Loading...
HomeMy WebLinkAboutZ-5781-A Map 10MASTER PLANT LIST QTY COMMON NAME BOTANICAL NAME SIZE TStrf 4,520 Sq Yds Meyer's Z-52 Zoysia Sod Zoysia japonica 'Meyer's Z-52' Solid sod free of weeds, debris and other grasses 97 Compacta Holly Ilex crenata 'Compacta' 5 gal. 24"-30"ht x 24" spr min 6 Needlepoint Holly Ilex cornuta 'Needlepoint' 7 gal. 30"-36" ht x 30" spr min 6 Soft Touch Holly Ilex crenata 'Soft Touch' 3 gal. 18"-24" ht x 18" spr min 14 'Suzanne' Loropetalum Loropetalum chinensis 'Suzanne' 3 gal. 18"-24" ht x 18" spr min 2 Wintergreen Boxwood Buxus microphylla 'Wintergreen' B&B 30"-36" ht x 30" spr min Treem 10 Autumn Blaze Red Maple Acer freemanii 'Autumn Blaze' B&B 12'-14' min, ht., 2"-2 1/2" min cal. 6 Crape Myrtle Lagerstroemia indica B&B 10'- 12' min. ht., 5'-6' min. spr., 'Natchez White' 'Natchez White' 3 or more canes 1" min. cal. each cane 8 Water Oak Quercus nigra B&B 12'-14' min. ht., 2"-2 1/2" min cal. * NOTE: ALL SOD, SEED, GROUNDCOVER, SHRUB AND TREE QUANTITIES ARE APPROXIMATE ONLY. CONTRACTOR SHOULD VERIFY EXACT QUANTITIES PRIOR TO BIDDING. 2 -PLY REINFORCED RUBBER HOSE ON EACH MAJOR TRUNK CONSTRUCT EARTH SAUCER WITH 2" HIGH MULCHED BERM. FLOOD TWICE WITH WATER IN FIRST 24 HOURS 3" DEPTH MULCH (SEE SPECIFICATIONS) MIN. 9" LAYER OF PLANTING SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO SETTLE PRIOR TO PLANTING - BREAK SUB -SOIL WITH PICK AXE. CHAMFER EDGING — TURF WALK OR CURB Vila. a ' • :r4 L2 J NOT TO SCALE PLANTING 'SUPER SOIL' OR AP] MIN. 3" M1 TYPICAL SHRUB PLANT ^-Y/ 1V111V. SECTION - PARKING LOT PLANTING DETAIL NOT TO SCALE DOUBLE STRAND GALV. 12 GUAGE WIRES TO BE IN GROUND FOR 1 YEAR NOTE: ALTERNATIVE METHODS OF GUYING MAY BE SUBMITTED FOR REVIEW AND POSSIBLE APPROVAL. REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. PLANTING MEDIUM TO BE 'SUPER SOIL' OR APPROVED OTHER GROUND LINE TO BE THE SAME AS THE NURSERY -METAL STAKE NOTE: PROVIDE FERTILOME ROOT STIMULATOR AS PER MANUFACTURE'S RECOMMENDATIONS - GUYING STAKE �— GALVANIZED WIRE 120' •�� ARKANSAS STATE LAW REQUIRES THAT THE EXCAVATOR IS TO LOCATE ALL EXISTING UTILITIES IN ACCORDANCE WITH THE ARKANSAS UNDERGROUND FACILITIES DAMAGE PREVENTION ACT. THIS LAW REQUIRES THAT THE EXCAVATOR MAKE A TELEPHONE CALL TO THE ARKANSAS ONE CALL SYSTEM AT 1-800-482-8998 AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATION TO INSURE THAT ANY EXISTING UTILITIES CAN BE LOCATED. ADJOINING PLANTING BED 3/16"x4" GREEN STEEL EDGING FINISH GRADE OF ADJACENT LAWN 1" 16" TAPERED STEEL STAKE C 30" OC MAX. r SECTION - STEEL EDGING 1,21 NOT TO SCALE ROOT BALL �; • . !r �' MULCHED TREE WELL PLAN TREE STAKING DETAIL PROVIDE 8-8-8 FERTILIZER AT 4 LBS. PER 100 SQ. FT. SEE SPECS FOR INSTALLATION 3" DEPTH MULCH (SEE SPECIFICATIONS) GROUND LINE TO BE THE SAME AS AT NURSERY MIN 18" FOR PLANTS UP TO 4'0" HIGH BREAK SUB -SOIL WITH PICK AXE CAPE NOTES 1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS. 2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION. 3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY OR UTILITIES INCURRED DURING INSTALLATION. 4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 5) ACTUAL DIMENSIONS MAY VARY ON SITE. 6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE. 7) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. PROVIDE A 4" DEPTH OF TOPSOIL IN ALL BED AREAS. TOPSOIL SHALL CONSIST OF CLEAN, DARK HUMUS RICH SOIL WITH APPROPRIATE QUANTITIES OF ORGANIC MATTER. TOPSOIL SHALL BE FREE OF WEEDS, ROOTS, STONES AND OTHER FOREIGN MATERIALS. 8) PROVIDE 3" DEPTH OF BROWN SHREDDED HARDWOOD MULCH IN ALL PLANTING BEDS. 9) STEEL EDGING SHALL BE HEAVY GAUGE (3/16" x 4") WITH STAKES. 10) REMOVE EXISTING SOIL TO 12" DEPTH, REPLACE WITH SUPERSOIL AND TILL POWDERED LIME INTO SOIL FOR ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT. 11) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT. 12) ALL PLANTING BEDS TO BE CROWNED FOR POSITIVE DRAINAGE AWAY FROM BUILDINGS, WALLS OR CENTER OF PLANTING BEDS. PLANTING SOIL REQUIREMENTS: PROVIDE HOMOGENOUS BACKFILL PLANTING MIXTURE OF 3:1 RATIO TOPSOIL OF SPECIFIED QUALITY AND PEAT MOSS. REMOVE TOP 1/3 OF BURLAP FROM ROOTBALL WHEN PRESENT 2 -PLY REINFORCED – RUBBER HOSE WRAP TREES — (IF REQUIRED) CONSTRUCT EARTH SAUCER WITH 2" HIGH MULCHED BERM.— FLOOD TWICE WITH WATER IN FIRST 24 HOURS 3" DEPTH MULCH (SEE SPECIFICATIONS) MIN. 9" LAYER OF PLANTING SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO SETTLE PRIOR TO PLANTING - BREAK SUB -SOIL WITH PICK AXE. 0JZ V 1 11JiN - NOT TO SCALE (3) DOUBLE STRAND GALV. 12 GUAGE WIRES PER TREE TO BE IN GROUND FOR 1 YEAR NOTE: ALTERNATIVE METHODS OF GUYING MAY BE SUBMITTED FOR REVIEW AND POSSIBLE APPROVAL. REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. _PLANTING MEDIUM TO BE 'SUPER SOIL' OR APPROVED OTHER GROUND LINE TO BE THE SAME AS THE NURSERY METAL STAKE NOTE: PROVIDE FERTILOME ROOT STIMULATOR AS PER MANUFACTURE'S RECOMMENDATIONS NOTES AND DETAILS Seal Drawing Type NOTES & DETAILS Project No. Date 9/12/06 Revisions L A N D 5 G A P E A R G H I T E G T 5 ROBERT5 4 NILLIAMS A55001 AT E5 1501 N. LJNIVER5ITY SUITE 430 LITTLE ROCK, AR '72207 (501)280-0125 SHEET L2