HomeMy WebLinkAboutZ-5736-A Staff Analysis1. Meeting nate: July 5, 1994
2. Case No.: Z-5736
3. Request: Waiver of required Master Street Plan improvements
to Lawson Road for Community Fellowship Church
4. Location: 14100 Block of Lawson Road, south side
5. Owner/Aunlicant: Community Fellowship Church by
Terry Bryant
6. Existing Status: Vacant, R-2 zoned, 7.9 acre tract fronting
on Lawson Road which, at this point, is a rural, asphalt
paved street with no improvements. The property has 160
feet of frontage on Lawson Road.
7. Source of Recruirement: A conditional use permit was
approved by the Little Rock Planning Commission on October
5, 1993 allowing for the phased construction of a church,
private school, and church camp on this site. The
conditional use permit review required conformance to the
Master Street plan. Lawson Road is classified as a minor
arterial street by the plan.
8. Staff Recommendation: Staff recommends denial of a complete
waiver as being inconsistent with the established city
policy of obtaining required street improvements where
required by the Master Street Plan and Subdivision
Ordinance.
The proposed church site is not within the city limits and
is located in an area likely to remain rural in nature for
some time.
Staff would recommend that a deferral be granted for a
period not to exceed five (5) years or until Phase II of the
church's building plan is initiated. Phase II includes the
construction of a 250 seat sanctuary, additional classroom
space, and the proposed private school.
9. Planning Commission Recommendation: The Planning Commission
approved the conditional use permit subject, in part, to
compliance with the City Engineer's Comments which included
the requirement of right-of-way dedication and street
improvements to Lawson Road.
10. Conditions or Issues Remaining to be Resolved: None,
attendant to this issue.
11. Right -of -Way Issues: The church has dedicated the required
right-of-way for Lawson Road.
12. Specific Improvements Retruested for Waiver: Curb, gutter,
sidewalk and half of minor arterial street improvements
along the south side of Lawson Road for a distance of
160 feet adjacent to the proposed church site.
13. nbiectors: None, as of this writing.
14. Neighborhood Plan: Crystal Valley (17)
15. Neighborhood Contact Person/Others: None
FILE NO.: Z-5736
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1.
2.
Site Location
Community Fellowship Church -
Conditional Use Permit
14100 Block of Lawson Road, south
side
Rosetta Calvert and Chloe Brucks/
Community Fellowship Church
A conditional use permit is
requested to allow for the phased
construction of a church, private
school and church camp on this R-2
zoned 7.29 acre site. This
property is located outside of the
Little Rock city limits but is
within the city's area of
subdivision and zoning
jurisdiction.
The proposed church site is located on the south side of
Lawson Road, approximately one mile south of Colonel Glenn
Road.
Compatibility with Neighborhood
This property is located outside of the city limits in a
rural area of single family homes on large tracts of land
and large areas of vacant woodland.
A small church is located approximately one-half mile east
of this site.
Much of the proposed church site is to remain undeveloped.
With attention given to screening the adjacent residential
properties, this proposed use should be compatible with the
neighborhood.
3. On -Site Drives and Parkinct
There is an existing gravel access easement crossing the
property which provides access to three adjacent residential
properties. This gravel access road will be relocated to
the west perimeter of the church site and will be utilized
by the church and the adjacent residential properties.
FILE NO.: Z-5736 (Continued)
4.
0
6.
7.
The Phase I sanctuary will seat 125 persons, requiring
31 on-site parking spaces. The site plan as submitted shows
22 on-site spaces.
The current membership of the church is 20 to 25
individuals.
The Phase II sanctuary will seat 250 persons, requiring
63 on-site parking spaces. These additional required
parking spaces must be provided on the site plan.
The applicant is requesting a deferral of the paving
requirement for the proposed parking area until the Phase II
sanctuary is built, at which time the parking lot would be
paved and landscaped to comply with city codes.
Screening and Buffers
Compliance with the City's Landscape and Buffer Ordinances
is required.
City Engineer Comments
Dedicate additional right-of-way on Lawson Road to 45 feet
from centerline. Construct half street improvements to
Master Street Plan standards for a minor arterial street or
provide in lieu contribution. The majority of this property
is located within the flood zone.
Utility mm nts
Provide for on-site fire protection, to be implemented at
time of annexation. Contact Little Rock Municipal Water
Works.
Applicant must sign a preannexation agreement and obtain
approval from the City prior to obtaining water service.
Southwestern Bell Telephone requires a 5 foot easement along
all property lines.
Analysis
Community Fellowship Church is a new congregation, started
on Easter Sunday 1993, which now meets in a members home.
The church currently has a membership 20 to 25 persons. The
church has acquired this 7 acre site and is in a position to
build a facility of its own.
In an effort to present the Commission with a long range,
comprehensive plan, the church has developed a site plan
showing three major phases of the development of a church,
private school and a church camp.
E
FILE NO.: Z-5736 (Continued)
This was done recognizing that it is difficult for a new
church of this size to develop a concrete, long range
development plan and the plan before the Commission is, in
some ways, conceptual.
Phase I of the plan provides for the construction of a
single building containing classrooms and a 125 seat
sanctuary. A corresponding 22 space parking lot taking
access off of a 30 foot gravel access easement will be built
with this phase.
Phase II, which is envisioned as occurring in approximately
3 years, involves the construction of a second building
containing a 250 seat sanctuary and additional classroom
space. Although not shown on the plan, a parking lot
expansion to accommodate the required 63 on-site parking
spaces will be built with this phase.
The proposed private school will be initiated with Phase II.
The school will begin with grades K-6 and will later expand
to include grades 7-12. The private school will have an
enrollment of approximately 60 students.
Phase III, occurring after an additional 3 years, will
consist of the construction of a family life center
containing a gymnasium and dormitory rooms for the proposed
church camp. The proposed dorm rooms will house 60 persons.
A softball field will be constructed either during Phase II
or III. The field will be for day use and will not have any
lighting.
Staff feels that Community Fellowship Church has made a good
faith effort to develop a comprehensive site plan in keeping
with ordinance standards and is willing to concede some
degree of flexibility in the implementation of the plan.
Any major changes will need to be reviewed by the Planning
Commission.
8. Staff Recommendation
Staff recommends approval of this application as filed
subject to:
1. Compliance with the City's Landscape and Buffer
Ordinances
2. Compliance with City Engineer and Utility Comments
3. Adequate on-site parking being provided for all phases
of the development.
3
FILE NO.: Z-5736 (Continued)
Staff also recommends approval of the request to defer
paving requirements for the parking lot until Phase II
of the development.
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 16, 1993)
Community Fellowship Church was represented. Staff presented the
item and noted the City Engineer and Utility Comments outlined
above.
A discussion then followed concerning the various aspects of the
phasing plan. It was determined that adequate parking must be
provided on the site plan.
Tad Borkowski, of the City Engineer's Office, recommended that
the applicant confer with the County Planning Office regarding
the flood zone issue.
The applicant stated that the church would agree to dedicate any
needed right-of-way but would probably request a waiver of the
required street improvements to Lawson Road.
After further discussion, the Committee determined that there
were no other outstanding issues and forwarded this item to the
full Commission for final resolution.
PLANNING COMMISSION ACTION:
The applicant was present.
(OCTOBER 5, 1993)
There were no objectors present.
Staff presented the item and offered a recommendation of
approval.
The Commission was informed that a revised site plan had been
submitted which shows the additional required parking.
The Commission was also informed that the applicant agreed to
dedicate the needed right-of-way but would ask the Board of
Directors to waive the required improvements.
Chairman Walker asked if the City Engineer's Office had an
opinion on the request to waive right-of-way improvements.
Jerry Gardner, of the City Engineer's Office, stated that his
office did not object to the waiver based on the property's
location and the fact that it was not in an urban area that would
see street improvements anytime in the foreseeable future.
4
FILE NO.: Z-5736 Continued
The Commission determined that there were no other outstanding
issues and placed this item on the Consent Agenda for approval.
The vote was 8 ayes, 0 noes and 3 absent.
