ITEM NO.: 5 FILE NO.: 71-5755-A
NAME: REES DEVELOPMENT -- AMENDED SHORT -FORM PLANNED
COMMERCIAL DEVELOPMENT
LOCATION: On the east side of Bowman Road, approximately 0.25
mile north of Chenal Parkway
DEVELOPER:
John Rees
Rees Development
12115 Hinson Road
Little Rock, AR 72211
223-228
AREA: ACRES NUMBER OF LOTS:
ZONING: PCD
PLANNING DISTRICT: 2
CENSUS TRACT: 24.04
VARIANCES REQUESTED: None
STATEMENT OF PROPOSAL:
ENGINEER:
Pat McGetrick
MCGETRICK ENGINEERING
11,225 Huron Ln., Suite 200
Little Rock, AR 722111
223-9900
2 FT. NEW STREET: 0
PROPOSED USES: Commercial
A PCD was approved by the Planning Commission in November, 1993,
and was established by the Board of Directors in January , 1994.
The approved plan consisted of two buildings, the southern most
building containing 9,000 square feet and being a single -story
building; the second, a building with a total of 24,250 square
feet and a partial second floor. Each building was to face
westward towards Bowman Rd., with the substantial portion of the
parking being buffered from the residential area in Birchwood by
the buildings. The applicant has submitted an amended site plan
which contains one building, a one-story building containing
25,090 square feet, which is oriented north onto a large parking
lot which extends from Bowman Rd. on the west to the Birchwood
neighborhood boundary. The use indicated is for a book store.
A. PROPOSAL RE UEST:
Review by the Planning Commission and approval by the Board
of Directors is sought for an amended PCD for the Rees
Development PCD, recommended for approval in November, 1993,
and established by the Board in January, 1994. The proposed
amended site plan indicates a single one-story building --
containing 25,090 square feet. This is a change from the
approved plan which indicated two separate buildings, the
southern -most building being a single -story building
May 3, 1994
SUBDIVISION
ITEM NO.: b Continued FILE NO Z -5755-A
containing 9,000 square feet and the northern -most building
being a partial two-story building containing a total of
24,250 square feet. In lieu of the buildings being oriented
towards Bowman Rd. with the parking being primarily between
the buildings and Bowman Rd., the revised site plan shows
the single building being oriented northward and toward a
large single parking facility which extends from Bowman Rd.
to the Birchwood neighborhood boundary.
B. EXISTING CONDITIONS:
The site is undeveloped, heavily wooded, and has a
substantial differential in terrain across it.
The existing zoning of the site is PCD. To the east is the
Birchwood neighborhood in an R-2 zoning district. To the
south is a C-1 tract. To the north and to the west across
Bowman Rd. is a large C-3 tract.
C. ENGINEERING UTILITY COMMENTS:
Engineering reports that the south driveway must be moved 10
feet south to line up with the parking which is adjacent to
the building. The dumpster is to be relocated for better
access. Place landscape islands in the parking lot. The
Stormwater Detention and Excavation Ordinances are
applicable in the development of this site.
Water Works reports that an additional public fire hydrant
will probably be required. This would be installed by Water
Works crews at Water Works expense, but would need to be
coordinated with the construction of this project.
Wastewater reports that a sewer main is located on the west
side of Bowman Rd. If access cannot be made to this sewer
main, then a sewer main extension with easements will be
required.
Arkansas Power and Light Co. will require easements.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require easements.
The Fire Department approved the submittal without comment.
Landscape review reports that a 6 foot high opaque screen is
required along the eastern perimeter of the tract. This
screen may either be a wood "good neighbor" fence or dense_,
evergreen plantings. The dumpster will need to be screened
with an 8 foot high opaque wall or fence on a minimum of 3
sides.
May 3, 1994
SUHDIVI ION
ITEM NO.: 6 Continued FILE NO.: Z- 756--A
D. IS UES/LEGAL/TECHNICAL/DESIGN:
The Planning staff reports that the site is located in the
I-430 District. The adopted plan recommends mixed office
and commercial. While the request may not meet the spirit
of mixed office and commercial, it does meet the
requirements of this land use classification. There is,
then, no land use issue.
All that has been submitted as of this writing is an
architectural site plan. There is no application form; no
fee has been paid; no project narrative has been furnished;
no proposed uses have been formally requested; and, no
engineered site plan with the required exhibits has been
submitted.
E. ANALYSIS:
Because of the critical deficiencies in the submittal, a
proper review by staff cannot proceed.
F. STAFF RECOMMENDATIONS:
Staff recommends withdrawal
applicant's submission of a
of the application fee.
SUBDIVISION COMMITTEE COMMENT:
of the application, pending the
proper application and payment
(APRIL 14, 1994)
Mr. John Rees, the applicant, was present. The Committee
reviewed the comments contained in the discussion outline, and
indicated to Mr. Rees that the request could not be reviewed due
to the deficiencies of the submittal. The Committee indicated
that Mr. Rees needs to defer the hearing of his request to the
next Subdivision agenda, and that the Committee would need to
review the completed submission at its next meeting.
PLANNING COMMISSION ACTION:
(MAY 3, 1994)
Staff reported that a letter had been received from the
developer, dated April 29, 1994, asking that the item be
withdrawn. The request for withdrawal was included on the
Consent Agenda, and the withdrawal was approved with the vote
of 10 ayes, 0 nays, 1 absent, and 0 abstentions.