HomeMy WebLinkAboutZ-5405-B Staff AnalysisOctober 18, 2001
ITEM NO.: 5 FILE NO.: Z -5405-B
NAME: Arkansas Baptist School - Revised Conditional Use Permit
LOCATION: 8400 Ranch Boulevard
DEVELOPER:
ENGINEER:
Arkansas Baptist School System White-Daters and Associates
62 Pleasant Valley Drive 24 Rahling Circle
Little Rock, AR Little Rock, AR 72223
AREA: 20.9 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2 ALLOWED USES: School
PROPOSED USE:
School with expansion
VARIANCES/WAIVERS REQUESTED:
1. A variance from the buffer and screening requirements along
the north property line.
BACKGROUND:
On February 12, 1991, the Planning Commission approved a
conditional use permit to allow for the development of a
junior/senior high school campus on this property for the
Arkansas Baptist School System. The approved plan included a
school building, paved parking areas, and football and baseball
fields. On January 21, 1999, the Planning Commission approved a
revised conditional use permit, which allowed the Summit Church
to hold church services in the existing school facilities. No
new construction was proposed with this application.
A. PROPOSAL/REQUEST:
The applicant, Arkansas Baptist School System, requests a
revised conditional use permit to allow for the expansion of
the existing school campus. The proposed expansion will
take place as follows:
October 18, 2001
ITEM NO.: 5 (Cont.)
FILE NO.: Z -5405-B
■ Phase I - A 32,000 square foot (maximum) elementary
School building (2 story) with associated paved parking
and pick-up/drop-off areas.
• Phase II - A 36,000 square foot (maximum) classroom
addition (2 story) to elementary school building.
• Phase III - A 14,000 square foot (maximum)
multi-purpose building (2 story) addition with
seating capacity of 300 persons.
• An elementary playground and a practice field (not
lighted) will also be incorporated into the
development.
The elementary school component of the school campus will
have a total of 26 classrooms. There are 51 new paved
parking spaces proposed to serve the elementary school
phase, with additional paved area for drop-off/pick-up
vehicular stacking. The hours of operation will be from
7:30 am to 5:00 pm, Monday - Friday, with occasional special
events. The applicant also notes that the proposed building
will not exceed 35 feet in height.
The applicant is requesting a variance to allow a reduced
land use buffer and eliminate the screening fence
requirement along the north property line adjacent to the
elementary school phase of the school campus. A portion of
the proposed practice field, playground area and a corner of
the proposed building extends into the required buffer.
The proposed site plan shows a ground -mounted sign along the
east side of the entrance drive from Ranch Boulevard. The
applicant notes that the sign will have a maximum height of
six (6) feet and a maximum area of 57 square feet.
B. EXISTING CONDITIONS:
There is an existing school building located within the
southern portion of the property, with associated paved
parking areas. There is a football field and a baseball
field located within the western portion of the site. The
area of the site proposed for the elementary school
expansion is undeveloped, with some clearing and grading
having taken place. There is undeveloped R-2 zoned property
to the north and west, with single family residences to the
northeast. There is undeveloped MF -18 zoned property across
Ranch Boulevard to the east and office uses immediately
south of the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational
phone calls pertaining to this application. All owners of
property located within 200 feet of the site, all residents
within 300 feet of the site who could be identified, and the
2
October 18, 2001
ITEM NO.: 5 (Cont.
FILE NO.: Z -5405-B
Johnson Ranch, Bayonne Place and Aberdeen Court Neighborhood
Associations were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
2. Repair or replace any curb and gutter or sidewalk that is
damaged in the public right-of-way prior to occupancy.
3. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
4. Grading permit will be required on this development.
5. Storm water detention ordinance applies to this property.
6. Redesign entrance to eliminate conflicting turns.
Contact Bill Henry for details.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comment received.
ARKLA: No Comment received.
Southwestern Bell: No Comment received.
Water: An acreage charge of $300 per acre applies in
addition to normal charges. The placement of proposed
fire hydrants must be approved by the Little Rock Fire
Department.
Fire Department: No Comment.
County Planning: No Comment.
CATA: Project site is not located on a dedicated bus route
and has no effect on bus radius, turnout and route.
F. Landscape Issues:
The drainage and utility easement area cannot count toward
fulfilling the required 50 -foot wide (average width) land
use buffer along the northern perimeter. The minimum width
allowed at any given point is 9 feet.
3
October 18, 2001
ITEM NO.: 5 (Cont.) FILE NO.: Z -5405-B
The land use buffer along the eastern perimeter drops below
the minimum width allowed of 9 -foot.
