HomeMy WebLinkAboutZ-5770 Staff AnalysisNO.
NAME: MAXMART -- SHORT -FORM POD
LOCATION: On the north side of Highway 10, approximately 1/4
mile west of Pinnacle Valley Road at 14,924 Highway 10
DEVELOPER:
Barksdale McKay
RIVERCITY ENERGY CO.
3100 Interstate 30
Little Rock, AR 72206
374-4825
AREA: 1.82 ACRES
ZONING: R-2 to POD
PLANNING DI TRICT: 1
CENSUS TRACT: 42.05
ENGINEER:
Tim Daters
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
NUMBER OF LOTS: 1 FT. NEW STREET: 0
PROPOSED ]ISES: Office
VARIANCES RE VESTED: None
STATEMENT OF PROPOSAL:
The applicant proposes a Planned Office Development District in
order to develop a 1.82 acre tract with two office buildings,
each proposed to be one story, 6000 square feet in size. A drive
along the west property line, with parking between and in front
of the buildings, is proposed. Leaving the heavy forest cover
along the perimeter of the property is planned, and the applicant
anticipates leaving much of the area in its natural state. The
rear, northern -most building is to be Phase I of the development
and will house the applicant's Rivercity Energy Company offices.
The front, southern -most building, will be built as Phase II;
however, no definite date is established for its development.
That building would be built as a tenant -occupied office building
when an appropriate tenant is located and when it is economically
feasible to proceed with this phase.
A. PROPOSALIREOUEST:
Review by the Planning Commission and approval by the Board
of Directors is requested for the establishment of a Planned
Office Development District on property to be acquired by
the applicant. Requested is approval of a POD which will
include two, one-story, 6000 square foot buildings with
associated drives and parking. The requested uses include
all permitted uses in the 0-3 zoning district.- A phased
development is proposed, with the rear, northern -most
building, the drive, and a portion of the parking being
Phase I; the front, southern -most building and the remainder
of the parking being Phase II. There is no time -table
FILE NO.: Z-5770 Continued
established for the development of Phase II. Much of the
site is proposed to be left in its natural state, heavily
wooded and forested. The signage is to be located at the
entrance to the property and will comply with the applicable
standards and requirements.
B. EXISTING CONDITIONS:
The site is undeveloped and is heavily wooded and overgrown.
The current zoning is R-2, with R-2 zoning existing on the
surrounding properties. There are residences on the
properties to the east and west.
C. ENGINEERING UTILITY COMMENTS:
The City Engineering office reports that the Detention and
Excavation Ordinances are applicable to this development. A
6 foot sidewalk along the Highway 10 frontage will be
required to be constructed. Engineering indicates that the
driveway needs to be moved to the east side of the property,
and that the drive needs to approach Highway 10 at a 90
degree angle.
Water Works indicates that on-site fire protection will be
required.
Wastewater indicates that no service is currently available
to the site without an sewer main extension.
Site Plan review reports that the Landscape Ordinance will
require 6% of the interior of the vehicular use area be
landscaped. A 6 foot high opaque screen (i.e., a good
neighbor fence or evergreen shrubs spaced every 3 feet) is
required along the north, east, and west perimeter of the
property.
Arkansas Power and Light Co. and Southwestern Bell Telephone
Co. will require easements.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
The Fire Department indicated that an additional fire
hydrant may be needed.
D. ISSUES LEGAL TECHNICAL _DESIGN:
The establishment of the POD will involve a preliminary and
final plat. The applicant should anticipate complying with
this requirement.
2
FILE NO.: Z-5770 (Continued)
E. ANALYSIS:
The proposal includes provision for extensive buffering of
the site from the abutting residential uses. The Planning
Staff indicates that the adopted Land use Plan recommends
this property to be a Transition Zone. The proposed use is
appropriate, and the Floor Area Ratio meets the plan
requirements.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the request.
SUBDIVISION COMMITTEE COMMENT:
(DECEMBER 9, 1993)
The applicant, Mr. Barksdale McKay, and the engineer, Mr. Joe
White, were present. Staff presented the request to the
Committee and outlined the deficiencies noted in the discussion
outline. The applicant indicated that he would furnish the items
requested. The Committee briefly discussed the proposal and
referred the item to the Commission for the hearing.
PLANNING COMMISSION ACTION: (JANUARY 4, 1994)
The item was included on the Consent Agenda for approval and was
approved with the vote of 7 ayes, no nays, 4 absent, and no
abstentions.
