Loading...
HomeMy WebLinkAboutZ-5365-E Staff AnalysisMay 6, 2004 ITEM NO.: 15 FILE NO.: Z -5365-E NAME: Geyer Springs First Baptist Church — Revised Conditional Use Permit LOCATION: 12,4001-30 OWNER/APPLICANT: Geyer Springs First Baptist Church/Joe Statton PROPOSAL: A revision to a previously approved master plan is requested for the church located on this R-2 zoned 168 acre tract. Approval is requested for placement of a 20'X 40' portable building for administration space until completion of the administration addition. 2 SITE LOCATION: The site is located on the north side of 1-30, south of Otter Creek Road and Stagecoach Road. COMPATIBILITY WITH NEIGHBORHOOD: The main campus is located on the south side of the tract. Only 26 acres of the 168 are useable; the remainder are in the floodway. The floodway provides a large buffer around the campus buildings and parking lot. The proposed ballfields are located on the north perimeter of the site, at Stagecoach Road. This area long Stagecoach is developing as nonresidential uses, including a recently approved church to the west and a mini -warehouse development to the north. The proposed church plan is compatible with uses and zoning in the area. All owners of property located within 200 feet of the site, all residents within 300 feet who could be identified and the Otter Creek and SWLR United for Progress Neighborhood Associations were notified of this request. 3. ON SITE DRIVES AND PARKIN The existing church sanctuary seats 2,000 persons, requiring 500 parking spaces. No expansion of the sanctuary is proposed. The site has parking for 1,050 vehicles with an additional 600 parking spaces being proposed. Access to the main campus is from three driveways off of the interstate frontage road. Approximately 100 parking spaces are proposed in conjunction with the ball fields. Access will be from a single driveway off of Stagecoach Road. May 6, 2004 ITEM NO.: 15 4. SCREENING AND BUFFERS: FILE NO.: Z -5365-E Compliance with the City's Landscape and Buffer Ordinance is required. A portion of the proposed parking lot encroaches into the required 30 -foot wide on-site landscape buffer area along Interstate 30. A variance of this requirement would require the approval of both the City Beautiful and Planning Commission. The proposed ball field parking lot does not provide for the required interior landscaping (8 percent) within the parking lot. Interior islands must be at least 300 square feet in area and 7 Y2 -feet in width. This is a requirement of the landscape ordinance. A 6 -foot high opaque screen, either a wooden fence with its face side directed outward, a wall or dense evergreen- plantings are required west of the proposed area to be developed. The western land use buffer width must not drip below a width of 9 -feet. The full width requirement without transfers being 50 -feet. An automatic irrigation system to water landscaped areas will be required. Prior to a building permit being issued, it will be necessary to provide landscape plans stamped with the seal of a Registered Landscape Architect. The City Beautiful Commission recommends preserving as many trees as feasible. Extra credit toward fulfilling Landscape Ordinance requirements can be given when properly preserving trees of 6 -inch caliper or larger. Trees to be preserved must be protected to their dripline with protective fencing. 5. PUBLIC WORKS COMMENTS: 1. The western portion of the proposed parking lot extension appears to encroach into the regulatory floodway. Contact Public Works, Vince Floriani (501) 371-4817 for a floodway determination. 2. As proposed, the alteration of the floodway will require flood map revisions and conditional letter of map revision would be required from Public Works and the Federal Emergency Management Agency prior to start of work. An alternative would be to re -design the parking lot. 3. A special Grading Permit for Flood Hazard Areas will be required per 2 May 6, 2004 ITEM NO.: 15 (Cont.) FILE ND.: Z -5365-E Section 8-283 prior to construction. This applies to the proposed ball field and the parking lot. 4. Stagecoach Road at the ball field entrance is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way to 55 feet from centerline will be required. 5. With construction of the ball fields, construct one-half street improvement to Stagecoach in accordance with the Master Street Plan. 6. Stormwater detention ordinance applies to this property. 6. UTILITY, FIRE DEPT. AND CATA COMMENTS: Wastewater: Sewer available, not adversely affected. Entergy: No Comments received. CenterPoint Energy: Approved as submitted. Southwestern Bell: No Comments received. Water: Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZA) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact Carroll Keatts at 992- 2431, if you would like to discuss backflow prevention requirements for this project. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. 3 May 6, 2004 ITEM NO.: 15 (Cont. FILE NO.: Z -5365-E Fire Department: A fire hydrant may be required. Contact Fire Department. County Planning: No Comments. CATA: The site is not located on a CATA bus route. SDIVISION COMMITTEE COMMENT: (APRIL 15, 2004) The applicants were present. Staff presented the item and asked for more information regarding building height, signage, phasing, lighting and fencing. Staff specifically asked if the ball fields would be lighted at night. Staff asked that a copy of the bill of assurance be provided. Staff informed the Committee that the church was proposing to place a portable building on the site for use as office space until the office phase was constructed. In response to a question from staff, the applicant stated the church did operate a day care center, but no private school. Public Works Comments were presented. The applicant was advised to meet with staff regarding an apparent encroachment of the proposed parking lot into the floodway. Landscape Comments were discussed. The applicant was advised to request a waiver of the screening requirement since the site abutted a floodway. It was noted that the R-2 property west of the proposed ball fields had recently been approved for development as a church. The applicant was advised to contact the individual utilities regarding their comments and to respond to staff issues by April 21, 2004. The Committee forwarded the item to the full Commission. STAFF ANALYSIS: On February 12, 1991, the Commission approved a conditional use permit allowing for construction of a new church building on this R-2 zoned, 168± acre tract. The approval included a single, two-story, 42,000 square foot building and associated parking. On September 6, 1994, the Commission approved -an amendment to the C.U.P. to allow for the placement of 4 portable classroom buildings on the site. Use of the portable buildings was to be for a period of 3 years or until permanent 4 May 6, 2004 ITEM NO.: 15 (Cont.) FILE NO.: Z -5365-E classroom facilities were constructed, whichever came first. On July 18, 1996, the Commission approved an amendment to the C.U.P. to allow for the addition of a day care and kindergarten within the existing building. The day care/kindergarten was approved to have a maximum enrollment of 200 children. At that time, the entire congregation had not moved from Geyer Springs to this new facility. The four previously approved portable buildings had not yet been placed on the property. Development still consisted only of the initial 42,000 square foot building and the associated parking. On May 15, 1997, the Commission approved an amendment to the C.U.P. allowing for the phased expansion of the building and parking. One large, temporary modular building had been placed on the site adjacent to the church building. Phase I consisted of a 85,000 square foot, two-story building addition and additional parking. Phase I was to contain a 2,000 seat sanctuary, offices, music rehearsal space and classrooms. The large, temporary modular building was to be removed after the completion of Phase I. Phase II was to consist of a 40,000 square foot, two-story addition and additional parking. Phase II was to contain a fellowship hall and additional classroom space. Phase I was completed and the large, temporary modular building was removed. On January 21, 2000, staff approved the placement of two portable classroom buildings on the site to be used until September 18, 2000 in anticipation of beginning the Phase II expansion. On February 22, 2000, staff approved the placement of two additional portable classroom buildings, also until September 18, 2000. On August 22, 2000, staff approved the continued use of the four portable classroom buildings until September 2001. On August 27, 2001, staff approved an extension, allowing the four portable classrooms to remain until September 2002. No additional extensions were granted and the four portable classroom buildings remain on the site. On October 30, 2003, the Commission approved the continued use of the four portable classrooms until October 30, 2005 or until the next phase of construction, whichever occurs first. The church recently approached staff about the possibility of placing a fifth portable building on the site, to be used for administrative space. During the discussion, staff was made aware that the church was in the process of preparing a new, long-range development plan. Staff suggested that the church submit a C.U.P. application for review of the new master plan and temporary use of the additional portable building. 