HomeMy WebLinkAboutZ-5781-A Map 10MASTER PLANT LIST
QTY
COMMON NAME
BOTANICAL NAME
SIZE
TStrf
4,520 Sq Yds
Meyer's Z-52 Zoysia Sod
Zoysia japonica 'Meyer's Z-52'
Solid sod free of weeds,
debris and other grasses
97
Compacta Holly
Ilex crenata 'Compacta'
5 gal. 24"-30"ht x 24" spr min
6
Needlepoint Holly
Ilex cornuta 'Needlepoint'
7 gal. 30"-36" ht x 30" spr min
6
Soft Touch Holly
Ilex crenata 'Soft Touch'
3 gal. 18"-24" ht x 18" spr min
14
'Suzanne' Loropetalum
Loropetalum chinensis 'Suzanne'
3 gal. 18"-24" ht x 18" spr min
2
Wintergreen Boxwood
Buxus microphylla 'Wintergreen'
B&B 30"-36" ht x 30" spr min
Treem
10
Autumn Blaze Red Maple
Acer freemanii 'Autumn Blaze'
B&B 12'-14' min, ht., 2"-2 1/2" min cal.
6
Crape Myrtle
Lagerstroemia indica
B&B 10'- 12' min. ht., 5'-6' min. spr.,
'Natchez White'
'Natchez White'
3 or more canes 1" min. cal. each cane
8
Water Oak
Quercus nigra
B&B 12'-14' min. ht., 2"-2 1/2" min cal.
* NOTE: ALL SOD, SEED, GROUNDCOVER, SHRUB
AND TREE QUANTITIES ARE APPROXIMATE ONLY.
CONTRACTOR SHOULD VERIFY EXACT QUANTITIES PRIOR TO BIDDING.
2 -PLY REINFORCED
RUBBER HOSE ON
EACH MAJOR TRUNK
CONSTRUCT EARTH SAUCER
WITH 2" HIGH MULCHED BERM.
FLOOD TWICE WITH WATER
IN FIRST 24 HOURS
3" DEPTH MULCH
(SEE SPECIFICATIONS)
MIN. 9" LAYER OF PLANTING
SOIL MIXTURE - FILL PIT WITH
WATER AND ALLOW LAYER TO
SETTLE PRIOR TO PLANTING -
BREAK SUB -SOIL WITH PICK AXE.
CHAMFER EDGING
— TURF
WALK OR CURB
Vila. a ' • :r4
L2 J NOT TO SCALE
PLANTING
'SUPER SOIL' OR AP]
MIN. 3" M1
TYPICAL SHRUB PLANT
^-Y/ 1V111V.
SECTION - PARKING LOT PLANTING DETAIL
NOT TO SCALE
DOUBLE STRAND GALV.
12 GUAGE WIRES
TO BE IN GROUND FOR 1 YEAR
NOTE: ALTERNATIVE METHODS
OF GUYING MAY BE SUBMITTED
FOR REVIEW AND POSSIBLE
APPROVAL.
REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL.
PLANTING MEDIUM TO BE
'SUPER SOIL' OR APPROVED OTHER
GROUND LINE TO BE THE SAME
AS THE NURSERY
-METAL STAKE
NOTE: PROVIDE FERTILOME
ROOT STIMULATOR AS PER
MANUFACTURE'S
RECOMMENDATIONS
- GUYING STAKE
�— GALVANIZED WIRE
120' •��
ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR
IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE
WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE
PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR
MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL
SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING
DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING
UTILITIES CAN BE LOCATED.
ADJOINING PLANTING BED
3/16"x4" GREEN
STEEL EDGING
FINISH GRADE
OF ADJACENT LAWN
1"
16" TAPERED
STEEL STAKE
C 30" OC MAX.
r SECTION - STEEL EDGING
1,21 NOT TO SCALE
ROOT BALL
�; • . !r �' MULCHED TREE WELL
PLAN
TREE STAKING DETAIL
PROVIDE 8-8-8
FERTILIZER AT 4 LBS.
PER 100 SQ. FT.
SEE SPECS FOR
INSTALLATION
3" DEPTH MULCH
(SEE SPECIFICATIONS)
GROUND LINE TO BE THE
SAME AS AT NURSERY
MIN 18" FOR PLANTS
UP TO 4'0" HIGH
BREAK SUB -SOIL WITH
PICK AXE
CAPE NOTES
1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND
STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS.
2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED
DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION.
3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY
OR UTILITIES INCURRED DURING INSTALLATION.
4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR
NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN.
5) ACTUAL DIMENSIONS MAY VARY ON SITE.
6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE.
7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS.
TOPSOIL SHALL CONSIST OF CLEAN, DARK HUMUS RICH SOIL WITH APPROPRIATE QUANTITIES OF ORGANIC
MATTER. TOPSOIL SHALL BE FREE OF WEEDS, ROOTS, STONES AND OTHER FOREIGN MATERIALS.
8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS.
9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES.
10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR
ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT.
11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT.
12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER
OF PLANTING BEDS.
PLANTING SOIL REQUIREMENTS:
PROVIDE HOMOGENOUS BACKFILL
PLANTING MIXTURE OF 3:1 RATIO
TOPSOIL OF SPECIFIED QUALITY
AND PEAT MOSS.
REMOVE TOP 1/3
OF BURLAP FROM
ROOTBALL WHEN
PRESENT
2 -PLY REINFORCED –
RUBBER HOSE
WRAP TREES —
(IF REQUIRED)
CONSTRUCT EARTH SAUCER
WITH 2" HIGH MULCHED BERM.—
FLOOD TWICE WITH WATER
IN FIRST 24 HOURS
3" DEPTH MULCH
(SEE SPECIFICATIONS)
MIN. 9" LAYER OF PLANTING
SOIL MIXTURE - FILL PIT WITH
WATER AND ALLOW LAYER TO
SETTLE PRIOR TO PLANTING -
BREAK SUB -SOIL WITH PICK AXE.
0JZ V 1 11JiN -
NOT TO SCALE
(3) DOUBLE STRAND GALV.
12 GUAGE WIRES PER TREE
TO BE IN GROUND FOR 1 YEAR
NOTE: ALTERNATIVE METHODS
OF GUYING MAY BE SUBMITTED
FOR REVIEW AND POSSIBLE
APPROVAL.
REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL.
_PLANTING MEDIUM TO BE
'SUPER SOIL' OR APPROVED OTHER
GROUND LINE TO BE THE SAME
AS THE NURSERY
METAL STAKE
NOTE: PROVIDE FERTILOME
ROOT STIMULATOR AS PER
MANUFACTURE'S
RECOMMENDATIONS
NOTES AND DETAILS
Seal
Drawing Type
NOTES &
DETAILS
Project No.
Date
9/12/06
Revisions
L A N D 5 G A P E
A R G H I T E G T 5
ROBERT5 4
NILLIAMS
A55001 AT E5
1501 N. LJNIVER5ITY SUITE 430
LITTLE ROCK, AR '72207
(501)280-0125
SHEET L2