5
July 26, 1994
ITEM NO.: 8 FILE NO.: Z -5736-.A
NAME:
LOCATION:
OWNERZAPPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location
Community Fellowship Church -
Revised Conditional Use Permit
14100 Block of Lawson Road,
South Side
Community Fellowship Church by
Terry Bryant
The applicant is requesting a
revision of a previously approved
conditional use permit which
allowed for the phased construction
of a church, private school and
church camp on this R-2 zoned 7.29
acre site. The previous approval
was given on October 5, 1993. This
application would allow for the
shifting of buildings and parking
lots to compensate for low areas on
the property. No change in use is
proposed.
The site is located on the south side of Lawson Road,
approximately one mile south of Colonel Glenn Road.
2. compatibility with Neigrhborhood%
This property is located outside of the city limits in a
rural area of single family homes on large tracts of land
and large areas of vacant woodland. The proposed revisions
should not effect the proposed church's compatibility with
the neighborhood.
3. On -Site Drives and Parkincr
There is an existing gravel access easement crossing the
property which provides access to three adjacent residential
properties. This gravel access road will be relocated to
the west perimeter of the church site and will be utilized
by the church and the adjacent residential properties.
The phasing of the development and the seating in the
sanctuary is the same as the previously approved site plan.
The Phase I sanctuary will seat 125 persons, requiring
July 26, 1994
ITEM NO.: 8 Continued FIVE NO.: 5-5736-A
31 on-site parking spaces. The Phase II sanctuary will seat
250 persons, requiring 63 on-site parking spaces. The
required parking will be provided in phases, corresponding
to the phased development of the buildings.
The applicant is again requesting a deferral of the paving
requirement for the parking lot until the Phase II sanctuary
is built, at which time the parking lot would be paved and
landscaped to comply with city code.
4. Screening and Buffers
Compliance with the City's Landscape and Buffer Ordinances
is required.
5. City Engineer Comments
The applicant dedicated right-of-way on Lawson Road to 45
feet from centerline through the earlier Planning Commission
action. On July 5, 1994, the Board of Directors approved a
5 year deferral of the Master Street Plan required
improvements to Lawson Road.
A large portion of this property is located in the
floodplain and part of the property is actually in the
floodway. Provide proof that the county requirements have
been satisfied regarding development in the floodplain.
6. Utility Comments
Provide for on-site fire protection, to be implemented at
the time of annexation. The applicant must sign a
preannexation agreement and obtain approval from the City
prior to obtaining water service. Southwestern Bell
Telephone Company requires a 5 foot easement along all
perimeters.
7. Analysis
On October 5, 1993, the Little Rock Planning Commission
approved a three phase development for Community Fellowship
Church allowing for the construction of a church, private
school and church camp on this site. There is no change
proposed in the phasing plan.
Phase I provides for the construction of a single building
containing classrooms and a 125 seat sanctuary. Phase II,
which is envisioned as occurring approximately three years
after the completion of Phase I, involves the construction
of a second building containing a 250 seat sanctuary and
additional classroom space.
2
July 26, 1994
ITEM NO.: 8 (Continued) FILE NO.: Z -5736-A
The required parking will also built in phases corresponding
to the development of this site.
The proposed private school will be initiated with Phase II.
The school will begin with grades K-6 and will later expand
to include grades 7-12. The private school will have an
enrollment of approximately 60 students.
Phase III, occurring after an additional three years, will
consist of the construction of a family life center
containing a gymnasium and dormitory for the proposed church
camp. The proposed dorm rooms will house 60 persons.
An open -play field will be constructed either during Phase
II or III. The field will be for day use and will not have
any lighting.
After the October 1993 Planning Commission approval and
during the preparation for site work, the applicant found
that much of the area selected for building sites was low
and required an excessive amount of fill and foundation
height to raise it above the floodplain level. This
proposed site plan basically switches the areas proposed for
parking and for building sites and places the buildings on
the higher portions of the property.
At the time of the initial application, staff recognized
that the plan was conceptual and was willing to concede some
degree of flexibility in the implementation of the plan.
Staff feels that this proposal- involved such a degree of
change as to require review by the Planning Commission.
