HomeMy WebLinkAboutZ-5434-B Staff AnalysisOctober 31, 1995
ITEM N 14 FILE NO.: Z- 4 4-B
pWNERIAPPLICANT:
El R () P Q3 AL 1.
ORDINAIN E DESIGN STANDARDS:
1. Site Lac tion:
Rose of Sharon Baptist Church -
Conditional Use Permit
1400 S. Cross
Rose of Sharon Baptist Church by
Arthur Blood, Pastor
A conditional use permit is
requested to allow for the
expansion of an existing church
building and the construction of a
parking lot on this C -3/R-4 zoned
property.
The church site is located on the southwest corner of West
14th Street and Cross Street.
2, coin -pa ibility with Neirthborhood:
Surrounding uses include: commercial and church to the
north, commercial and two single-family residences to the
east, and single family residences to the west and south.
The proposed expansion of the building and new parking lot
appear to be compatible with the neighborhood.
3. on -Site -Drives and Parking:
The church is nonconforming in relationship to its parking
requirements. on February 27, 1995, the church received a
zoning variance for the construction of a new sanctuary,
which will increase the seating capacity from 140 to 200.
This requires an additional 15 on-site parking spaces. The
area proposed for the new parking lot will accommodate in
excess of 15 vehicles.
4. sQroeninq andB ff r :
Compliance with the City's Landscape and Buffer Ordinances
is required.
The site plan submitted does not allow for the 10 foot wide
buffer required along the northern and southern site
perimeters. The minimum requirement is 6 1/2 feet when
buffer areas are transferred to another area of the site.
October 31, 1995
kSUBDIVIS1Q
ITEM N 14(Cont.)FILE N Z- 4 4-B
Also, the minimum buffer requirement along Cross Street is 6
feet.
A 6 foot high opaque screen is required along the southern
property line. This screen may be a wooden fence with its
face side outward or evergreen shrubs 30 inches in height at
planting spaced every 3 feet.
The Landscape Ordinance requires a 6 foot (4 feet with
transfer) landscape strip along the northern, southern and
eastern site perimeters. Also, it requires that 6% of the
vehicular use area be landscaped within the parking lot
itself. Additionally, a 3 foot wide building landscape
strip between the public parking and building is required.
Some flexibility with the building landscaping is allowed.
Curb and gutter or another approved border will be required
to protect landscaped areas from vehicular traffic:
5. Cit Enaineer`s Comments:
Dedicate 20 foot corner radial area for public right-of-way.
Improve corner radius to 25 feet at intersection. Improve
sidewalk where damaged and install ramps at alley and
intersection. Public Works recommends elimination of spaces
off alley. Stormwater detention analysis is required with
paving. City standard concrete aprons are required.
Parking spaces that are head -in to right-of-way without a
buffer require wheel stops 2.5 feet from the right-of-way
line.
6. Utility Commentg:
Sewer main located on north portion of lot and in alley.
Contact Little Rock Wastewater Utility for details.
7. Staff AnalYsia:
Rose of Sharon Baptist Church requests a conditional use
permit to allow the expansion of its existing church
building and construction of a parking lot on the two lots,
zoned R-4, immediately south of their site. A 30' X 40'
addition is proposed on the south side of the building,
extending onto the R-4 zoned lot. The proposed parking lot
will accommodate approximately 29 vehicles, which will prove
beneficial in getting vehicles off the surrounding
neighborhood streets. The proposed new parking lot must be
designed in compliance with the design criteria outlined in
section 36-511 of the Zoning Ordinance, and must comply with
the City's Landscape and Buffer Ordinances.
E
October 31, 1995
SUBDIVISION
ITEM NO.: I4 C n FILE NO.: Z-54 4-B
8. ion:
Staff recommends approval of the application subject to the
following conditions:
1. All parking areas must be in compliance with the design
criteria outlined in Section 36-511 of the City's
Zoning Ordinance.
2. Compliance with the City's Landscape and Buffer
Ordinances
3. Compliance with the City Engineer's Comments
4. Compliance with utility Comments
SUBDIVISION COMMITTEE -COMMENT: (OCTOBER 12, 1995)
The applicant was not present.
Staff presented the item. There was a brief discussion of the
Public Works Comments.
Additional discussion included the designs of parking area,
landscaping and screening.
The Committee accepted the presentation and forwarded the issue
to the full Commission for final action.
PLANNING COhIl+ISSxON ACTION:
(OCTOBER 31, 1995)
The Staff presented a positive recommendation on this application
as there were no further issues for resolution. There were no
objectors present.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval. A motion to that effect
was made. The motion was passed by a vote of 9 ayes, 0 nays and
2 absent.
3