be greatly appreciated.
Sincerely,
Department of Neighborhoods and Planning
(Please respond below, and return this letter for our records.)
Approved as submitted
Easement required (see attached plat or description)
Comments:
By:
Enclosure'
e
e
13 City of Little Rock
Department of Neighborhoods and Planning
723 West Markham
Little Rock, Arkansas 72201-1334
(501) 371-4790
Name: Baptist Adolescent Transitional Ho.e
File No. Z-5805
Location: E. side Lile Ct., 350' N of Life
Tine of Issues: Dr.
RE:
Date February 14 1994
Planning
Zoning and
Subdivision
Arkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
Public Works Department - Engineering
Parks and Recreation Department
Neighborhoods & Planning - Site Plan Review
Graphics
TO WHOM IT MAY CONCERN:
On IIarc1i 22 , 19 94 , the Little Rock Planning
Commission will consider the above referenced subject.
Note: Interdepartmental Meeting held on ' P Ahruarr25-,
A copy of the Issue is enclosed for your consideration, and your
comments and/or recommendations will be greatly appreciated.
sincerely,
Depa tment of Neighborhoods and Planning
(Please respond below, and return this letter for our records.)
Approved as submitted
Easement required (see attached plat or description)
Comments:
By:
Enc osure
City of Little Rock
Department of Neighborhoods and Planning Planning
Zoning and
723 West Markham
Subdivision
Little Rock, Arkansas 72201-1334
(501) 371-4790
RE: Name: Baptist Adolescent TransitionaJHo e
File No. Z-5805
Location: E. side Lile Ct., 350' N oe
Tvne of Issues:
Date_Febr X 1 A 199A
Arkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
Public Works Department - Engineering
Parks and Recreation Department
Neighborhoods & Planning - Site Plan Review
Graphics
TO WHOM IT MAY CONCERN:
On March 22. , 19 9_r the Little Rock Planning
Commission will consider the above referenced subject.
Note: Interdepartmental Meeting held on • yeb-r„ary 25, 199 •
A copy of the Issue is enclosed for your consideration, and your
comments and/or recommendations will be greatly appreciated.
Sincerely,
/;J� Z,!--,
Depa tment of Neighborhoods and Planning
(Please respond below, and return this letter for our records.)
—Y -,,I/44 Approved as submitted
Easement required (see attached plat or description)
Comments:
By:
Enclosure
r
The
��E'Fl]l)E11'�C1-
F
Ar'chitect's Engir eers Surve!,%or,_
March- 9, 1994
Mr. Jim Boyd
Little Rock Wastewater Utility
221 East Capitol
Little Rock, AR 72202
Dear Jim,
Pursuant to our telephone conversation concerning the Baptist Tran-sitional Center
on the Baptist Medical Center campus at 9601 1-630 in Little Rock,_I have made
the following calculations:
1. Lot Acreage
2. Building Flows
2.21 ac
2000 gal. per day
This facility will be located on Lot 8, Lile Court, Pulaski County.
Please let me know if there are any changes involved.
Sincerely,
THE MEHLBURGER FIRM
Frank R. Riggins
Division Manager
FRR/slb
201 South Izard 0 P G). Box 3837 0 Little Rock, AR 72203-3837 o 501/375-5331
The
Melrilburger
Firm
Architects El Engineers cl Surveyors
February i5, 1994
Mr. Richard Wood
Department of Neighborhoods and Planning
723 West Markham
Little Flock, Arkansas 722101
Fie: Baptist Adolescent Transitional Facility
Baptist Medical Center Campus
Dear Richard,
Enclosed is the necessary criteria for submittal for Site Plan
Review.
The applicant desires to develop a 2.21 acre site into a facility
to house and treat adolescents enrolled in a program for
transitional living. The site has been final platted as Lot 5,
Baptist Medical Center Development.
The first phase of the project will consist of the construction
of two housing facilities and accompanying driveway and parking.
The structures will be one story masonry and frame type
construction of a residential character comprising appro;�imatel1
6032 sq. ft. A third building will be built as indicated on the
site plan in the second phase of the project.
The structures will cover approximately 12.5% of the site and the
paved area will occupy aprroximately 14.8% of the site.