5 May 6, 2004 ITEM NO.: 15 (Cont. FILE NO.: Z -5365-E Under the master plan approved in 1997, the phasing plan was as follows: Existing Education building 42,000 sq. ft. Existing Parking 512± spaces Phase I (sanctuary building) 36,500 sq. ft. Phase I parking 240± spaces Phase II (Fellowship hall and classrooms) 36,500 sq. ft. Phase II parking 350± spaces Total Building area 163,500 sq. ft. Total Parking 1,102 spaces The sanctuary portion of the building was to act as the "core" of the development with future phases and parking to wrap around that core. The existing facility is approximately 125,000 square feet with 1,050± parking spaces. The church property is 168 acres in size but only 26± acres are useable, due to a large floodway which bisects the site. The useable areas are where the main campus is located, adjacent to 1-30, and a small tract adjacent to Stagecoach Road. The church's new master plan is preliminary and long range in nature; however, the following components are essential to the church's growth: additional education space in all areas; additional administration space; Family Life Center; outdoor picnic and recreation areas; and the remodeling of various areas within the existing church including the fellowship hall. The exact phasing is conceptual in both program and square footage. The conceptual master plan incorporates an additional 600 parking spaces and approximately 175,000 additional square feet. The new plan would result in a facility some 300,000 square feet in size with 1,650± parking spaces. The new plan also now incorporates use of the portion of the site that abuts Stagecoach Road. Two softball fields and a parking lot are proposed for development in this area. The preliminary phasing plan is shown on the site plan documents and is proposed to include the following program: Phase IA — Preschool, Children and Youth classroom space along with additional Office space. Phase IB — Family Life Recreation space with Multi -use spaces. Phase II — Additional Kitchen space and Remodel of existing Fellowship Hall. Phase III —Additional Senior Adult and Adult classroom space. Phase IV — Additional Preschool classroom space and Choir Rehearsal space. R May 6, 2004 ITEM NO.: 15 (Cont.) FILE NO.: Z -5365-E Development of the additional parking will occur as needed and the ball fields are not indicated as a specific phase. The parking lot associated with the ball fields will be constructed in conjunction with the ball fields. The proposed buildings are mainly two stories with the exception of the east wing. This wing would be three stories with an entrance one-story below the current ground level of the existing facility. No portions of the new additions will be higher than the existing structures. The church is not proposing any new tower or steeple structures. The church currently has one ground -mounted sign along the frontage road and various small directional signs. No new signage is planned at this time. Any new signage, including signage for the ball field tract, will comply with ordinance standards for office and institutional zones. The ball field lighting has not been designed at this time; however, the intent is to have the ball fields lighted for evening and nighttime use. Lighting will be focused onto the fields. The only fencing proposed is around the ball fields and playground area. Both will be gated. On April 21, 2004, the applicant submitted responses to issues raised at Subdivision Committee. Those responses are reflected in the analysis above. The church will not be building in or altering the floodway. Once the confirmed floodway is established, the parking lot will be redesigned to avoid the floodway. The church will comply with all requirements of the landscape and buffer ordinances with one exception. At staff's suggestion, the church is requesting a waiver of the screening fence requirement adjacent to the ball field tract. The property to the west of that tract has recently been approved for development for a new church. The church is requesting approval to add a fifth portable building to the site for administration space. The intent of Phase IA is to build the classrooms and offices needed to remove all of the portable buildings upon its completion. Staff would prefer to tie the timeframes for all portable buildings together. No changes are proposed in the day care operation and no additional uses are proposed. The site is not within a subdivision and does not have a bill of assurance. Staff is supportive of the revised C.U.P. The applicant has done a good job of addressing concerns raised by staff. Each specific phase will be reviewed in detail for compliance with Code requirements at the time it is proposed. STAFF RECOMMENDATION: Staff recommends approval of the requested C.U.P. subject to compliance with the following conditions: VA May 6, 2004 ITEM NO.: 15 Cont. FILE NO.: Z -5365-E 1. Compliance with the Comments and Conditions outlined in Sections 4, 5 and 6 of the staff report. 