HomeMy WebLinkAboutZ-5770-A Staff AnalysisFILE NO.: 2-5770-A
NAME: MGM PROPERTIES -- AMENDED SHORT -FORM POD
LOCATION: On the north side of Highway 10, approximately 1/4
mile west of the east Taylor Loop Road intersection
DEVELOPER: ENGINEER:
S. Barksdale McKay Joe White
RIVER CITY ENERGY COMPANY WHITE-DATERS & ASSOCIATES, INC.
11025 Anderson Rd., Suite 100 401 S. Victory St.
P. O. Box 22837 Little Rock, AR 72201
Little Rock, AR 72221 374-1666
227-7001
AREA:
2.82 ACRES
NUMBER OF LOTS: 1
FT, NEW STREET: 0
ZONING:
POD & R-2
PROPOSED USES:
Offices
PLANNING DISTRICT: 1
CENSUS TRACT: 42.05
VARIANCES REQUESTED: None
STATEMENT OF PROPOSAL:
The applicant proposes an amendment to an existing POD to add
additional acreage to the approved site and to make changes to
the approved site plan. No changes in the approved uses is
proposed.
On January 4, 1994, the Planning Commission approved a POD for
the applicant for development of a 1.82 acre site with two office
buildings to be used for 0-3 office uses. The Board of
Directors, on February 1, 1994, in Ordinance No. 16,586,
established the POD. Subsequently, the applicant has had an
opportunity to acquire the abutting 1 acre tract to the east of
the original site, and wishes to combine the two tracts and amend
the POD site plan.
Proposed are two office buildings. Both are proposed to be
2 -story, with basements. Building I is placed 110 feet north of
Highway 10. It is to contain a total of 22,800 square feet
(10,000 square feet on both the ground and second floor, and
2,800 square feet in the basement). The second building is sited
to the north of the first building. It is to contain a total of
20,300 square feet (8,750 square feet on both the ground and
second floor, and 2,800 square feet in the basement). The site
plan provides parking spaces for 98 vehicles, and access to the
site is from a single central drive approach off Highway 10.
(Note: The original submission proposed two drive approaches off
Highway 10, but, in response to the Public Works comments, the
plan was changed.) The development is to take place in two
FILE Z-577 -A Cont.
phases, with the rear/northernmost building being developed
first. This building is planned to be built in mid-1995, and is
to house the applicant's business' offices. The second building,
the southernmost building, is to be constructed as the market
demand for office space develops. A monument sign is planned at
the front of the sign. It and the landscaping of the site will
comply with the Highway 10 Overlay requirements. The requested
uses of the site are all uses by right in the 0-3 zoning district
list.
A. PROPQSAW REQUEST:
Review by the Planning Commission and approval by the Board
of Directors is requested for an amendment to an existing
POD in order for the applicant to add an additional 1 -acre
tract to the site and to change the site plan to take
advantage of this increased size of the tract. As
previously approved, two buildings are proposed for the
site; however, in the revised plan, the building sizes have
been increased from two, 6000 square foot, single story
buildings to two, 2 -story with basement buildings, one (the
one closest to Highway 10) having a total square footage of
22,800 square feet; the other, 20,300 square feet. All uses
allowed by right in the 0-3 zoning district are requested.
Parking for 96 vehicles is proposed. A monument sign is
proposed beside the entrance driveway, and it and the
landscaping will, according to the applicant, conform to the
Highway 10 Overlay requirements.
B. EXISTING CQNDITIONS:
The original 1.88 acre site is still vacant and heavily
wooded. The 1 -acre site to the east of the original tract
has a single home located approximately mid -way back on the
tract. This tract also contains many trees, and the rear of
the tract is heavily wooded. The topography of the proposed
POD site rises in elevation from south to north, with the
north boundary of the site being approximately 28 feet
higher than the south boundary along Highway 10.
The original 1.88 acre site is zoned POD. The surrounding
properties are all zoned R-2, although there are non-
conforming uses in the area. (An animal clinic is located
directly across Highway 10 from the site, and a photography
studio is located immediately to the west of the site.)
C. ENGINEERING/UTILITY COMMENTS:
Public Works comments that only one curb cut per 300 feet of
frontage will be allowed. Prior to issuance of the building
permit, the applicant must submit a complete grading and
drainage plan, as well as a stormwater detention plan.
E
FILE Z- 7'70- C nt.
Water Works reports no objections.
Wastewater reports that a sewer main extension, with
easements, will be required for service to this site.
Southwestern Bell Telephone Co. approved the submittal
without comment.
The Fire Department approved the site plan as presented.
Landscape review reports that the areas set aside for
buffers and landscaping meet the Highway 10 overlay and
landscape ordinance requirements. Where on-site existing
natural vegetation does not provide adequate year-round
screening, a 6 foot high opaque screen will be required to
screen the proposed development from the residential zoned
property to the north, east, and west. Because the southern
parking area is proposed to be at a significantly higher
elevation than Highway 10, extra attention to screening this
area from Highway 10 will be necessary.
Land Use review comments that the site is located within the
River Mountain Planning District, and is designated as
Transition Zone (TZ) on the land use plan. The TZ category
is intended to provide for a transition area between single-
family uses and other more intense uses. Office uses are
appropriate within the Transition Zone, provided that the
maximum floor area ratio is 0.2. The
D. ISSUES LEGALITECHNT ALIDE,91G�+I:
The Ordinance requires parking at a rate of 1/400 sf. The
Ordinance states that for structures larger than 10,000 sf,
the basic requirement shall be met for the first 10,000 sf,
then for the square footage between 10,000 & 20,000 sf, the
parking is 95% of the basic rate; for the square footage
lying between 20,000 sf and 30,000, the parking is 90% of
the basic rate. Building 1 has 22,800 sf. This will
require 55 parking spaces. Building 2 has 20,300. this
will require 31 spaces. The total required parking, then,
is 86. Parking for 96 vehicles is provided.
E. ANALYSIS•
The applicant has made the changes in the plan which were
required by Public Works concerning the single drive
approach off Highway 10. There are no other issues to be
resolved. The use is not in conflict with the land use
plan.
F. STAFF REC M ENDATIONS:
Staff recommends approval of the POD request.
3
FILE NO.: 2-577 -A Cont.
❑BDIVI I MMITTEECOMM-ENT: (AUGUST 18, 1994)
Mr. Barksdale McKay, the applicant was present. Staff presented
the application and reviewed with the Committee the proposed site
plan. Mr. McKay related that he had previously gained approval
of a POD encompassing a 1.82 acre portion of the site, but had
been presented with an opportunity to acquire the adjoining
1 acre. He, therefore, was seeking an amended POD to reflect the
newly enlarged site. The Committee reviewed with Mr. McKay the
comments contained in the discussion outline. Mr. McKay asked
for clarification on the Public Works comment which limited him
to one drive off Highway 10. The Public Works staff responded
that the regulations which limit the number of access points off
Highway 10 was adopted on January 18, 1994, so the previous POD
site, which had been approved with two driveways had preceded the
new ordinance. Mr. McKay assured the Committee members that he
would make the needed changes, and the Committee forwarded the
POD request to the Commission for the public hearing.
PLANNING COMMISSION ACTIO: (SEPTEMBER 6, 1994)
Staff reported that the applicant had submitted a revised site
plan which addresses the Public Works concerns regarding the
drive approach off Highway 10. Staff reported that there are
no other concerns to be addressed, and the item was included on
the consent agenda for approval. The amended short -form POD
was approved with the vote of 10 ayes, 0 nays, 0 absent,
0 abstentions, and 1 open position.
4