HomeMy WebLinkAboutZ-5468 Map 2w
1�
rrl
Z
T-
4-790
-
4z90
TL
SMH . E L. 99.62
I
I rn_
I\
0
I
I
S �3� 4�E (D)
L'
T.B.M - TOP OF FIRE HYDRANT
ELEV 100 O' ASSUMED
312.72'(D)
0
— — N 80°5320"W (D)
Is
li
FOUND CRIAP TOP u
IRON PIN S 89 's3
78.00' lD)
Q
14.7 (M)
G G G�
W
-P Q
1
P
L.P.
1
� 1
24"OAK I
i
� � QFiPNALT ,'
WESTERN HILLS
UNITED METHODIST
CHURCH
Sidewalk 1 �J
55
I \
_ .. 107\�
W
106
18 PINE A
18"PINE \
4
10- ___ v \
-- 20'PINE
\
_ PP
103
A
544.40'(D)
L.P
Q 1
FENCE
POST
/G
G
Edge of Aspholt
II
G
G /
15"
\ PINE
0
1
\ 15" PINE
co,00
�
15"PINE
18" PINE y J
1 24'. IN
• t \
15 "PINE (
� i o
�O
(EM}�OVE
15�.}M1� 15_P�NE 108 -
R?l.l�` 30"OAK
"PINE
ZEMOVE)
_ _L07
'
15"PINE
/
I
e
C S18"PINE x
—T
FLAG
12"PINE/�
POLE
--103-- CONTOUR ELEVATION
•
0I
POWER POLE
18" PINE x
LIGHT POLE
106e24"OAK
f
12"OAK
x
15"PINE
> • J 24"OAK
00--- --
—NEW AG�PIIALT PAVING
—se
MELBA STREET �-- NEw CoNG'�ETE AI"fcoN
G
EXISTING
FRAME
BLDG.
S w imming Pool Areo
GENERAL NOTES
1. (D) - INDICATES DISTANCES AND BEARING FROM PREVIOUS SURVEYS OF THE
PROPERTY PERFORMED BY G.A. DONHAM.
2. (M) - INDICATES MEASURED VALVES IN THIS SURVEY.
3. A 2" WATER LINE LIES ON THE WEST EDGE OF WESTERN HILLS DRIVE AND A
12" CAST IRON LINE LIES ON THE EAST SIDE. THERE ARE NO LINES ON
I[ELBA DRIVE. A FIRE HYDRANT IS SITUATED AT THE NORTHEAST CORNER OF
THE MELBA -WESTERN HILLS INTERSECTION.
4. A 2" CAST IRON GAS LINE LIES ON THE VEST SIDE OF WESTERN HILLS.
FROM THE 2" IN WESTERN HILLS A lk" PLASTIC LINE (IN 2" ENCASEMENT)
RUNS 67 FEET EAST ALONG THE SOUTH SIDE OF MELBA STREET, THEN
TRANSITIONS INTO A 2" WELDED STEEL LINE AND CONTINUES EASTERLY ALONG
MELBA. A 2" GAS METER LIES 300' (+) NORTH OF THE INTERSECTION OF
MELBA AT WESTERN HILLS.
5. A 1500 - PAIR AERIAL TELEPHONE LINE LIES ON THE EAST SIDE OF WESTERN
HILLS. A 100 - PAIR UNDERGROUND CABLE LIES ON THE NORTH SIDE OF
MELBA DRIVE.
6. THE PROPERTY IS SERVED BY A SANITARY SEWER LINE IN VESTERN HILLS AS
INDICATED ON THIS PLAT.
7. A 13.8 LCV (39) LINE LIES ON THE VEST SIDE OF WESTERN HILLS. A 13.8
ICV (39) LINE RUNS ON THE SOUTH SIDE OF MELBA STREET AS FAR EAST AS
THE CHURCH; A 29 LINE CONTINUES TO THE EAST ALONG MELBA.
RTIFICATION OF SURVEY
I hereby certify that a survey crev of Garver+Garver, PA, did perform a
topographic survey of this piece of real estate and that this plat is an
accurate portrayal of the survey results.
i
William E. Ruck
Ark. Reg. Land Surveyor *903
e �,p�rt7Jeo�
� I311o` ql
x
WATER
TANK
a
Lx_
x�
BROOKS JACKSON ARCHITECTS, INC.
2228 Coffondale Lane • Lne Rock. Arkansas 72202
(501) 664-8700
Brooks Jackson, AVS CSI " Donald Johnson, AIA ASID
•,,.r •tllrr r.,,,
' STATE Oie.
b : ' AHF: ANSF.S
=00 � ti�•�
ell
//1//`•`I C.L. ,
'''�rinnr�r`'�
NO REVISIONS I BY JAPPR.JDATE
WESTERN HILLS UNITED METHODIST CHURCH
LITTLE ROCK ARKANSAS
TOPOGRAPHIC SURVEY
DESIGNED 13Y WEIR
DRAWN BY CHK
CHECKEDBY WER
DATE JUNE,1988
Garver + Garver
Engineers and Planners
Little Rock, Arkansas
�oUALt I"= 20
JOB NO
88-1470-0
SHEET NO
I OF I
LEGEND
—w—
WATER LINE
—G—
GAS LINE
—P—
POWER LINE
—T
— TELEPHONE LINE
—UGP—
UNDERGROUND POWER
--103-- CONTOUR ELEVATION
*PP
POWER POLE
•L.P
LIGHT POLE
•,,.r •tllrr r.,,,
' STATE Oie.
b : ' AHF: ANSF.S
=00 � ti�•�
ell
//1//`•`I C.L. ,
'''�rinnr�r`'�
NO REVISIONS I BY JAPPR.JDATE
WESTERN HILLS UNITED METHODIST CHURCH
LITTLE ROCK ARKANSAS
TOPOGRAPHIC SURVEY
DESIGNED 13Y WEIR
DRAWN BY CHK
CHECKEDBY WER
DATE JUNE,1988
Garver + Garver
Engineers and Planners
Little Rock, Arkansas
�oUALt I"= 20
JOB NO
88-1470-0
SHEET NO
I OF I