Loading...
HomeMy WebLinkAboutZ-5788 Staff AnalysisFebruary 8, 1994 ITEM NO.: 6 FILE NO.: Z-5788 NAME: CHENAL VALLEY APARTMENTS -- SITE PLAN REVIEW LOCATION: On the north side of Chenal Parkway approximately 1/4 mile west of Pride Valley Road DEVELOPER: ARCHITECT: SIDNEY SALESON DON JOHNSON Area Companies, Inc. Brooks Jackson + Don Johnson #49 Sherwood Terrace, Suite Y Architects, Inc. Lake Bluff, IL 60044-2231 2228 Cottendale Lane (708) 234-0008 664-8700 AREA: 11.667 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0 ZONING: MF -18 PROPOSED USES: Apartments PLANNING DISTRICT: 19 CENSUS TRACT: 42.06 VARIANCES REQUESTED: None STATEMENT OF PROPOSAL: The applicant proposes the development of an apartment complex on a 11.667 acres site entailing the construction of 116 apartment units in 13 two and three story buildings, with 262 on-site parking spaces. The development also involves the construction of a building to house the complex' office, a swimming pool, and a tennis court facility. The construction of the full width of the new boundary street, Venture Drive, is proposed, with a sidewalk along this frontage, with access being taken from Venture Drive. Improvements to the existing boundary street, Chenal Parkway, are proposed to include the construction of the additional lane required by the Master Street Plan and the sidewalk. A. PROPOSAL RE VEST: The Planning Commission is requested to approve the site development plan for an apartment complex involving the construction of 13 two and three story buildings with 116 apartment units on an 11.667 acre site, plus parking facilities for 262 vehicles, a building to house the complex' office, a tennis court and a swimming pool. The applicant seeks approval of a plan which anticipates construction of the full width of Venture Drive, with access to the complex being taken from this new street, and construction of the sidewalk along the Venture Drive February 8, 1994 ITEM NO • 6 (Continued) FILE NO.: z-5788 frontage of the site. Improvements to Chenal Parkway are planned to include construction of the additional lane required by the Master Street Plan and the sidewalk along the street frontage. No waivers or variances are requested. B. EXISTING CONDITIQNS: The site is currently undeveloped and heavily wooded. The terrain is hilly, with a grade differential across the site of approximately 26 feet. It is bounded on the east by the undeveloped western limits of Parkway Village; on the north by undeveloped MF -6 area which is, however, in line with the developing St. Michael subdivision; on the west by undeveloped 0-3 area; and on the south by undeveloped C-2 area and Chenal Blvd. The site is part of the Chenal Commercial Park subdivision which was approved by the Commission in March of 1993. (The 0-3 area to the west and the C-2 area to the south of the site are in this subdivision.) The existing zoning of the site is MF -18. C. ENGINEERING/UTILITY COMMENTS: The City Engineering office indicates that the Chenal Parkway -Venture Drive intersection must be constructed in conformance with the Master Street Plan standards. An additional lane will be required to be constructed on Chenal Parkway. Venture Drive must be constructed to collector street standards, including the construction of the required sidewalk on the north side of the street. (The required sidewalk on the south side of Venture Drive can be deferred until the lot on the south side of the street is developed.) The Stormwater Detention and Excavation Ordinances will apply to this development. The applicant needs to contact the state for the NPDES permit. Water Works reports that on-site fire protection will be required. Water Works advises that care must be taken to protect the raw water facilities that cross the site. Plans for work in the raw water line easement area must be approved by Water Works; maximum and/or minimum cover requirements may be specified. Wastewater Utility reports that a sewer main extension, with easements, will be required. ARKLA Gas Co. approved the site plan without comment. Southwestern Bell Telephone Co. will require easements. The Fire Department indicated that all entrance driveways need to be a minimum width of 20 feet. February 8, 1994 ITEM NO.: 6 (Continuedl FILE NO • Z-5788 Neighborhoods and Planning Site Plan review reports that a 6 foot high opaque "good neighbor" wooden fence or dense vegetation is required along the eastern perimeter to screen the business activity of the site from the residential property to the east. The full buffer requirement along this side is 40 feet, with a 27 foot minimum with tradeoffs. The site design will be required to conform to these standards. D. ISSUES/LEGAL/TECHNICAL/DESIGN: The zoning ordinance requires site plan review whenever a development involves multiple buildings on the site, thus the request for review of this item. There are no issues remaining to be resolved. E. ANALYSIS• The development is on a site which is appropriately zoned. There are no deficiencies noted by the utilities or City staff. No waivers or variances are requested. F. STAFF RECOMMENDATIONS: Staff recommends approval of the request. SUBDIVISION COMMITTEE COMMENT: (JANUARY 20, 1994) Mr. Pat McGetrick, the engineer on the project, was present. Staff presented the request and Mr. McGetrick reviewed the plan with the Committee members. The Committee reviewed the discussion outline comments with Mr. McGetrick, and Mr. McGetrick indicated that the deficiencies would be corrected. After only minimal discussion, the Committee forwarded the request to the Commission for final resolution. PLANNING COMMISSION ACTION: (FEBRUARY 8, 1994) Staff reported that there were no outstanding issues to be resolved, and recommended approval of the request. The item was included in the Consent Agenda, and was approved with the vote of 9 ayes, no nays, one open position, no abstentions, and one open position. 3