Staff is supportive of this revised plan.
8. Staff Recommendation ,
Staff recommends approval of this application subject to:
1. Compliance with the City's Landscape and Buffer
Ordinances
2. Compliance with City Engineer and Utility Comments
3. Adequate on-site parking being provided for all phases
of the development.
4. Compliance with the Pulaski County Planning
Department's requirements regarding development in the
flooplain
Staff also recommends approval of the request to defer
paving the parking lot until Phase II of the development.
K
July 26, 1994
ITEM NO • 8 (Continued) FILE NO.: Z -5736-A
SUBDIVISION COMMITTEE COMMENT: (JULY 7, 1994)
The applicant, Terry Bryant, was present. Staff presented the
item and noted the Landscape, City Engineer and Utility Comments.
Mr. Bryant explained the reasoning behind the requested revision.
He stated that the County Planning Office had established minimum
floor elevations for buildings to be constructed on the site. In
order to meet those minimum floor elevations it would require an
excessive amount of fill to keep the buildings where previously
approved by the Planning Commission. Mr. Bryant stated that much
expense could be saved by relocating the buildings to the high
points on the property and putting the parking lots on the low
points.
Scott Foster, of the City Engineer's Office, stated that much of
this property is in the floodplain and the portion nearest Lawson
Road is actually in the floodway. He stated that written
documentation must be received from the Pulaski County Planning
Office approving this site development in the floodplain.
Mr. Bryant responded that he would provide the documentation
required.
Staff informed the Committee that the Board of Directors approved
a 5 year deferral of required Master Street Plan improvements to
Lawson Road on July 5, 1994.
The Committee determined that there were no other outstanding
issues and forwarded the item to the full Commission.
PLANNING COMMISSION ACTION: (JULY 26, 1994)
The applicant, Terry Bryant, was present. One objector had been
in attendance, but he left before the item was heard by the
Commission. There was no discussion of the conditional use
permit request.
The question was called and the Commission voted to approve the
revised conditional use permit. The vote was 7 ayes, 0 nays,
2 absent, 1 abstention (K. Oleson) and 1 open position.
4
FILE NO_: Z-5736
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location
Community Fellowship Church -
Conditional Use Permit
14100 Block of Lawson Road, south
side
Rosetta Calvert and Chloe Brucks/
Community Fellowship Church
A conditional use permit is
requested to allow for the phased
construction of a church, private
school and church camp on this R-2
zoned 7.29 acre site. This
property is located outside of the
Little Rock city limits but is
within the city's area of
subdivision and zoning
jurisdiction.
The proposed church site is located on the south side of
Lawson Road, approximately one mile south of Colonel Glenn
Road.
2. Compatibility with Neighborhood
This property is located outside of the city limits in a
rural area of single family homes on large tracts of land
and large areas of vacant woodland.
A small church is located approximately one-half mile east
of this site.
Much of the proposed church site is to remain undeveloped.
With attention given to screening the adjacent residential
properties, this proposed use should be compatible with the
neighborhood.
3. On -Site Drives and Parkin
There is an existing gravel access easement crossing the
property which provides access to three adjacent residential
properties. This gravel access road will be relocated to
the west perimeter of the church site and will be utilized
by the church and the adjacent residential properties.
FILE NO.: Z-5736 (Continued)
4.
5.
6.
7.
The Phase I sanctuary will seat 125 persons, requiring
31 on-site parking spaces. The site plan as submitted shows
22 on-site spaces.
The current membership of the church is 20 to 25
individuals.
The Phase II sanctuary will seat 250 persons, requiring
63 on-site parking spaces. These additional required
parking spaces must be provided on the site plan.
The applicant is requesting a deferral of the paving
requirement for the proposed parking area until the Phase II
sanctuary is built, at which time the parking lot would be
paved and landscaped to comply with city codes.
Screening and Buffers
Compliance with the City's Landscape and Buffer Ordinances
is required.
City Engineer Comments
Dedicate additional right-of-way on Lawson Road to 45 feet
from centerline. Construct half street improvements to
Master Street Plan standards for a minor arterial street or
provide in lieu contribution. The majority of this property
is located within the flood zone.
Utility comments
Provide for on-site fire protection, to be implemented at
time of annexation. Contact Little Rock Municipal Water
Works.
Applicant must sign a preannexation agreement and obtain
approval from the City prior to obtaining water service.
Southwestern Bell Telephone requires a 5 foot easement along
all property lines.
.Analysis
Community Fellowship Church is a new congregation, started
on Easter Sunday 1993, which now meets in a members home.
The church currently has a membership 20 to 25 persons. The
church has acquired this 7 acre site and is in a position to
build a facility of its own.
In an effort to present the Commission with a long range,
comprehensive plan, the church has developed a site plan
showing three major phases of the development of a church,
private school and a church camp.
2
FILE NO.: Z-5736 (Continued)
This was done recognizing that it is difficult for a new
church of this size to develop a concrete, long range
development plan and the plan before the Commission is, in
some ways, conceptual.
Phase I of the plan provides for the construction of a
single building containing classrooms and a 125 seat
sanctuary. A corresponding 22 space parking lot taking
access off of a 30 foot gravel access easement will be built
with this phase.
Phase II, which is envisioned as occurring in approximately
3 years, involves the construction of a second building
containing a 250 seat sanctuary and additional classroom
space. Although not shown on the plan, a parking lot
expansion to accommodate the required 63 on-site parking
spaces will be built with this phase.
The proposed private school will be initiated with Phase II.
The school will begin with grades K-6 and will later expand
to include grades 7-12. The private school will have an
enrollment of approximately 60 students.
Phase III, occurring after an additional 3 years, will
consist of the construction of a family life center
containing a gymnasium and dormitory rooms for the proposed
church camp. The proposed dorm rooms will house 60 persons.
A softball field will be constructed either during Phase II
or III. The field will be for day use and will not have any
lighting.
Staff feels that Community Fellowship Church has made a good
faith effort to develop a comprehensive site plan in keeping
with ordinance standards and is willing to concede some
degree of flexibility in the implementation of the plan.
Any major changes will need to be reviewed by the Planning
Commission.
8. Staff Recommendation
Staff recommends approval of this application as filed
subject to:
1. Compliance with the City's Landscape and Huffer
Ordinances
2. Compliance with City Engineer and Utility Comments
3. Adequate on-site parking being provided for all phases
of the development.
r
FILE NO.: Z-5736 Continued
Staff also recommends approval of the request to defer
paving requirements for the parking lot until Phase II
of the development.
SUBDIVISION COMMITTEE COMMENT:
(SEPTEMBER 16, 1993)
Community Fellowship Church was represented. Staff presented the
item and noted the City Engineer and Utility Comments outlined
above.
A discussion then followed concerning the various aspects of the
phasing plan. It was determined that adequate parking must be
provided on the site plan.
Tad Borkowski, of the City Engineer's Office, recommended that
the applicant confer with the County Planning Office regarding
the flood zone issue.
The applicant stated that the church would agree to dedicate any
needed right-of-way but would probably request a waiver of the
required street improvements to Lawson Road.
After further discussion, the Committee determined that there
were no other outstanding issues and forwarded this item to the
full Commission for final resolution.
PLANNING COMMISSION ACTION:
(OCTOBER 5, 1993)
The applicant was present. There were no objectors present.
Staff presented the item and offered a recommendation of
approval.
The Commission was informed that a revised site plan had been
submitted which shows the additional required parking.
The Commission was also informed that the applicant agreed to
dedicate the needed right-of-way but would ask the Board of
Directors to waive the required improvements.
Chairman Walker asked if the City Engineer's Office had an
opinion on the request to waive right-of-way improvements.
Jerry Gardner, of the City Engineer's Office, stated that his
office did not object to the waiver based on the property's
location and the fact that it was not in an urban area that would
see street improvements anytime in the foreseeable future.
4
FILE N Z-5736 C ntinued
The Commission determined that there were no other outstanding
issues and placed this item on the Consent Agenda for approval.
The vote was 8 ayes, 0 noes and 3 absent.
5