Loading...
HomeMy WebLinkAboutZ-5461-A Map 13x 0 Ma <n L� M 0 = o Z Z N w J 8" x4" TEE NISH GROUND SURFACE r�7RACER WIRE TO BE WRAPPED AROUND OUTSIDE OF VALVE BOX. CONTRACTOR TO USE 6" PVC PIPE TO EXTEND VALVE BOXES TO MATCH NATURAL GROUND WITH TOP & BOTTOM OF STANDARD VALVE BOX. TRACER WIRE 4" PVC METER SERVICE DETAIL METER BOX (#MS BCF 17" x30", 12 RL) USE TWO (2) STACKED MID STATE PLASTIC STRAINER 3" BRASS NIPPLE (TYP. EACH END OF METER) u � ------------ -------------- 4- GATE VALVE W/BOX 3" TURBO BADGER CLASS "B" CONCRETE BLOCKING (NOT REQUIRED WITH SWIVEL COUPLING)— PRECAST OUPLING)— PRECAST CONC. BLOCK 4" x15" x15" 1.) DO NOT CONCRETE AROUND CONNECTIONS OF FHIINGS. 2.) WRAP ALL D.I. FITTINGS WITH VISQUEEN BEFORE PLACING CONCRETE BLOCKING TYPICAL BLOCKING FOR FITTINGS �1 NOTE: DO NOT CONCRETE OVER OVER DRAIN OPENINGS. HYDRANT TO BE PLACED WITH NOZZLES FACING THE STREET. NATURAL GROUND //— "'.L HYDRANTS SHALL BE STALLED WITH SWIVEL )UPLING. INCLUDE W/UNIT ZICE OF HYDRANT AND VALVE. FIRE HYDRANT DETAIL STALL 6" GATE VALVE ON ALL tE HYDRANT LEADS. (UNIT PRICE FOR FIRE DRANT ASSEMBLY SHALL INCLUDE 6" GATE LVE (W/BOX) TO BE PLACED ON LEAD) IIVEL ADAPTOR WEEPHOLE •couALT DRIVING SURFACE FINISH GROUND SURFACE TRACER WIRE TO BE WRAPPED AROUND OUTSIDE OF VALVE BOX. CONTRACTOR TO USE 6" PVC PIPE TO EXTEND VALVE BOXES TO MATCH NATURAL GROUND WITH TOP & BOTTOM OF STANDARD VALVE BOX. TRACER WIRE VALVE SETTING DETAIL 'B' CONCRETE NOTES: 1.) CONTRACTOR TO NOTIFY LITTLE ROCK PUBLIC WORKS DEPARTMENT 501-918-3647 PRIOR TO STARTING CONSTRUCTION. 'ILL WITH RED SAND 2.) ALL MATERIALS AND WORKMANSHIP SHALL MEET OR EXCEED THE -.CT TO MODIFIED STANDARDS OF LITTLE ROCK PUBLIC WORKS WATERWORK DIVISION AND OR THE ARKANSAS DEPARTMENT OF HEALTH. EXISTING STREET CUT & REPLACE DETAIL CAREFULLY BACKFILL CRUSHED S " MIN., 6" MAX. CLASS 'B' BEDDING DETAIL 3.) FINAL PAYMENT WILL NOT BE MADE BY THE OWNER UNTIL A LETTER OF ACCEPTANCE IS ISSUED BY THE LITTLE ROCK PUBLIC WORKS DEPARTMENT. 4.) THE CONTRACTOR WILL WARRANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE. JOB. No. 2764 B Bond Consulting Engineers Prepared For: SCALE: N.T.S. DRAWN BY: DSC 2601 T.P. White Dr. DON RENSHAW MABELVALE WEST STREET IMPROVEMENT WATER LINE DETAILS DATE: JULY 2001 620 EAST MARKHAM MABELVALE JUNIOR HIGH SHEET ELITTLE ROCK, ARKANSAS 72201 MABELVALE, ARKANSAS of Jacksonville, Arkansas 4 4