Loading...
HomeMy WebLinkAboutZ-5781-A Map 19MASTER PLANT LIST QTY COMMON NAME BOTANICAL NAME SIZE 12 GUAGE WIRES TurfSolid 4,520 Sq Yds Meyer's Z-52 Zoysia Sod Zoysia japonica 'Meyer's Z-52' sod free of weeds, debris and other grasses Shrubs NOTE: ALTERNATIVE METHODS Ilex crenata 'Compacta' 5 1 24"-30"ht x 24" spr min ' 97 Compacta Holly Ilex cornuta 'Needlepoint' 7 gal. 30"-36" ht x 30" spr min 6 Needlepoint Holly Ilex crenata 'Soft Touch' 3 al. 18"-24" ht x 18" spr min g 6 Soft Touch Holly Loro etalum chinensis 'Suzanne' p 3 gal. 18"-24" ht x 18" spr min 14 'Suzanne' Loropetalum Buxus microphylla 'Wintergreen' B&B 30"-36" ht x 30" apr min 2 Wintergreen Boxwood CONSTRUCT EARTH SAUCER Triees. Autumn Blaze Red Maple Acer freemanii 'Autumn Blaze' B&B 12'-14' min. ht., 2"-2 1/2" min cal. 10 Crape Myrtle Lagerstroemia indica B&B 10'- 12' min. ht., min. spr., 3 or more canes 1" min.. cal. each cane 6 'Natchez White' 'Natchez White' B&B 12'-14' min. ht., 2"-2 1/2" min cal. 8 Water Oak Quercus nigra 3" DEPTH MULCH CONTRACTOLSOD, SEED, R SHOULD VERS ARE APPROXIMATE ONLY. VERIFY EXACT QUANTITIES PRIOR TO BIDDING. Mi CHAMFER EDGING TURF WALK OR CURB NOT TO SCALE PLANTING I 'SUPER SOIL' OR APP MIN. 3" ML TYPICAL SHRUB PLANT: SECTION - PARKING LOT PLANTING DETAIL NOT TO SCALE GUYING STAKE GALVANIZED WIRE 1200 �} r ROOT BALL y ' MULCHED TREE WELL PLAN TREE STAKING DETAIL ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING UTILITIES CAN BE LOCATED. ADJOINING PLANTING BED 3/16"x4" GREEN STEEL EDGING 7P�1�� NOT TO SCALE FINISH GRADE OF ADJACENT LAWN 1" 16" TAPERED STEEL STAKE & 30" OC MAX. PROVIDE 8-8-8 FERTILIZER AT 4 LBS. _ PER 100 SQ. FT. SEE SPECS FOR INSTALLATION 3 DEPTH MULCH (SEE SPECIFICATIONS) GROUND LINE TO BE THE SAME AS AT NURSERY MIN 18" FOR PLANTS UP TO 4'0" HIGH BREAK SUB -SOIL WITH PICK AXE CAPE NOTES 1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS. 2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION. 3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY OR UTILITIES INCURRED DURING INSTALLATION. 4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 5) ACTUAL DIMENSIONS MAY VARY ON SITE. 6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE. 7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS. TOPSOIL SHALL MATTER. TOPSOIL OSHALL BE FREE OFNSIST OF CLEAN, DWEEDS, ROOTS, TONES AND OTHER FARK HUMUS RICH SOIL WITH OREIGN QUANTITIES MATERIALS F ORGANIC 8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS. 9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES. 10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT. 11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT. 12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER OF PLANTING BEDS. PLANTING SOIL REQUIREMENTS: PROVIDE HOMOGENOUS BACKFILL PLANTING MIXTURE OF 3:1 RATIO TOPSOIL OF SPECIFIED QUALITY AND PEAT MOSS. REMOVE TOP 1/3 OF BURLAP FROM ROOTBALL WHEN PRESENT 2 -PLY REINFORCED — RUBBER HOSE WRAP TREES — (IF REQUIRED) CONSTRUCT EARTH SAUCER WITH 2" HIGH MULCHED BERM.— FLOOD TWICE WITH WATER IN FIRST 24 HOURS 3 DEPTH MULCH (SEE SPECIFICATIONS) MIN. 9" LAYER OF PLANTING SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO SETTLE PRIOR TO PLANTING - BREAK SUB -SOIL WITH PICK AXE. (3) DOUBLE STRAND GALV. 12 GUAGE WIRES PER TREE TO BE IN GROUND FOR 1 YEAR NOTE: ALTERNATIVE METHODS OF GUYING MAY BE SUBMITTED FOR REVIEW AND POSSIBLE APPROVAL. REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. PLANTING MEDIUM TO BE 'SUPER SOIL' OR APPROVED OTHER GROUND LINE TO BE THE SAME AS THE NURSERY — METAL STAKE