Loading...
HomeMy WebLinkAboutZ-5381 Staff AnalysisNovember 20, 1990 SUBDIVISION Ztem No. 14 Z-5381 The Ranch - Zoning Site Plan NAME: Review (Z-5381) .LOCATION: The northwest corner of Ranch Boulevard and Ranch Drive. OWNER APPLICANT: The Castillo Company,ent Inc./David Parker, Ag PROPOSAL' construction of a state Farm Serviceszoned e110 -211,r focoffilais o office and approximately 2.5 acres, on property Institutional District. 1. Cit En ineerin Comments: New sidewalk proposed on Ranch Drive should be constructed against the property line.' Ranch Boulevard frontage is presently unconstructed and will also require sidewalks. The excavation and Detention Ordinance apply. 2. Staff Analsis: The applicant has submitted a site plan for a proposed insurance company claims service center. The facility will provide policy and claims adminstration to State Farm's policy holders. No retail sales of insurance policies will be conducted from the office. The single story administrative Office building will include a drive through property damage inspection area. The facility will enclose approximately 14,000 square feet in a steel frame, flat roof building. The vehicle inspection area will be comprise lofb1,380 squaas re feet. The remainder of the building and support space. The laroximatelyst space ls designated 71 employees.as office and may open with approximately Located on the Johnson Ranch property, this use in Staff's opinion, will be compatible with other possible uses. The traffic flow should be minimum. 1 November 20, 1990 Item No. 14 Continued 3. Staff Recommendation Staff recommends approval conditioned upon the applicant addressing the issues as outlined in the Engineering comments. SUBDIVISION COMMITTEE MEETING: (November 8, 1990) Ed Willis, Joe White and David Parker were in attendance. There were no objectors present. Staff gave a statement regarding the use of the property. If the applicant had no problems with the Engineering Comments, then Staff supported the request. Mr. Willis stated that the applicant would adhere to the Engineering issues. Little Rock Wastewater Utility states a sewer main extension will be required with easements. Little Rock Municipal Waterworks states a water main extension is required to serve the property. The water main in Highway 10 to which this extension will be connected is under construction. An acreage charge of $150.00 per acre will apply. No other discussion took place and this item was sent to the full Commission for action. PLANNING COMMISSION ACTION: (November 20, 1990) The agent for the applicant was in attendance. There were no objectors present. As part of the consent agenda, this item was approved per the engineering issues as part of the consent agenda. The vote was 9 ayes, 0 nays, and 2 absent. 2 ZONING SITE PLAN WRITE-UP STYLE SHEETS: Date: `- e, Subdivision Agenda: Item No.• /_,�/ Name: Location: itu" ► 1��'I� U'i [,ter�Ge owner/Applicant: jj,, Proposal: I. City Engineer Comments: r IIB_ l ad .do1`•►�ll�t's II. Staff Analysis_ -DELI, r f IL ji-C P&A 64,lck L L-0 c [.v',11i v ` C '- •� L t LSV CJL�tti�� �� - �-W a,,J �' U-•i��'�-G'J ���� � r� y rFL-LGG�� !/'/t'-' /�"L'�,�' ��'i- rye- ,•�-f.�•l'i �•L_C �Q.'l.,L�- f � �%�� L O—CU CK -1 al ooll I a III. Staff Recommendation: 0 IV. Subdivision Committee Recommendation: