HomeMy WebLinkAboutZ-5425-A Staff AnalysisMarch 28, 2002
ITEM NO.: 9
FILE NO.: Z -5425-A
NAME: Irwin Specialized Construction Site Plan Review
LOCATION: The north end of Warehouse Road
nV..VF'T.nPF.R
ENGINEER -
John Irwin Laha Engineers
709 Spruce Street P.O. Box 190251
Heber Springs, AR 72543 Little Rock, AR 72219
AREA: 4.19 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: C-4
ALLOWED USES: Open Display District
PROPOSED ZONING: C-4
PROPOSED USE:
Storage of mobile office units
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The Board of Directors passed Ordinance No. 16,055 on June 18,
1991 rezoning the property from R-2, Single-family to C-4, Open
Display and OS, Open Space. As a condition of approval there
was to be no expansion of the existing gravel turnaround or new
construction to take place on the property without a site plan
review by the Planning Commission. The applicant was to
maintain a 100 -foot open space strip along the north property
line.
March 28, 2002
SUBDIVISION
ITEM NO.: 9 (Cont.
A. PROPOSAL/REQUEST:
FILE NO.: Z -5425-A
The applicant is proposing to store metal mobile office
units on the site. The units will be offered as rental
units and will be moved into and out of the site as the
units are leased and returned. The applicant proposes the
office modules to range in size from 8 -foot by 10 -foot to a
maximum size of 8 -foot by 32 -foot. The maximum number of
units to be stored on the site will be 50 units. The units
range in weight from 2200 pounds to 12000 pounds. There is
a 100 -foot zoned Open Space buffer along the northern edge
of the property.
B. EXISTING CONDITIONS:
The site is located at the north end of Warehouse Road
which takes access from the I-30 Frontage Road. The site
is vacant and undeveloped. The northern portion of the
site is tree covered. Single-family homes are located
across a creek to the north (Town and Country Subdivision).
A single-family house adjoins the site to the south also
taking access from Warehouse Road. To the east of the site
are single-family homes and a trucking company. To the
west of the site is vacant tree covered land. Although,
there are single-family homes in the area, a large majority
of the uses which take access from the I-30 Frontage Road
are either non-residential uses or undeveloped at this
time.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several
informational phone calls concerning this application. All
property owners within 200 feet of the site, all residents
within 300 feet of the site who could be identified and the
Southwest United for Progress and Town and Country Estates
Neighborhood Associations were notified of the Public
Hearing.
2
March 28, 2002
SUBDIVISION
ITEM NO.: 9 (Cont.)
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
FILE NO.: Z -5425-A
1. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
2. Storm water detention ordinance applies to this property.
3. Easements shown for proposed storm drainage are required.
4. Tracking of mud or gravel onto street is prohibited.
5. Existing topographical information at maximum 5 -foot
contour interval and the 100 -year base flood elevation
will be required.
6. A Sketch Grading and Drainage -Plan will be required per
Sec. 29-186 (e) .
7.A Grading Permit will be required per Sec. 29-186 (c) &
(d) .
8. Contact the USACE-LRD for approval prior to start of
work. This is above the limit of study for the flood
zone, but Operations has reported that the natural stream
flowing through the property is being filled.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: There is an existing 10 -inch sewer main
crossing property. No permanent structure can be
constructed over the easement. Contact Little Rock
Wastewater Utility for details at 376-2903.
ENTERGY: No comment received.
ARK?•A: No comment received.
Southwestern Bell: No comment received.
Water: The Little Rock Fire Department needs to evaluate
this site to determine whether additional public and/or
private fire hydrant(s) will be required. If additional
fire hydrant(s) are required, they will be installed at
the Developer's expense. A water main extension will be
required in order to provide water service to this
parcel.
Fire Department: Place fire hydrants per ordinance.
Contact Dennis Free at 918-3752 for details.
3
March 28, 2002
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z -5425-A
County Planning: No comment received.
CATA: Site is not located on a dedicated Bus Route and
has no effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
City Recognized Neighborhood Action Plan:
The area lies in the 65th Street West Neighborhood Action
Plan area, which is currently under development.
Landscape Issues:
It will be necessary to provide a 6 -foot high opaque screen
along the western perimeter of the site. This screen may
be a wooden fence with its face side directed outward, a
wall or dense evergreen plants. The land use buffer,
average width required along the western perimeter is 28 -
feet.
Building Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT:
(March 7, 2002)
Mr. John Irwin was present representing the application.
Staff presented the item and noted some additional
information needed to complete the application (days and
hours of operation, number of modules to be stored). Staff
stated the applicant would be required to place a six-foot
screen or fence along the western perimeter of the property
to screen the adjacent residentially zoned property.
Public Works comments were addressed. The applicant stated
the access to the property would be obtained from the
adjacent property owner. He also stated, he would request
from the Commission to be allowed the use of a gravel
surface for storage. He stated there would be a 200 foot
paved buffer between the parking area and the street to
eliminate the tracking of mud and gravel.
4
March 28, 2002
SUBDIVISION
ITEM NO.: 9 (Cont.)
FILE NO.: Z -5425-A
Staff stated the applicant would be required to protect the
100 foot buffer (zoned OS) on the north edge of the
property.
The Committee determined there were no other issues
associated with the propose site plan. The Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff on March
13, 2002. The revised plan addressed most of the issues
raised by staff and the Subdivision Committee. The revised
plan indicated a 6 -foot chain link fence with three strands
of barbwire on top of the fence. The applicant has stated
all site lighting will be low level and directed away from
residentially zoned property.
The applicant proposes the days and hours of operation to
be 7:30 am to 5:00 pm Monday through Friday. The applicant
has stated there will be no'customer traffic to the site.
The proposed surface material of the storage area will be
SB -2 gravel. The applicant proposes a 200 -foot asphalt
drive leading into the site to eliminate the concern of
tracking mud and gravel from the site to the roadway. The
applicant has also provided verification of an access
easement from the end of Warehouse Road to the properties
edge.
The applicant proposes a 1.38 -acre natural area in the low-
lying portion of the property to be used for holding flash
storm water. The parking will not be an asphalt surface
eliminating some of the flash flooding concern. The
applicant has also stated there will be no change to the
natural stream and the stream will be protected with a silt
fence. The natural area is currently zoned OS (100 -foot
buffer adjacent to the north property line).
The applicant is proposing the placement of a 28 -foot
opaque screen along the western perimeter to protect the
residentially zoned property to the west.
Staff is supportive of the request to allow storage of
61
March 28, 2002
SUBDIVISION
ITEM NO.: 9 (Cont.
FILE NO.: Z -5425-A
mobile office units on the site. The units will be moved
during normal business hours and should not cause any
adverse impact to the neighborhood. The site is shown on
the Future Land Use Plan as Commercial. The property is
zoned C-4, Open Display and the proposed use is consistent
with allowable uses under this zoning classification.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the proposed site plan subject
to compliance with the conditions outlined in Paragraphs D,
E and F of this report.
PLANNING COMMISSION ACTION: (MARCH 28, 2002)
The applicant was present representing the application. There
were no objectors present. Staff presented the item with a
recommendation of approval subject to compliance with the
conditions outlined in the "Staff Recommendation" above.
There was no further discussion. The application was place on
the Consent Agenda for approval as recommended by staff. The
vote passed by 7 ayes, 0 noes and 4 absent.