NOTE: PROVIDE FERTILOME ROOT STIMULATOR AS PER MANUFACTURE'S RECOMMENDATIONS Seal Date 9/12/06 Revisions L AN D 5 G A FE A R C H I T E G T 5 ROSERT5 4 WILLIAM5 A550CIATE5 1501 N. UNIVER5ITY SUITE 430 LITTLEROOK,AR 72207 (50 1) 280_0123 NOTES AND DETAILS I SHEET L2 DOUBLE STRAND GALV. 12 GUAGE WIRES TO BE IN GROUND FOR 1 YEAR NOTE: ALTERNATIVE METHODS 2 REINFORCED F GUYING YD E SUBMITTED FOR -PLY RUBBER HOSE ON REVIEW EACH MAJOR TRUNK APPROVAL. REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. CONSTRUCT EARTH SAUCER WITH 2 HIGH MULCHED BERM. FLOOD TWICE WITH WATER IN FIRST 24 HOURS ., .>•;, PLANTING MEDIUM TO BE 'SUPER SOIL' OR APPROVED OTHER e F - GROUND LINE TO BE THE SAME 3" DEPTH MULCH ' s c AS THE NURSERY (SEE SPECIFICATIONS) it I! _ „ 12 � METAL STAKE MIN. 9" LAYER OF PLANTING �'�� MIN �. SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO ;i£ k L_ - NOTE: PROVIDE FERTILOME SETTLE PRIOR TO PLANTING - `t ROOT STIMULATOR AS PER BREAK SUB -SOIL WITH PICK AXE. `°' MANUFACTURE'S RECOMMENDATIONS GUYING STAKE GALVANIZED WIRE 1200 �} r ROOT BALL y ' MULCHED TREE WELL PLAN TREE STAKING DETAIL ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING UTILITIES CAN BE LOCATED. ADJOINING PLANTING BED 3/16"x4" GREEN STEEL EDGING 7P�1�� NOT TO SCALE FINISH GRADE OF ADJACENT LAWN 1" 16" TAPERED STEEL STAKE & 30" OC MAX. PROVIDE 8-8-8 FERTILIZER AT 4 LBS. _ PER 100 SQ. FT. SEE SPECS FOR INSTALLATION 3 DEPTH MULCH (SEE SPECIFICATIONS) GROUND LINE TO BE THE SAME AS AT NURSERY MIN 18" FOR PLANTS UP TO 4'0" HIGH BREAK SUB -SOIL WITH PICK AXE CAPE NOTES 1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS. 2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION. 3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY OR UTILITIES INCURRED DURING INSTALLATION. 4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 5) ACTUAL DIMENSIONS MAY VARY ON SITE. 6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE. 7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS. TOPSOIL SHALL MATTER. TOPSOIL OSHALL BE FREE OFNSIST OF CLEAN, DWEEDS, ROOTS, TONES AND OTHER FARK HUMUS RICH SOIL WITH OREIGN QUANTITIES MATERIALS F ORGANIC 8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS. 9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES. 10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT. 11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT. 12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER OF PLANTING BEDS. PLANTING SOIL REQUIREMENTS: PROVIDE HOMOGENOUS BACKFILL PLANTING MIXTURE OF 3:1 RATIO TOPSOIL OF SPECIFIED QUALITY AND PEAT MOSS. REMOVE TOP 1/3 OF BURLAP FROM ROOTBALL WHEN PRESENT 2 -PLY REINFORCED — RUBBER HOSE WRAP TREES — (IF REQUIRED) CONSTRUCT EARTH SAUCER WITH 2" HIGH MULCHED BERM.— FLOOD TWICE WITH WATER IN FIRST 24 HOURS 3 DEPTH MULCH (SEE SPECIFICATIONS) MIN. 9" LAYER OF PLANTING SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO SETTLE PRIOR TO PLANTING - BREAK SUB -SOIL WITH PICK AXE. (3) DOUBLE STRAND GALV. 12 GUAGE WIRES PER TREE TO BE IN GROUND FOR 1 YEAR NOTE: ALTERNATIVE METHODS OF GUYING MAY BE SUBMITTED FOR REVIEW AND POSSIBLE APPROVAL. REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. PLANTING MEDIUM TO BE 'SUPER SOIL' OR APPROVED OTHER GROUND LINE TO BE THE SAME AS THE NURSERY — METAL STAKE NOTE: PROVIDE FERTILOME ROOT STIMULATOR AS PER MANUFACTURE'S RECOMMENDATIONS Seal Date 9/12/06 Revisions L AN D 5 G A FE A R C H I T E G T 5 ROSERT5 4 WILLIAM5 A550CIATE5 1501 N. UNIVER5ITY SUITE 430 LITTLEROOK,AR 72207 (50 1) 280_0123 NOTES AND DETAILS I SHEET L2