A 6 -foot high opaque screen, either a wooden fence with its
face side directed outward or dense evergreen plantings, is
required along the northern and eastern perimeters of the
site.
An irrigation system to water landscaped areas will be
required.
A 3 -foot wide landscape strip between the public parking
areas and buildings is required. However, considerable
flexibility with this requirement is allowed.
Prior to a building permit being issued, a landscape plan
stamped with the seal of a Registered Landscape Architect
will be required.
G. SUBDIVISION COMMITTEE COMMENTS: (SEPTEMBER 27, 2001)
Joe White and Bill Windall were present, representing the
application. Staff briefly described the revised
conditional use permit, noting that some additional
information needed to be shown on the site plan.
The Public Works requirements were discussed, specifically
the requirement to redesign the entrance from Ranch
Boulevard for the elementary school phase. Tad Borkowski,
of Public Works, explained that the entrance area needed to
be redesigned to eliminate conflicting turns. Joe White
discussed using traffic cones to control the traffic flow
during peak traffic times. The Committee suggested using
gates to control the traffic flow. It was suggested that
Mr. White meet with the City's traffic engineer and resolve
the entrance issue. Mr. White indicated that he would
attempt to resolve the issue.
The landscape requirements were also discussed. Bill Hall,
of the Planning staff, explained the requirements. The
required buffer along the northern perimeter was the main
topic of discussion. Mr. White noted that he would also
attempt to resolve this issue. Staff noted that a variance
could be requested, if needed.
4
October 18, 2001
ITEM NO.: 5 (Cont.) FILE NO.: Z -5405-B
After the discussion, the Committee forwarded the revised
conditional use permit to the full Commission for final
action.
H. ANALYSIS:
The applicant submitted a revised site plan on October 3,
2001. The revised plan addresses some of the issues as
raised by the Subdivision Committee. The applicant has
noted building height, dumpster area, sign location and
fencing information on the site plan. The required land use
buffer width and screening along the east property line have
also been provided.
The site plan shows a total of 51 parking spaces for this
phase of the school campus. A minimum of 26 spaces is
required by ordinance. Staff supports the parking plan as
proposed.
As noted in paragraph A., the applicant is requesting a
variance to allow a reduced land use buffer and to eliminate
the screening fence requirement along the north property
line of the elementary school phase of the school campus. A
portion of the practice field, playground area and a corner
of the proposed building extends into the 50 foot wide
required buffer. There is an 80 foot wide utility and
drainage easement along the north property line, which is
heavily wooded. This utility and drainage easement cannot
count toward the buffer requirement according to Ordinance.
Staff feels that the variance request is justified based on
the fact that structural improvements within this buffer
area will be very minimal and the 80 foot wide utility and
drainage easement is densely vegetated. Staff feels that if
a utility company or the City clears the utility and
drainage easement area to install new lines or drainage
improvements, the applicant must construct the required
screening fence along this property line.
To staff's knowledge, the applicant has not yet met with the
City's traffic engineer to redesign the entrance area from
Ranch Boulevard. As noted at the Subdivision Committee
meeting, the entrance area needs to be redesigned to
eliminate conflicting turning movements. Staff will attempt
to resolve this issue prior to the public hearing.
5
October 18, 2001
ITEM NO.: 5 (Cont.)
FILE NO.: Z -5405-B
Aside from the entrance area redesign issue, there should be
no outstanding issues associated with this application.
Staff feels that the addition of the elementary school phase
to this overall school campus will have no adverse impact on
the general area.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the revised conditional use
permit subject to the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report. _
2. Any site lighting must be low-level and directed away
from adjacent residential property.
3. The dumpster area must be screened on three (3) sides
with an eight (8) foot high opaque fence or wall.
4. The proposed ground -mounted sign will have a maximum
height of six (6) feet and a maximum area of 57 square
feet.
5. Staff recommends approval of the variance to reduce the
land use buffer and eliminate the screening requirement
along the north property line of the elementary school
phase, as noted in paragraph H. of this report. If the
80 foot wide utility and drainage easement along the
north property line is ever cleared, eliminating the
natural vegetative screen, a six (6) foot high opaque
screening fence must be constructed to provide the
required screening of the R-2 zoned property to the
north.
6. The issue relating to redesign of the entrance area from
Ranch Boulevard must be resolved.
PLANNING COMMISSION ACTION: (OCTOBER 18, 2001)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
Staff noted that the applicant had met with the City's Traffic
Engineer and redesigned the entrance area to the elementary
school phase, eliminating conflicting turning movements.
6
October 18, 2001
ITEM NO.: 5 (Cont.
FILE NO.: Z -5405-B
The Chairman placed this item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote of
9 ayes, 0 nays and 2 absent.
7