HomeMy WebLinkAboutZ-5802-C Staff AnalysisMarch 30, 2000
ITEM NO.: 10 FILE NO.: Z -5802-C
NAME: Chenal Place Shopping Center - Revised Zoning Site Plan
(Lots 1 and 2)
LOCATION: West side of Chenal Parkway, just south of West
Markham Street
DEVELOPER:
F.Wr.TWV.VR
RP Partnership White-Daters and Associates
650 S. Shackleford, Ste. 320 401 Victory Street
Little Rock, AR 72211 Little Rock, AR 72201
AREA: 2.5 acres NUMBER OF LOTS: 4 FT. NEW STREET: 0
ZONING: C-2 ALLOWED USES: Commercial
PROPOSED USE: Commercial
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
On December 18, 1997, the Planning Commission approved a five
(5) lot preliminary plat for this property as well as a site
plan for the largest of the five lots.
On April 30, 1998, the Planning Commission approved a revised
preliminary plat and site plan for the property. The revised
preliminary plat reduced the number of lots from five (5) to
four (4), and the approved site plan included all four lots.
To date, Lots 3 and 4 have been developed according to the
approved plan. The approved plan allows the following for Lots
1 and 2:
Lot 1 - 6,400 square foot restaurant building, 64 parking spaces
Lot 2 - 6,000 square foot restaurant building, 82 parking spaces
March 30, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
A. PROPOSAL/REQUEST:
The applicant proposes to revise
and 2 of this development. The
type tenant he will get on these
the flexibility for a retail or
FILE NO.: Z -5802-C
the site plan for Lots 1
developer is unsure what
two parcels and would like
restaurant user.
Therefore, the developer is proposing a conceptual site
plan for the lots. The proposal includes a maximum
building area for Lots 1 and 2, which will conform to the
setbacks approved with the preliminary plat. The applicant
notes that the number of parking spaces will comply with
the minimum ordinance requirements based on the use of the
individual lot (restaurant and/or retail). It is also
noted that the landscape and buffer ordinances will be
complied with. The driveway locations shown on the site
plan for Lots 1 and 2 conform to the originally approved
site plan and plat. The applicant has also noted a ground -
mounted sign location for Lots 1 and 2. These signs must
conform to the Chenal/Financial Center Design Overlay
District.
B. EXISTING CONDITIONS:
Lots 3 and 4 of this subdivision are developed, with Lots 1
and 2 having been graded and prepared for building
construction. The Timber Ridge Subdivision is located to
the south with a GMC auto dealership to the north. There
is commercial and industrial property across Chenal Parkway
to the east and office zoned property to the west across
Atkins Street.
There is a 75 foot wide OS Open Space strip along the south
property line, adjacent to the Timber Ridge Subdivision.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received no comment from the
neighborhood. The Gibralter Heights/Point West/Timber
Ridge and Parkway Place Neighborhood Associations were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
Provide easement for existing sidewalk along Chenal Parkway,
which is currently on private property.
2
March 30, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z -5802-C
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
AP&L: No Comment.
Arkla: No Comment received.
Southwestern Bell: No Comment received.
Water: No Comment.
Fire Department: An extra fire hydrant may be required.
Contact Dennis Free at 918-3752 for details.
County Planning: No Comment received.
CATA: No Comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No Comment.
Landscape Issues: Areas set aside for buffers and
landscaping meet with ordinance requirements.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
March 14, 2000. The revised plan is a conceptual plan for
Lots 1 and 2 as suggested by staff and -the Subdivision
Committee. The conceptual plan provides for a maximum
building area of 9,870 square feet for Lot 1 and 13,029
square feet for Lot 2, which will comply with the
previously approved minimum setbacks. The conceptual plan
also notes the following:
1. Parking for Lots 1 and 2 will conform to the minimum
ordinance equipment based on the use(s) of the
individual lot.
2. Lots 1 and 2 will conform to the City's Landscape and
Buffer Ordinances.
3. Maximum building height for Lots 1 and 2 will be 35
feet. This conforms to ordinance standards (building
height of 45 feet allowed in C-2).
3
March 30, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z -5802-C
4. Ground -mounted sign locations and driveway locations
for Lots 1 and 2. The driveway locations were approved
with the previous site plan and plat.
The applicant submitted a letter to staff on April 27, 1998
which offered additional conditions of development of this
property and which was made part of the previously approved
site plan. Staff feels that these conditions should
continue to apply to development of Lots 1 and 2. The
conditions that apply are as follows:
1. Installation of an eight (8) foot high wood
privacy fence along the boundary between the OS
Buffer and the shopping center, except for the
east sixty (60) feet of this boundary nearest
Chenal Parkway where the fence will be six (6)
feet high.
2. Planting twice the number of evergreens (holly or
juniper) as required by the Landscape Ordinance
along the entire length of the privacy fence.
3. Installing only the downward -facing "box" type
parking lot light fixtures, with a maximum height
of 28 feet.
4. Restrict dumpster pick-ups to the hours of
7:00 a.m. to 7:00 p.m.
5. Restrict any tenant in the center from installing
any external speakers. This restriction will not
apply to a drive-thru order speaker for a
restaurant use on an out -lot.
6. Prohibiting the following uses in the center:
a. Ambulance service post
b. Auto glass or muffler shop
C. Bar, lounge or tavern (except as part of a
restaurant)
d. Adult bookstore or adult video store
e. Pawn shop
f. Plumbing electrical, air conditioning or
heating shop
g. Recycling facility, automated
4
March 30, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.)
FILE NO.: Z -5802-C
The proposed site is located within the Chenal/Financial
Center Design Overlay District. Signage, site lighting and
utilities must conform to the following DOD requirements:
1. Ground -mounted signs must be "monument" type with a
maximum height of 8 feet and a maximum area of 100
square feet.
2. Parking lot lighting must be directed to the parking
areas and not reflected to adjacent property.
3. No overhead utilities shall be constructed within 100
feet of the Chenal Parkway right-of-way.
4. All lighting and utilities in front of the rear line of
the building must be underground.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with the proposed conceptual site plan
for Lots 1 and 2. The conceptual plan for those lots as
proposed will conform to all aspects of the City's Zoning
Ordinance and the previously approved preliminary plat of
the property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the conceptual site plan for
Lots 1 and 2 subject to the following conditions:
1. Compliance with the requirements as noted in paragraphs D
and E of this report.
2. Signage, site lighting and utilities must conform with
the Chenal/Financial Center Design Overlay District as
noted in paragraph G.
3. Compliance with the conceptual site development criteria
as outlined in paragraph G.
4. Compliance with the additional conditions as offered by
the applicant in an April 27, 1998 letter and required
with the previously approved site plan.
SUBDIVISION COMMITTEE COMMENT:
(MARCH 9, 2000)
Joe White, C. J. Cropper and Beck Kyzer were present,
representing the application. Staff gave a brief description of
the revised site plan.
61
March 30, 2000
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z -5802-C
Mr. White explained that the applicant wished to have the
revised site plan approved (Lots 1 and 2) and have the
flexibility to utilize the previously approved site plan for
these lots if needed.
Staff noted that a better alternative would be to propose a
conceptual plan for Lots 1 and 2 that would conform to all
ordinance standards and allow the applicant flexibility in site
design based on future property owners or tenants. Staff noted
that the following items needed to be included within the
conceptual plan:
1.Show the minimum setbacks for Lots 1 and 2 as previously
approved with the plat of the property.
2.Note a maximum building area (square footage) for each lot.
3.Note that the minimum number of parking spaces for each lot
will conform to ordinance standards based on the use of the
property.
4.Show driveway locations for Lots 1 and 2 as previously
approved with the plat of the property.
5.Note that the City's Landscape and Buffer Ordinances will be
complied with.
6. Show ground -mounted sign locations and note that the signs
will conform with the Chenal Parkway/Financial Center Design
Overlay District standards.
7. Note that site lighting and utilities will conform to the DOD
standards.
The Committee members indicated endorsement of the conceptual
plan for Lots 1 and 2. After the discussion, the Committee
forwarded the revised site plan to the full Commission for final
action.
PLANNING COMMISSION ACTION:
(MARCH 30, 2000)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairperson place the item before the Commission for
inclusion within the consent Agenda for approval as recommended
by staff. A motion to that effect was made. The motion passed
by a vote of 9 ayes, 0 nays and 2 absent.
6