There will be a total of 21 parking spaces with 2 spaces being
dedicated for handicap usage.
The site is currently wooded and the intent is to preserve as
much of the natural setting as possible. Clearing will only occur
to accommodate construction.
Stormwater run off will be retained on site in the form of a
detention storage pond.
201 South Izard 0 P.O. Box 3837 11 Little Rock, AR 72203-3837 0 50-1/375-5331-
There will also be a small playground area for the sole use of
this facility.
Please let me know if you have any questions concerning this
application.
Sinff/ere1y,
r nk: FiigIWanager
Development Division
SUBDIVISION
ITEM NO.
DATE
FILE NO.
NAME: ! i �r rhi `I !i�-��1�-r .r-.
LOCATION:��r(1fh15 �j(pp 1 �� (O�jD
DEVELOPER
NAME:
STREET ADDRESS 2(-pn f
H
CITY/STATE/ZIP Lia ,sem g2 7,
TELEPHONE NO.
ENGINEER
Tha �G� air �"rrm � Inc.
20 4 -z- 1 5?
AREA NUMBER OF LOTS ] FT. NEW STREET
ZONING PROPOSED USES 1ICaIII�kfJ Li �11�j�L�1(_'.l,I
PLANNING DISTRICT
CENSUS TRACT
VARIANCES REQUESTED
13 City of Little Rock
Department of Neighborhoods and Planning
723 West Markham
Little Rock, Arkansas 72201-1334
(501) 371-4790
April 18, 1994
Baptist Medical Center
96011-630
Little Rock, AR 72205
RE: BAPTIST ADOLESCENT TRANSITIONAL HOME -- SITE PLAN REVIEW
(Z-5804)
Gentlemen:
Attached is a copy of the March 22, 1994 Planning Commission minute record for the
BAPTIST ADOLESCENT TRANSITIONAL HOME SITE PLAN REVIEW. As the
minute record indicates, the site plan was approved. This copy is furnished for your
records.
If you have any questions regarding this matter, please call me at 371-6814.
Sincerely,
Bobby 2sims
Subdivision Administrator
cc: Mr. Frank Riggins
201 S. Izard St.
Little Rock, AR 72203
Planning
Zoning and
Subdivision
• �` as r cs. est -
\N DD' 19' 55' a
1 _ , --
iq 30' voCr
10 ease or l f" rooxD ,c, / /% l Las ert vere �oN 1 {
LO ex15T.
ro w AG.N' tVeJ I� / ` ` 51-E ArteA- '
r..s•N,L,rI � I
I
\ �� � > / vo • b " _ �y P.: } , , i � wwG .cls I �I
`• � / `/� Note sulL7tt 6 TiREe / • a To. // I
� � • � ) � ,ocessle:e �• � � � I 8
ro WE
'• e�yr. e;,e_.oe-s,c .td ,� �� 1 �"�� is � f /r /�F� � i
ro ee PRC'tRVO,
PN,SE 1 - BUILDING ONE MIO TWO
4 p ORN""s ut0 P/JIKING
�I ±� IIII PHASE 2 - BULLING THREE
p 1 3
Site Plan Review
TRS 1N,13W,3 ITEM NO.
Z-5804
PD BAPTIST ADOLESCENT N 19
CT TRANSITIONAL HOME
3/94
CITY OF LITTLE ROCK, ARKANSAS
DEPARTMENT OF NEIGHBORHOOD REVITALIZATION AND PLANNING
FILING FEES
4
NO.— DATE V�/ , 19
t
Annexation . . . . . . . . . . . . . . . . _ $
1
Board of Adjustment Application. $
a
Conditional Use Permit . . . . . . . . . . . $
EFinal Plat . . . . . . . . . . . . . . . . . $
Planned Unit Development . . . . . . . . . $
i Preliminary Plat . . . . . . .
Rezoning A $
t g PP lication
Site Plan (Multiple BuiA g/Zoning)'o.. . . $ 12
Special Use Permit
► Street, Alley, of Easement Cls��ki• $
Street Name Change . . . . . . . . . . . . . $
t
` Street Name Signs: # Signs at ea. $
TOTAL $
I z. Address:}r>.:r
P File No.: � - ���' l�
i Applicant: �`<< 1, �- yt�' By: r