Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Z-5473-A Map 7
PLANT SCHEDULE QTY COMMON NAME BOTANICAL NAME SIZE Turf A1,160 sq yds Bermuda Sod Tiftway' Cynodon dactylon Tiftway' solid sod:free of weeds,debris, & other grasses Groundcover 83 23 6 flats 3 ;mss © 11 A 19 13 A 100 2 A 55 10 18 9 Trees 3 Liriope Siberian Iris Seasonal color Virginia Creeper Burning Bush Carissa Holly Crimson Pygmy Barberry Dwarf Yaupon Holly English Boxwood Gumpo Azalea Kurume Azalea Otto Luykens Needlepoint Holly Crape Myrtle 5 Foster's Holly 4 Red Maple 1 Sweet Bay Magnolia 3 Willow Oak Liriope muscari 'Big Blue' Iris siberica Seasonal color Parthenocissus quinquefolia Euonymus alata 'compactus' Ilex cornuta 'Carissa' Berberis thunbergii 'Atropurpurea Nana' Ilex vomitoria'Nana' Buxus sempervirens Azalea gumpo 'White' Azalea obtusum'Hino d giri' Prunus laurocerasus'Otto Luykens' Ilex cornuta 'Needlepoint' Lagerstroemia indica 'Natchez' Ilex attentuata 'Fosterii' Acer rubrum 'October Glory' Magnolia virginiana Quercus phellos ROUND COVER PLANTS TO BE SPACED ACCORDING TO THE SPACING ON THE PLANT LIST (X) NOT TO SCALE 1 gal., 12" on center 1 gal., 8" o.c. jumbo 6 pack flats 3 gal., train to wall 7 gal 30"-36"min. ht. x 30" min. sprd. 5 gal. 24"-30" ht. x 24" min. sprd. 3 gal. 18"-24" ht. x 18" min. sprd. 5 gal. 24"-30" min. ht. x 24" min. sprd. B&B / 24"-30" min ht. x 24" min. sprd. 5 gal. 24"-30" min. ht. x 24" min. sprd. 5 gal 24"-30" min. ht. x 30" min. sprd. 5 gal 24" -30"n -lin. ht. x 24" min. sprd. 7 gal 30"-36"min. ht. x 30" min. sprd. B&B 8'-10' min. ht. / 5'-6' spread /Tree form 3 or more canes 1 1/4" min cal. each cane B&B 10'-l2' min. ht. / 2" - 2 1/2" min cal. / full B&B 10'-12' min. ht. / 2" - 2 1/2" min cal. B&B 6'-8' min. ht. / 2"- 2 U2" min cal. B&B 6'-8' min. ht. / 2" - 2 1/2" min cal. PROVIDE 8-8-8 FERTILIZER AT 4 LBS. PER 100 SQ. FT. SEE SPECS FOR INSTALLATION 3" DEPTH MULCH (SEE SPECIFICATIONS) GROUND LINE TO BE THE SAME AS AT NURSERY r MIN 18" FOR PLANTS ' UP TO TO" HIG N < BREAK SUB -SOIL WITH PICK AXE LANDSCAPE NOTES A 1) CONTRACTORS ARE RESPONSIBLE FOR UNDERSTANDING AND COMPLYING TO ALL APPLICABLE LOCAL AND STATE CODES INCLUDING OBTAINING ANY REQUIRED PERMITS. 2) CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE EXISTING SITE AND PROPOSED DESIGN PRIOR TO BID SUBMITTAL AND/OR INSTALLATION 3) CONTRACTORS ARE RESPONSIBLE FOR NECESSARY REPAIRS AND/OR REPLACEMENTS FOR DAMAGE TO PROPERTY OR UTILITIES INCURRED DURING INSTALLATION. 4) ALL PLANT MATERIALS ARE TO COMPLY WITH THE APPLICABLE PROVISIONS OF "AMERICAN STANDARDS FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 5) ACTUAL DIMENSIONS MAY VARY ON SITE. 6) SLOPE ALL PLANTING BEDS AWAY FROM BUILDING FOR POSITIVE DRAINAGE. PLANTING SOIL REQUIREMENTS: PROVIDE HOMOGENOUS BACKFILL PLANTING MIXTURE OF 3:1 RATIO TOPSOIL OF SPECIFIED QUALITY AND PEAT MOSS. REMOVE TOP W OF BURLAP FROM ROOTBALL WHEN PRESENT 6) PROVIDE A 3" DEPTH OF TOPSOIL IN ALL SOD AREAS. TOPSOIL SHALL CONSIST OF CLEAN. DARK HUMUS RICH SOIL WITH APPROPRIATE QUANTITIES OF ORGANIC MATTER. TOPSOIL SHALL BE FREE OF WEEDS, ROOTS, STONES AND OTHER FOREIGN MATERIALS. 7) PROVIDE 3" DEPTH OF GROUND HARDWOOD OR CYPRESS MULCH IN ALL PLANTING BEDS. 8) STEEL EDGING SHALL BE HEAVY GAUGE (1/8" x 4") WITH STAKES. 9) TILL POWDERED LIME INTO SOIL FOR ANNUALS AND PERENIALS TO REDUCE ACIDIC CONTENT. 10) PRUNE ALL PLANT MATERIAL NEAR SIDEWALKS TO ACCOMODATE PEDESTRIAN MOVEMENT. ""'DINING PLANTING BED :5" STEEL EDGING E PAINTED BLACK BY MANUFACTURER iH GRADE OF ADJACENT LAWN 21 NOT TO SCALE 2 -PLY REINFORCED RUBBER HOSE WRAP TREES IIF REQUIRED) CONSTRUCT EARTH SAUCER WITH 2" HIGH EARTH BERM FLOOD TWICE WITH WATER IN FIRST 24 HOURS 3" DEPTH MULCH (SEE SPECIFICATIONS) MIN. 9" LAYER OF PLANTING SOIL MIXTURE - FILL PIT WITH WATER AND ALLOW LAYER TO SETTLE PRIOR TO PLANTING BREAK SUB -SOIL WITH PICK AXE. RUSSELL & ROBERTS LTD. 1501 N. UNIVERSITY SUITE 250 LITTLE ROCK, AR 72207 (501) 280-0123 d �PERED STEEL STAKE OC MAIC Iply J (3) DOUBLE STRAND GAV. IJL,/ 12 GUAGE WIRES PER TREE L I S TO BE IN GROUND FOR 2 YEARS NOTE: ALTERNATIVE METHODS OF GUYING MAY BE SUBMITTED FOR REVIEW AND POSSIBLE APPROVAL. REMOVE BURLAP FROM TOP 1,43 OF ROOT BALL. PLANTING MEDIUM TO BE 'SUPER SOILOR APPROVED OTHER GROUND LINE TO BE THE SAME AS THE NURSERY METAL STAKE NOTE: PROVIDE FERTILOME ROOT STIMULATOR AS PER MANUFACTURE'S RECOMMENDATIONS LANDSCAPE ARCHITECTS 1 r 1. qq A L L I S O N A RC'HITECTS .300 Sprang Building Swta 711 Lima lkwk, AR 72201 'id 501 376 0717 Fax 376 1766 �l a=b(yf—*nslodenac R E V I S 1 0 N S A 18 JANUARY 1999 Cc W Z W = U U Cc W L U J Z Q Q Z J Q _ rr Y W Q Y Q = O LL LLI J W J =, Cn p W � U a Cc `rt v J C� C SEAL: k����'. a`\.pN DSC ,c .gyp .• .., °P'•. DAVID = W. ' _= ROBERTS 'me ;yb 198 ti 22 SEPTEMBER 1998 L2