HomeMy WebLinkAboutZ-5770-C Map 1F
S
E
NW CORNER
NE1/4 NW1/4 Q`c
S8801 1'55 E I F/ SECTION 19, T -2—N, R -13—W ° Q�
- 22.88' / T—?—N R-1._�—W r,�\ IOU
LOT 1 = BANK
TOTAL AREA = 1.63 Acres
BUILDING AREA = 2,600 SF
PARKING REQUIRED = 7 SPACES
PARKING PROVIDED = 20 SPACES
NUMBER OF EMPLOYEES = 15
LOT 2 =
OFFICE BLDG
TOTAL AREA = 0.50 Acres
BUILDING
AREA = 5,184 SF
PARKING
REQUIRED = 12
SPACES
PARKING
PROVIDED = 16
SPACES'
NUMBER
OF EMPLOYEES =
10
LOT 3 =
OFFICE BLDG
TOTAL AREA = 0.66 Acres
BUILDING
AREA = 7,416 SF
PARKING
REQUIRED = 19
SPACES
PARKING
PROVIDED = 26
SPACES
NUMBER
OF EMPLOYEES =
15
20 0 20 60
Scale 1" = 20 ft
VOOD SCREEN
OR
SE EVERGREEN
PLANTING
it p/N�gcCF �q<<fy �
R Z
OyO Z
w z
s°RReC s o
ROgo THIS w
PROJECT s
CANTRE<< ROAD
o
8
J
VICINITY MAP o
SCALE 1"=2000'
I SHEPARD DR
;ENERAL NOTES
All site lighting will be low—level and directed away from
adjacent property.
Building Height not to exceed the 0-3 requirement of 45'.
Development will utilize City Garbage pick—up at street.
�. Construction of the common driveway shall occur with each Phase.
The project will be developed in three phases with construction
of one building per phase.
'UBLIC WORKS NOTES
Plans of work within the right—of—way ' will be submitted.
?. Stormwater detention ordinance does apply to this property.
3. A grading plan will be provided and a grading permit
will be obtained if required.
1. Sidewalks and handicap ramps will conform to "MSP" &
current ADA standards.
i. Any damages to curb, gutter or sidewalk in the right—of—
way will be repaired or replaced.
i. Street improvement plans shall include signage and striping.
'. Developer shall obtain all applicable permits from AHTD.
3. Developer shall dedicate right—of—way to 55' from centerline.
I. Hours of operation 8 AM — 6 PM.
). Possible uses for Lot 2 & 3 are general/professional offices.
CREEN
;GREEN
NG
® VV 1121LC 1( E -DA 1! LCeLLl1AY a s`i149,90(LIA T&99 99 1(l V C
CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING
0 24 RAHLING CIRCLE LITTLE ROCK, ARKANSAS 72223
I Survey Bv: I Drawn Br. I Checked Bv: I Approved Br. I
LEGAL DESCRIPTION
PART OF THE FRACTIONAL NW1/4 OF SECTION 19, T -2—N, R -13—W, PULASKI
COUNTY, ARKANSAS, MORE PARTICULARLY DESCRIBED AS:
BEGINNING AT THE NORTHWEST CORNER OF THE NE1/4 NW1/4 SAID SECTION
19; THENCE S8753'00"E, 164.76 FT.; THENCE S8T51'01"E, 88.73
FT.; THENCE S01'36'22"W, 501.40 FT. TO A POINT ON THE NORTH
RIGHT—OF—WAY LINE OF ARKANSAS STATE HWY. #10; THENCE N6'702'13"W
ALONG SAID NORTH RIGHT—OF—WAY LINE, 94.30 FT.; THENCE N61'38'547W
CONTINUING ALONG SAID NORTH RIGHT—OF—WAY LINE, 202.54 FT.; THENCE
N71'26'46"W CONTINUING ALONG SAID NORTH RIGHT—OF—WAY LINE, 7.13
FT.; THENCE N01'28'43"E, 376.22 FT.; THENCE S88'11'55"E, 22.88
FT. TO THE POINT OF BEGINNING, CONTAINING 2.7967 ACRES, MORE OR LESS.
(BEARINGS BASED ON ARKANSAS STATE PLANE COORDINATES—NORTH ZONE)
I HEREBY CERTIFY THAT I HAVE SURVEYED THE PROPERTY SHOWN AND
DESCRIBED HEREON. PROPERTY LINES ARE LOCATED IN ACCORDANCE WITH
ESTABLISHED PROPERTY LINES. THERE ARE NO APPARENT ENCROACHMENTS
EXCEPT AS SHOWN,
NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100 YEAR FLOOD
BOUNDARY AS SHOWN ON THE FLOODWAY, FLOOD BOUNDARY AND FLOOD
INSURANCE WORK MAP FOR PULASKI COUNTY, ARKANSAS.
Paul M. Wh
PLS #1281 Ark
PLANNED OFFICE DEVELOPMENT
MAXMART POD „R°�,{ PLANNING CDh,1^iISSIDtJ
__, .SUBJECTTOTHE CONDITIONS
CANTRELL ROAD ti` `'T DECO D DATED IN THE PLANN4I�� ;I" ozloN
BY:
DATE: l L( I rs f o >_
LITTLE ROCK, ARKANSAS
9-23-02
6-20-02
Revised 6-5-02
Date 5-13-02
Scale Hor. Vert.
1"=20'
Sheet of
Job No -02-0297
UT�Ue� 2002 90:GE LO V2 daS ani 00d\�V0SNHV9\2002\:H