2. Each specific phase of the development is to be reviewed by staff for compliance with Code requirements and the approved master plan. Staff recommends approval of the requested waiver of screening on the west side of the softball field tract. Staff recommends that use of the fifth portable building be approved until October 30, 2005, or until the next phase of construction, whichever occurs first. PLANNING COMMISSION ACTION: - (MAY 6, 2004) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the conditions outlined in the "Staff Recommendation" above. There was no further discussion. The item was placed on the Consent Agenda and approved as recommended by staff; including the screening waiver and use of the portable building until October 30, 2005 or the next phase of construction. The vote was 11 ayes, 0 noes and 0 absent. 0 Apr 16 04 09:59a Geyer Springs .;uly is, 1996 5014559537 p.4 xTH� 1"s FIf,E_NO NAME: Geyer Springs First Baptist Church - Conditional Use Permit LCA^.ATI ]t7; 12400 Interstate 30 og-J3RLAPPL-1:C 7 Geyer Springs First Baptist Church by Tom Brock 2K p : A conditional use permit is requested to allow for a daycare/kindergarten within the existing church building on this R-2 zoned property. The daycare/kindergarten will have a maximum enrollment of 200 children. Ogn NA_N" rESIGN STAN1]Aftns 1. Site Logatj�2n The church is located on the north side of Interstate 30, across from the Jacuzzi Company Plant. 2. Cor_,ratit?zli-JY with Neiuhborhr�: The church property consists of approximately 155 acres, of which, only about 25 acres are buildable due to the remainder of the land being located in the floodplain. Less than 5 acres are developed. This developed property fronts directly onto the 5-30 frontage road with the remaining 160± acres separating the church site from all adjoining property. The existing church building is located over 500 feet from the nearest property line. The proposed daycare/kindergarten will have no effect on the surrounding properties. 3. Un- i. ?].iv x d Parkin -iii: No additional driveways or parking spaces are proposed. The number of parking spaces on the site currently exceeds ordinance standards. 4. Scrnin d 21affers : No comments Apr 16 04 09:58a GeSer Springs 5014559537 p.5 July 18, 1996 SUBLIVISIOtt ITEM NQ—: -- 3 (Cont.] F-ILF—H2: =- Z -53c 5C 5. City Fngtnee_r comm: Ants : :To issues 6. Utility Comments: No comments received. 7. Staff Analysis The applicant is requesting a conditional use permit to allow for the location of a daycare and kindergarten within the existing Geyer Springs First Baptist Church building at 12400 Interstate 30, which is zoned R-2. The site currently consists of a large church building and parking loc. Cn September 6, 1394 the Little Rock Planning Commission approved a conditional use permit for the temporary placement of four (4) portable classroom buildings, but these buildings have not yet been placed or, the site. The proposed daycare/kindergarten will he located within the existing church building and no new buildings are being proposed for the site at this time. At present, the applicant is proposing to have an enrollment of 36 children. In the future, the entire church congregation will relocate to this facility from the Geyer Springs Road facility, and the daycare/ kindergarten will expand to a maximum enrollment of 200 children. The applicant is also proposing a 70 foot by 90 foot playground area to be located at the northwest corner of the building (as shown on-site plan). The playground will be located where one of the four future classrooms was approved to be placed -on the site. if the portable classrooms are ever placed or the site, the location of this particular one will need to be altered slightly. with the church site being located in the middle of 165 acres and the existing church building being located over 500 feet from the nearest property line, the proposed daycare/kindergarten will have no effect on the surrounding properties. Sta"= Mcommenda t ion : Staff recommends approval of the conditional use permit application. Apr 16 04 10:00a Geyer Springs 5014559537 p.6 July 18, 1996 , TBD VI I N ITEMS NG, Q8 TVI N Coot�,�TT$E C r i ice; (JUNE 27, 1996) The applicant was not present. Staff presented the item with a brief description of the proposal. The Committee determined that there were no outstanding issues and forwarded the item to the full Commission for final action. INS.,Ccrm USIION AGTI[]U: GTULY 18, 1996) The Staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairman placed the item before the Commissian for inclusion withir. the Consent Agenda for approval as reconmerded by staff. A motion to that effect was z:ade. The motion was passed by a vote of 7 ayes, 0 nays, 3 absent, and 1 open position. 3