3
January 4, 1994
ITEM NO.: 8 FILE NO.- 7-5770
NAME: MAxMART -- SHORT -FORM POD
LOCATION: On the north side of Highway 10, approximately 1/4
mile west of Pinnacle Valley Road at 14,924 Highway 10
DEVELOPER:
Barksdale McKay
RIVERCITY ENERGY CO.
3100 Interstate 30
Little Rock, AR 72206
374-4825
AREA: 1.82 ACRES
ZONING: R-2 to POD
PLANNING DISTRICT: 1
CENSUS TRACT: 42.05
ENGINEER:
Tim Daters
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
NUMBER OF LOTS: 1 FT. NEW STREET: 0
PROPOSED USES: Office
VARIANCES REQUESTED: None
STATEMENT OF PROPO AL:
The applicant proposes a Planned Office Development District in
order to develop a 1.82 acre tract with two office buildings,
each proposed to be one story, 6000 square feet in size. A drive
along the west property line, with parking between and in front
of the buildings, is proposed. Leaving the heavy forest cover
along the perimeter of the property is planned, and the applicant
anticipates leaving much of the area in its natural state. The
rear, northern -most building is to be Phase I'of the development
and will house the applicant's Rivercity Energy Company offices.
The front, southern -most building, will be built as Phase II;
however, no definite date is established for its development.
That building would be built as a tenant -occupied office building
when an appropriate tenant is located and when it is economically
feasible to proceed with this phase.
A. PROPOSAL/RE Ute:
Review by the Planning Commission and approval by the Board
of Directors is requested for the establishment of a Planned
Office Development District on property to be acquired by
the applicant. Requested is approval of a POD which will
include two, one-story, 6000 square foot buildings with
associated drives and parking. The requested uses include
January 4, 1994
ITEM NO.: 8 (Conti. .: Z-5770
all permitted uses in the 0-3 zoning district. A phased
development is proposed, with the rear, northern -most
building, the drive, and a portion of the parking being
Phase I; the front, southern -most building and the remainder
of the parking being Phase II. There is no time -table
established for the development of Phase II. Much of the
site is proposed to be left in its natural state, heavily
wooded and forested. The signage is to be located at the
entrance to the property and will comply with the applicable
standards and requirements.
B. EXISTING CONDITIONS:
The site is undeveloped and is heavily wooded and overgrown.
The current zoning is R-2, with R-2 zoning existing on the
surrounding properties. There are residences on the
properties to the east and west.
C. ENGINEERING/UTILITY COMMENTS:
The City Engineering office reports that the Detention and
Excavation Ordinances are applicable to this development. A
6 foot sidewalk along the Highway 10 frontage will be
required to be constructed. Engineering indicates that the
driveway needs to be moved to the east side of the property,
and that the drive needs to approach Highway 10 at a 90
degree angle.
Water Works indicates that on-site fire protection will be
required.
Wastewater indicates that no service is currently available
to the site without an sewer main extension.
Site Plan review reports that the Landscape Ordinance will
require 6% of the interior of the vehicular use area be
landscaped. A 6 foot high opaque screen'(i.e., a good
neighbor fence or evergreen shrubs spaced every 3 feet) is
required along the north, east, and west perimeter of the
property.
Arkansas Power and Light Co. and Southwestern Bell Telephone
Co. will require easements.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
The Fire Department indicated that an additional fire
hydrant may be needed.
2
January 4, 1994
ITEM NO.: $ (Continued) FILE NO.: Z-5770
D. ISSUESILEGAL/TECHNICAL DESIGN:
The establishment of the POD will involve a preliminary and
final plat. The applicant should anticipate complying with
this requirement.
E. ANALYSIS:
The proposal includes provision for extensive buffering of
the site from the abutting residential uses. The Planning
Staff indicates that the adopted Land Use Plan recommends
this property to be a Transition Zone. The proposed use is
appropriate, and the Floor Area Ratio meets the plan
requirements.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the request.
SUBDIVISION COMMITTEE COMMENT:
(DECEMBER 9, 1993)
The applicant, Mr. Barksdale McKay, and the engineer, Mr. Joe
White, were present. Staff presented the request to the
Committee and outlined the deficiencies noted in the discussion
outline. The applicant indicated that he would furnish the items
requested. The Committee briefly discussed the proposal and
referred the item to the Commission for the hearing.
PLANNING COMMISSION ACTION:
(JANUARY 4, 1994)
The item was included on the Consent Agenda for approval and was
approved with the vote of 7 ayes, no nays, 4 absent, and no
abstentions.
3