into the Chenal Valley development. There were several persons
present offering comments concerning the development potential of
the existing properties they owned or represented which indicated
that the road connection could possibly occur in a short term.
They felt extension of that arterial street to Chenal Parkway
would support the need for a traffic signal for Highway 10 at
Taylor Loop and the possibility of a land use modification of
the Highway 10 Plan.
Specific resolution was not gained on any of the several subjects
discussed; however, the applicants reported they would pursue
resolution of each. The committee then forwarded this item to
the full Commission for final resolution.
December 15, x,92
ITEM NO.: 5 Cont. FILE NO.: 2--5646
13. Identify the large paved apron in the front of the
building as part of the building closed floor space.
14. A treatment plan for the improvement of Forest Lane
should be indicated, if it is to be improved.
15. Remove the concrete access aprons in the curb line along
Highway 10, serving existing driveways.
16. A site lighting plan
E. ANALYSIS•
The staff has performed the usual site visits, plan reviews
and distribution for comment. We have held a meeting with the
developer and his design professionals for purposes of
developing the request to the fullest, in order to gain a base
upon which to base our judgment.
Staff concentrated its analysis in four areas. These were
land use, traffic, site design and building mass.
Land Use
The current Highway 10 Plan indicates transitional and
expansive amounts cf residential. Established commercial
nodes are centered well away from this corner. The intended
commercial use is not compatible with residential. It cannot
be made compatible on this site such as Harvest Foods was
accomplished at the east end of Taylor Loop.
This change would have a major detrimental effect on the plan.
It would make the areas adjacent to the west unsuitable as
residential. The Highway 10 Plan and overlay standards were
written to make nonresidential compatible with residential
through certain use types and increased design standards. The
other commercial nodes such as Candlewood (Kroger) Center are
not this intense.
Traffic Circulation:
Even though a five lane arterial, Highway 10 is not an
interstate. A tremendous amount of truck traffic would have a
negative effect on an already heavily traveled arterial. The
existing nodes on the plan when fully developed will use the
roadway capacity.
Site Design and Building Mass
The building plan offered cannot utilize the existing
landscaping or terrain. The main building will be on
about ten feet of fill. The finished floor elevation of
4
December 15, 19y2
ITEM NO.• 5 Cont. FILE NO.: Z-5545
This site was located at the intersection of two arterial streets
because it will provide easy accessibility for future construction
sites in West Little Rock. This facility is proposed to serve a
market radius of approximately 50 miles involving Perry County,
Saline County and other counties within this radius.
A. PROPOSALIREOUEST:
This application was filed as a planned commercial district in
order to approach the subject of modification of the Highway
10 land use plan and to incorporate an additional commercial
node at two arterial streets. The application is for a major
home center with significant building materials sales and
delivery. The site is a large tract of land currently
residential in nature and surrounded by residential occupancy.
B. EXISTING CONDITIONS:
The property is residential in nature with several residential
structures in place. To the south along a narrow residential
street is a church and several homes. To the west are large
homes on large residential lots. To the east and north are
residential occupancies. The land is rolling terrain with a
pond and several highpoints.
C. ENGINEERINGZUTILITY COMMENTS:
Public Works Department reports that minor arterial
right-of-way and improvements are required for Taylor Loop
Road. Sidewalks are required on Cantrell Road frontage. The
Excavation and Detention Ordinance applies.
Little Rock Water Works reports that on-site fire protection
will be required reflecting the location of fire hydrants and
main sizes.
The Waste Water Utility reports that a sewer main extension
will be required with appropriate easements. This will tie to
the Hinson Interceptor charges apply for this area. Contact
should be made with the Waste Water Utility for detail.
D. ISSUES/LEGAL/TECHNICALZDESIGN:
The staff review of this planned unit development reflects a
number of areas of design concern. Many of these have been
discussed with the applicant with resolution to be gained
prior to the public hearing of the Commission on December 15.
At this writing, these items remain for discussion until the
site plan has been updated to resolve them.
2
� i�
..�..,
�•
• : tx'�
r.�. r�±
,r..,;
,��
m yy��r
a� i
y t�-
• � . T YY
S� ,,..
«��
_ i �t
're
�fi� ry
t }:
.• y
� � i.:C
1
rp
u4
.. ':'�'
. z.
�4
'•.ti
r.