Loading...
HomeMy WebLinkAboutZ-5426-A Map 13/4" WATER SERVICE \ L�. WATER METER 4" WASTE LINE TO SEWER MAIN MANHOLE 129'-0" 162'-0" a0f 8ktgp p R�-IlvG Sp;4 373.26' PROPERTY LINE O / fi 30' R.O.W. EASEMENT / GAS SERVICE Asp IV -4 eq v T pp 4fg/y 4 aq G sp4Cf O 0 ua 133.87' 8" WATER LINE FIRE HYDRANT O 10 0 / ASP l !9a VIN T/ / 4 a"IG Q/ was T ZNG v /kk � /QQ / CL 4z V � 86 •co a0f 8ktgp p R�-IlvG Sp;4 373.26' PROPERTY LINE O / fi 30' R.O.W. EASEMENT / GAS SERVICE Asp IV -4 eq v T pp 4fg/y 4 aq G sp4Cf O 0 ua 133.87' 8" WATER LINE FIRE HYDRANT O SITE NOTES 1. VERIFY ALL PROPERTY LINE LOCATIONS AND DIMENSIONS PRIOR TO LAYOUT OF BUILDING AND CONSTRUCTION. SEE ANCHOR BOLT PLAN OR ARCHITECTURAL PLAN FOR DIMENSIONS NOT SHOWN ON THIS PLAN. 2, SEE ARCHITECT FOR EXISTING GRADES AND SITE CONDITIONS NOT INDICATED ON THIS PLAN. 3. IN GENERAL, SLOPE FINISH GRADES FROM 1'-0" BELOW FINISH FLOOR ELEVATION AWAY FROM BUILDING IN ALL DIRECTIONS TO INSURE DRAINAGE OF STORMWATER AWAY FROM BUILDING. IF UNCLEAR VERIFY SITE GRADING CONCEPT WITH ARCHITECT. 4. REMOVE CONSTRUCTION DEBRIS FROM ALL AREAS OF THE SITE UPON CONSTRUCTION COMPLETION AND PRIOR TO ARCHITECT'S FINAL INSPECTION. 5. CARE SHALL BE TAKEN TO PROTECT ALL EXISTING TREES, SHRUBS, AND LANDSCAPE FEATURES TO REMAIN. REMOVE TREES ONLY AS INDICATED ON THE DRAWINGS OR AFTER APPROVAL OF THE ARCHITECT. 6, ALL WORK SHALL CONFORM TO APPLICABLE LAWS, CODES, ORDINANCES AND RULES OF THE CITY, COUNTY, STATE AND FEDERAL AGENCIES HAVING JURISDICTION. 7. CONNECTING SUBCONTRACTOR SHALL VERIFY LOCATION, SIZE AND TYPE OF EXISTING UTILITY SERVICES. THE SUBCONTRACTOR SHALL PAY CONNECTION FEES AND MAKE CONNECTIONS AS REQUIRED, ALL DEPOSITS REQUIRED FOR FUTURE BILLING SHALL BE PAID BY THE OWNER. S. CURB CUTS, DRIVEWAY APRONS AND DRAINAGE CULVERTS SHALL CONFORM TO CITY ORDINANCE OR HIGHWAY DEPARTMENT STANDARDS. CONSTRUCT STREET/DRIVE TRANSITION AS SMOOTH AS POSSIBLE. 9. ALL WALKS SHALL BE SMOOTH FINISH CONCRETE UNLESS OTHERWISE INDICATED ON THE DRAWINGS (CONCRETE SHALL BE 3,000 PSI CONCRETE). 10: DRIVEWAY AREAS SHALL BE SMOOTH FINISH ASPHALT PAVING UNLESS OTHERWISE INDICATED ON THE DRAWINGS 16" GRAVEL BASE AND 2" HOT MIX ASPHALT). 11. ASSUMED SOIL BEARING PRESSURE UNDER ALL WALKS, DRIVES AND BUILDING AREAS IS 3,000 PSF (CONTRACTOR SHALL VERIFY). IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REMOVE AND REPLACE UNACCEPTABLE SOIL WITH SOIL THAT WILL BEAR. 12. PROVIDE RAMPS FOR TRANSITION FROM WALKS TO DRIVES AND PARKING LOT ELEVATIONS (MAXIMUM SLOPE 1" IN 1211). ACCESSIBLE PARKING SHALL BE PROVIDED AS INDICATED AND SHALL BE MARKED AS PER A.D.A. REGULATIONS. ry�I ELECTRIC SERVICE ry�0 (OVERHEAD) ELECTRIC