Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Z-5403 Map 4
Material Legend NEW FACE BRICK MATCH EXISTING CONCRETE BLOCK -SECTION CONCRETE BLOCK LAN CONCRETE IN SECTION METAL STUD STUCCO INSULATIVE FILL EXISTING WALL METAL ROCK FILL EARTH FILL ® WOOD ROUGH WOOD FINISHED Abbreviations A F F ABOVE FINISH FLOOR C LG CEILING C J CONTROL JOINT CONC CONCRETE CONT CONTINUOUS C L 0 CLOSET OTL DETAIL EWC ELECTRIC WATER COOLER E J EXPANSION JOINT EXIST EXISTING FD FLOOR DRAIN F E C FIRE EXTINGUISHER CABINET FLR FLOOR GALV GALVANIZED GA GAUGE LAV LAVATORY MAS MASONRY NIC NOT IN CONTRACT NTS NOT TO SCALE OPG OPENING REQ REQUIRED Symbol Legend DOOR 9 FRAME W -HARDWARE SEE SCHEDULE SET NUMBER DETAIL NUMBER -3 SHEET NUMBER aWINDOW TYPE SEE SCHEDULE ROOM NUMBER I*4:FINISH 9LETTER SEE FINISH SCHEDULE CEILING HEIGHT FURNACE ELEVATION C LETTER A SHEET NUMBER SHT SHEET SIM SIMILAR STO STORAGE TNR THRESHOLD TYP TYPICAL UR URINAL VCT VINYL COMPOSITION TILE: WSCT WAINSCOT W C WATER CLOSET WWF WELDED WIRE FABRIC DRAWINGS AND PROJECT MANUAL APPROVED AND IDENTIFIED AS PARTS OF THE OFFICIAL CONTRACT DOCUMENTS OWNER FELLOWSHIP BIBLE CHURCH FACILITY LEARNING CENTER ADDITION/ RENOVATION LOCATION: LITTLE ROCK, ARKANSAS BY - DATE Y -DATE - GENERAL CONTnRACTOR: ADDRESS= BY: DATE ARCHITECT: LEWIS,ODOM,ELLIOTT 81STUDER ARCHITECTS, INC. ADDRESS: 11225 HURON LANE, SUITE 104, LITTLE ROCK,ARK.72211 BY: DATE: PROJECT NUMBER 9005 DRAWINGS AND PROJECT MANUAL DATED 8/15/90 LEARNING CENT. ADD./ RENO. FELLOWSHIP BIBLE CHURCH LITTLE ROCK, INDEX OF DRAWINGS T- I TITLE SHEET, INDEX OF DRAWINGS,SITE PLAN A- I DOOR,WINDOW, FINISH SCHEDULES AND MILLWORK ELEVATIONS A- 2 BASEMENT FLOOR PLAN A- 3 FIRST LEVEL FLOOR PLAN A-4 Ex�!� AePIA-IAL7 oyC lJcs. SECOND LEVEL FLOOR PLAN A- 5 EXTERIOR ELEVATIONS A- 6 WALL SECTIONS AND DETAILS A- 7 STAIR PLANS AND DETAILS A- 8 BASEMENT AND FIRST LEVEL REFLECTED CEILING PLANS A-9 .G�vG' � SECOND LEVEL REFLECTED CEILING PLAN A -10 a DETAILS A - I I ROOF PLAN AND DETAILS S- I FOUNDATION AND FIRST FLOOR FRAMING PLANS S-2 FOUNIDATION DETAILS S-3 SECOND FLOOR AND ROOF FRAMING PLANS S-4 STRUCTURAL DETAILS P- I PLUMBING PLAN BASEMENT LEVEL P- 2 PLUMBING PLAN FIRST LEVEL P - 3 PLUMBING PLAN SECOND LEVEL P - 4 RISER DIAGRAM'S M- I MECHANICAL PLAN BASEMENT LEVEL M-2 MECHANICAL PLAN FIRST LEVEL M-3 MECHANICAL PLAN SECOND LEVEL E- I LIGHTING PLAN BASEMENT LEVEL E - 2 LIGHTING PLAN FIRST LEVEL E - 3 LIGHTING PLAN SECOND LEVEL E- 4 POWER PLAN BASEMENT LEVEL AND UTILITIES SITE PLAN E - 5 POWER PLAN FIRST FLOOR E - 6 POWER PLAN SECOND LEVEL E - 7 SYSTEMS PLAN BASEMENT LEVEL E - 8 SYSTEMS PLAN FIRST LEVEL E - 9 SYSTEMS PLAN SECOND LEVEL ARKANSAS r✓ ' / r 1hHIg AW PARTIAL SITE PLAN I" = 501 Zwc1c v a U) Z I ..J' Ex�!� AePIA-IAL7 oyC lJcs. Y GCs '�,• F' ��E�= v GSL ; X"'T "4k aw cc a - - �.il•G- _ �.IEyJ r.C-�.r'rOLlh A. ffP,O-'EGj GLiNg EXI ET IP-,r:,".L1710j S L" iN .�.�c, N m r .G�vG' � did To i� =d'+TmU APE a ARKANSAS r✓ ' / r 1hHIg AW PARTIAL SITE PLAN I" = 501 -� NORTH E1 Wr*rCD CD O O c) Qw c 17 = N CJ] N cn O W Z Q ' J O N O N O n W w U7) N � N Q r U O� Z Q Q Y O� U Q Z - w Y V n U U O �w ~ W = J WC -3 '- CL f Zwc1c v a U) Z Y pU aw cc a J m i r�- V Z � N m r -� NORTH E1 Wr*rCD CD O O c) Qw c 17 = N CJ] N cn O W Z Q ' J O N O N O n W w U7) N � N Q r U O� Z Q Q Y O� U Q Z - w Y V n U U O �w ~ W = J WC -3 '- CL f DATE: 8/15/90 PROJECT NO.: 9005 DRAWN 3Y: L.C. D. REVISION Zwc1c v a U) Z Y pU aw cc a J m Z Um Y a VM Z W x Z © J Q J 1� W W .j LL J DATE: 8/15/90 PROJECT NO.: 9005 DRAWN 3Y: L.C. D. REVISION