HomeMy WebLinkAboutZ-5781-A Map 19MASTER PLANT LIST
QTY
COMMON NAME
BOTANICAL NAME
SIZE
12 GUAGE WIRES
TurfSolid
4,520 Sq Yds
Meyer's Z-52 Zoysia Sod
Zoysia japonica 'Meyer's Z-52'
sod free of weeds,
debris and other grasses
Shrubs
NOTE: ALTERNATIVE METHODS
Ilex crenata 'Compacta'
5 1 24"-30"ht x 24" spr min
'
97
Compacta Holly
Ilex cornuta 'Needlepoint'
7 gal. 30"-36" ht x 30" spr min
6
Needlepoint Holly
Ilex crenata 'Soft Touch'
3 al. 18"-24" ht x 18" spr min
g
6
Soft Touch Holly
Loro etalum chinensis 'Suzanne'
p
3 gal. 18"-24" ht x 18" spr min
14
'Suzanne' Loropetalum
Buxus microphylla 'Wintergreen'
B&B 30"-36" ht x 30" apr min
2
Wintergreen Boxwood
CONSTRUCT EARTH SAUCER
Triees.
Autumn Blaze Red Maple
Acer freemanii 'Autumn Blaze'
B&B 12'-14' min. ht., 2"-2 1/2" min cal.
10
Crape Myrtle
Lagerstroemia indica
B&B 10'- 12' min. ht., min. spr.,
3 or more canes 1" min.. cal. each cane
6
'Natchez White'
'Natchez White'
B&B 12'-14' min. ht., 2"-2 1/2" min cal.
8
Water Oak
Quercus nigra
3" DEPTH MULCH
CONTRACTOLSOD, SEED, R SHOULD VERS ARE APPROXIMATE ONLY.
VERIFY EXACT QUANTITIES PRIOR TO BIDDING.
Mi
CHAMFER EDGING
TURF
WALK OR CURB
NOT TO SCALE
PLANTING I
'SUPER SOIL' OR APP
MIN. 3" ML
TYPICAL SHRUB PLANT:
SECTION - PARKING LOT PLANTING DETAIL
NOT TO SCALE
GUYING STAKE
GALVANIZED WIRE
1200
�} r
ROOT BALL
y ' MULCHED TREE WELL
PLAN
TREE STAKING DETAIL
ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR
IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE
WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE
PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR
MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL
SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING
DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING
UTILITIES CAN BE LOCATED.
ADJOINING PLANTING BED
3/16"x4" GREEN
STEEL EDGING
7P�1��
NOT TO SCALE
FINISH GRADE
OF ADJACENT LAWN
1"
16" TAPERED
STEEL STAKE
& 30" OC MAX.
PROVIDE 8-8-8
FERTILIZER AT 4 LBS. _
PER 100 SQ. FT.
SEE SPECS FOR
INSTALLATION
3 DEPTH MULCH
(SEE SPECIFICATIONS)
GROUND LINE TO BE THE
SAME AS AT NURSERY
MIN 18" FOR PLANTS
UP TO 4'0" HIGH
BREAK SUB -SOIL WITH
PICK AXE
CAPE NOTES
1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND
STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS.
2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED
DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION.
3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY
OR UTILITIES INCURRED DURING INSTALLATION.
4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR
NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN.
5) ACTUAL DIMENSIONS MAY VARY ON SITE.
6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE.
7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS.
TOPSOIL SHALL MATTER. TOPSOIL OSHALL BE FREE OFNSIST OF CLEAN, DWEEDS, ROOTS, TONES AND OTHER FARK HUMUS RICH SOIL WITH OREIGN QUANTITIES
MATERIALS F ORGANIC
8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS.
9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES.
10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR
ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT.
11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT.
12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER
OF PLANTING BEDS.
PLANTING SOIL REQUIREMENTS:
PROVIDE HOMOGENOUS BACKFILL
PLANTING MIXTURE OF 3:1 RATIO
TOPSOIL OF SPECIFIED QUALITY
AND PEAT MOSS.
REMOVE TOP 1/3
OF BURLAP FROM
ROOTBALL WHEN
PRESENT
2 -PLY REINFORCED —
RUBBER HOSE
WRAP TREES —
(IF REQUIRED)
CONSTRUCT EARTH SAUCER
WITH 2" HIGH MULCHED BERM.—
FLOOD TWICE WITH WATER
IN FIRST 24 HOURS
3 DEPTH MULCH
(SEE SPECIFICATIONS)
MIN. 9" LAYER OF PLANTING
SOIL MIXTURE - FILL PIT WITH
WATER AND ALLOW LAYER TO
SETTLE PRIOR TO PLANTING -
BREAK SUB -SOIL WITH PICK AXE.
(3) DOUBLE STRAND GALV.
12 GUAGE WIRES PER TREE
TO BE IN GROUND FOR 1 YEAR
NOTE: ALTERNATIVE METHODS
OF GUYING MAY BE SUBMITTED
FOR REVIEW AND POSSIBLE
APPROVAL.
REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL.
PLANTING MEDIUM TO BE
'SUPER SOIL' OR APPROVED OTHER
GROUND LINE TO BE THE SAME
AS THE NURSERY
— METAL STAKE
NOTE: PROVIDE FERTILOME
ROOT STIMULATOR AS PER
MANUFACTURE'S
RECOMMENDATIONS
Seal
Date
9/12/06
Revisions
L AN D 5 G A FE
A R C H I T E G T 5
ROSERT5 4
WILLIAM5
A550CIATE5
1501 N. UNIVER5ITY SUITE 430
LITTLEROOK,AR 72207
(50 1) 280_0123
NOTES AND DETAILS I SHEET L2
DOUBLE STRAND GALV.
12 GUAGE WIRES
TO BE IN GROUND FOR 1 YEAR
NOTE: ALTERNATIVE METHODS
2 REINFORCED
F GUYING YD E SUBMITTED
FOR
-PLY
RUBBER HOSE ON
REVIEW
EACH MAJOR TRUNK
APPROVAL.
REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL.
CONSTRUCT EARTH SAUCER
WITH 2 HIGH MULCHED BERM.
FLOOD TWICE WITH WATER
IN FIRST 24 HOURS
., .>•;,
PLANTING MEDIUM TO BE
'SUPER SOIL' OR APPROVED OTHER
e
F -
GROUND LINE TO BE THE SAME
3" DEPTH MULCH
' s c
AS THE NURSERY
(SEE SPECIFICATIONS)
it I! _ „ 12 �
METAL STAKE
MIN. 9" LAYER OF PLANTING
�'�� MIN �.
SOIL MIXTURE - FILL PIT WITH
WATER AND ALLOW LAYER TO
;i£ k L_ -
NOTE: PROVIDE FERTILOME
SETTLE PRIOR TO PLANTING -
`t
ROOT STIMULATOR AS PER
BREAK SUB -SOIL WITH PICK AXE.
`°'
MANUFACTURE'S
RECOMMENDATIONS
GUYING STAKE
GALVANIZED WIRE
1200
�} r
ROOT BALL
y ' MULCHED TREE WELL
PLAN
TREE STAKING DETAIL
ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR
IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE
WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE
PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR
MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL
SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING
DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING
UTILITIES CAN BE LOCATED.
ADJOINING PLANTING BED
3/16"x4" GREEN
STEEL EDGING
7P�1��
NOT TO SCALE
FINISH GRADE
OF ADJACENT LAWN
1"
16" TAPERED
STEEL STAKE
& 30" OC MAX.
PROVIDE 8-8-8
FERTILIZER AT 4 LBS. _
PER 100 SQ. FT.
SEE SPECS FOR
INSTALLATION
3 DEPTH MULCH
(SEE SPECIFICATIONS)
GROUND LINE TO BE THE
SAME AS AT NURSERY
MIN 18" FOR PLANTS
UP TO 4'0" HIGH
BREAK SUB -SOIL WITH
PICK AXE
CAPE NOTES
1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND
STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS.
2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED
DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION.
3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY
OR UTILITIES INCURRED DURING INSTALLATION.
4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR
NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN.
5) ACTUAL DIMENSIONS MAY VARY ON SITE.
6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE.
7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS.
TOPSOIL SHALL MATTER. TOPSOIL OSHALL BE FREE OFNSIST OF CLEAN, DWEEDS, ROOTS, TONES AND OTHER FARK HUMUS RICH SOIL WITH OREIGN QUANTITIES
MATERIALS F ORGANIC
8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS.
9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES.
10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR
ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT.
11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT.
12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER
OF PLANTING BEDS.
PLANTING SOIL REQUIREMENTS:
PROVIDE HOMOGENOUS BACKFILL
PLANTING MIXTURE OF 3:1 RATIO
TOPSOIL OF SPECIFIED QUALITY
AND PEAT MOSS.
REMOVE TOP 1/3
OF BURLAP FROM
ROOTBALL WHEN
PRESENT
2 -PLY REINFORCED —
RUBBER HOSE
WRAP TREES —
(IF REQUIRED)
CONSTRUCT EARTH SAUCER
WITH 2" HIGH MULCHED BERM.—
FLOOD TWICE WITH WATER
IN FIRST 24 HOURS
3 DEPTH MULCH
(SEE SPECIFICATIONS)
MIN. 9" LAYER OF PLANTING
SOIL MIXTURE - FILL PIT WITH
WATER AND ALLOW LAYER TO
SETTLE PRIOR TO PLANTING -
BREAK SUB -SOIL WITH PICK AXE.
(3) DOUBLE STRAND GALV.
12 GUAGE WIRES PER TREE
TO BE IN GROUND FOR 1 YEAR
NOTE: ALTERNATIVE METHODS
OF GUYING MAY BE SUBMITTED
FOR REVIEW AND POSSIBLE
APPROVAL.
REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL.
PLANTING MEDIUM TO BE
'SUPER SOIL' OR APPROVED OTHER
GROUND LINE TO BE THE SAME
AS THE NURSERY
— METAL STAKE
NOTE: PROVIDE FERTILOME
ROOT STIMULATOR AS PER
MANUFACTURE'S
RECOMMENDATIONS
Seal
Date
9/12/06
Revisions
L AN D 5 G A FE
A R C H I T E G T 5
ROSERT5 4
WILLIAM5
A550CIATE5
1501 N. UNIVER5ITY SUITE 430
LITTLEROOK,AR 72207
(50 1) 280_0123
NOTES AND DETAILS I SHEET L2