TRANSMISSION LINE (OVERHEAD) 40'-9" i / SITE PLAN 1" = 20'_0" LITTLE ROCK PLANNING COMMISSION APPROV , SUBJECT TO THE CONDITIONS AS NOTED IN THE PLANNING jMMI SION MINUTE RFC RD AT BY: vni DATE: oil I . • C I I 0 1 40 SITE NOTES 1. VERIFY ALL PROPERTY LINE LOCATIONS AND DIMENSIONS PRIOR TO LAYOUT OF BUILDING AND CONSTRUCTION. SEE ANCHOR BOLT PLAN OR ARCHITECTURAL PLAN FOR DIMENSIONS NOT SHOWN ON THIS PLAN. 2, SEE ARCHITECT FOR EXISTING GRADES AND SITE CONDITIONS NOT INDICATED ON THIS PLAN. 3. IN GENERAL, SLOPE FINISH GRADES FROM 1'-0" BELOW FINISH FLOOR ELEVATION AWAY FROM BUILDING IN ALL DIRECTIONS TO INSURE DRAINAGE OF STORMWATER AWAY FROM BUILDING. IF UNCLEAR VERIFY SITE GRADING CONCEPT WITH ARCHITECT. 4. REMOVE CONSTRUCTION DEBRIS FROM ALL AREAS OF THE SITE UPON CONSTRUCTION COMPLETION AND PRIOR TO ARCHITECT'S FINAL INSPECTION. 5. CARE SHALL BE TAKEN TO PROTECT ALL EXISTING TREES, SHRUBS, AND LANDSCAPE FEATURES TO REMAIN. REMOVE TREES ONLY AS INDICATED ON THE DRAWINGS OR AFTER APPROVAL OF THE ARCHITECT. 6, ALL WORK SHALL CONFORM TO APPLICABLE LAWS, CODES, ORDINANCES AND RULES OF THE CITY, COUNTY, STATE AND FEDERAL AGENCIES HAVING JURISDICTION. 7. CONNECTING SUBCONTRACTOR SHALL VERIFY LOCATION, SIZE AND TYPE OF EXISTING UTILITY SERVICES. THE SUBCONTRACTOR SHALL PAY CONNECTION FEES AND MAKE CONNECTIONS AS REQUIRED, ALL DEPOSITS REQUIRED FOR FUTURE BILLING SHALL BE PAID BY THE OWNER. S. CURB CUTS, DRIVEWAY APRONS AND DRAINAGE CULVERTS SHALL CONFORM TO CITY ORDINANCE OR HIGHWAY DEPARTMENT STANDARDS. CONSTRUCT STREET/DRIVE TRANSITION AS SMOOTH AS POSSIBLE. 9. ALL WALKS SHALL BE SMOOTH FINISH CONCRETE UNLESS OTHERWISE INDICATED ON THE DRAWINGS (CONCRETE SHALL BE 3,000 PSI CONCRETE). 10: DRIVEWAY AREAS SHALL BE SMOOTH FINISH ASPHALT PAVING UNLESS OTHERWISE INDICATED ON THE DRAWINGS 16" GRAVEL BASE AND 2" HOT MIX ASPHALT). 11. ASSUMED SOIL BEARING PRESSURE UNDER ALL WALKS, DRIVES AND BUILDING AREAS IS 3,000 PSF (CONTRACTOR SHALL VERIFY). IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REMOVE AND REPLACE UNACCEPTABLE SOIL WITH SOIL THAT WILL BEAR. 12. PROVIDE RAMPS FOR TRANSITION FROM WALKS TO DRIVES AND PARKING LOT ELEVATIONS (MAXIMUM SLOPE 1" IN 1211). ACCESSIBLE PARKING SHALL BE PROVIDED AS INDICATED AND SHALL BE MARKED AS PER A.D.A. REGULATIONS. ry�I ELECTRIC SERVICE ry�0 (OVERHEAD) ELECTRIC TRANSMISSION LINE (OVERHEAD) 40'-9" i / SITE PLAN 1" = 20'_0" LITTLE ROCK PLANNING COMMISSION APPROV , SUBJECT TO THE CONDITIONS AS NOTED IN THE PLANNING jMMI SION MINUTE RFC RD AT BY: vni DATE: oil I . • C I REVISIONS 01/17/00 11/26/99 ci SHEET Of I 1 Ld CL 0 86 •co • Ld o i a . ca DE REVISIONS 01/17/00 11/26/99 ci SHEET Of