HomeMy WebLinkAboutZ-5472-A Map 4EMERY JARF
WIFE BERNIC
IE - R/W CURVE DATA
n = 93042'21"
T - 26.67'
R - 25.00'
L = 40.89'
CERTIFICATE OF PRELIMINARY SURVEYING
ACCURACY
I, Michael Watson, hereby certify that this plat correctly represents a boundary survey made by
me and all monuments shown hereon actually exist and their location, size, type and material are
correctly shown.
Signed:
Date of Execution B. Michael Watson
Registered Land Surveyor
No. 957, Arkansas
CERTIFICATE OF PRELIMINARY ENGINEERING
ACCURACY
1, Wes Lowder, hereby certify that this plat correctly represents a plat made by me, and that
engineering requirements of the Little Rock Subdivision Rules and Regulations have been
complied with.
Signed:
Date of Execution Wes Lowder
Registered Engineer
No. 4943, Arkansas
CERTIFICATE OF PRELIMINARY PLAT APPROVAL
All requirements of the Little Rock Subdivision Rules and Regulations relative to the preparation
and submittal of a Preliminary Plat have been fulfilled, approval of this plat is hereby granted,
subject .to further provisions of said Rules and Regulations. This Certificate shall expire
Signed:
Date of Execution
Little Rock
Planning Commission
0 30 60
SCALE
PLEASANT VALLEY COUNTRY CLUB
IE - R/W CURVE DATA
0 = 680 25 24"
T = 156.13'
R = 229.63'
L = 274.23'
+ --
u
/ .00
f BUFF LANE (50°R/W)
S8T4*3S2rEN 15.02' MEA;
!- (S 89° 37' E, 15.02' PLAT)
JOHN P. CULLUM
c
15' DRAINAGE 3 UTILITY
30 BUIL
/ I ----
444-
+1
44N PROPOSED LOT I
r
I. S. /
I5' DRAINAGE AND
UTILITY EASEMENT
I.PF.
440 / 1
o -
W
— — --- - - -- -- - - _ / ►-� o
Q
a160' i — of C
00 O/ 25 ACCESS 8UTILITY EASEMEN 87. z O!
- - — _ -
t` 1 --- --- - _ _ I Q
— 2
-n` �
i{ % N> I 0 `V
ti
' U
AA
O
NAGE DITCH
i �—
j Z 30 BUILDING LINE \\ \\
W
a F PLEASANT VALLEY SUBDIVISION
d N- I SECOND INSTALLMENT \ \\
_ ) 1.676 ACRES_
RECORDED /N PLAT BOOK 40, PAGE 26 \ \
N z I PROPOSED L \
o1,
\
Z
Z,I 25 BUILDING LINE
h 15 D (NAGE a UTILITY EASEMENT � r 5'
�. C,- - N 89° 34' 31" W_ _. 241,-5$ - --- -- I� __ RIGH - OF -
I.P.F I.PS. 89'°34 31 333.44 S1
Property Description C ----------
---
Lot
Lot "A", Pleasant Valley Subdivision, Second Installment to the City o Little •k, Pulaski
County, Arkansas Gott T--AINtrJC-r aG
and --._ + -- - - - -
Part of the Southeast 1/4 of the Southwest 1/4 of Section 28, T -2-N, R -13-W, Littl ock, /
Arkansas, Pulaski County, Arkansas, being more particularly described as follow /
Starting at the Southeast corner of the Southeast 1/4 Southwest 1/4 of saiisecn z8;�irence-� C
North 891 West 417.34 feet; thence North 00°19'00" West 40.00 feet to the POINT OF -
BEGINNING; thence continuing North 00°19'00" West 414.83 feet; thence South 89°33'20"
East 296.65 feet to the West right-of-way line of Rodney Parham Road; thence Southerly along BRADY
said West right-of-way line the following six (6) courses and distances: 1) South 11°31'07" West MASONIC
186.90 feet; 2) along a curve W the left having a delta of 02034'44", a tangent of 50.75 feet; a LODGE 753
radius of 2,254.69 feet a chord bearing South 10°13'45" West 101.47 feet; 3) South 08056'23"
West 43.87 feet; 4) North 89°56'46" West 10.32 feet; 5) South 08"39'00" West 63.81 feet; 6)
South 46°00'02" West 42.37 feet to the North right-of-way line Vf Hinson Road; thence along
said North right-of-way line North 88°00'33" West 181.90 feet to the POINT OF BEGINNING
containing 2.414 acres, more or less.
BE DEDICATED
(N89031'W, 333.44 PLAT)
PLANTATION LAND CO., INC.
INLET
3
R5
PROPOSED LOT 2
/W �o
cz
1 ,
N 3
I/'N~ I
I I LRF '
r I.PF I
NW'
10.
15 DRAIN 8 UTILITY EASEMENT✓ /
192'±
F 5.28,SOUTHS 88° (D0' 33"E
96 WEST 33 E 181
SAMUEL ZELL, TRUSTEE
N 890 32 OO'W
/WALTER
8.
IMcANINCH
/ AND
WIFE
RAMONA
S89°38' 18"E
30.58
I SP NDL E
/ FOUND
C.F PLUNKETT AND
WIFE KATHERINE L.
h
SOUTHEAST CORNER SEI/4
SWIM, SECT ION 28 T-2-N,R-13-W �T."""'.,,
�- ISTr R
ARIAS 1 cI,VF rtr'• 11
Z ARKANSAS
REGISTERED Z = 0 NO, q� p
PROFESSIONAL -�w
ENGINEER ) ':�,
! SFS L0WD
✓'� �''�,�C, l;nN�l,.•.
CHARLES J. MENARD
AND WIFE ELIZABETH
O M
T M,
> n
L tf,
U)
a)
C p
QI N
LI r
W
U
i=+ Q u
a
0
•O
N
.r
X
0
%4LZ 0
o
N
DRAWN NY:
APPROVED •Y%
SCALE:
I " = 30'
DATE:
OCTOBER 7, 1993
�l
r1
�7lot
U
—_i
�•
.
-7
I
-'
PROJECT NO.
SHEET NO.