HomeMy WebLinkAboutZ-5365 Staff AnalysisNovember 20, 1990
SUBDIVISIONS
Name:
Location:
Geyer Springs First Baptist
Church - Conditional Use Permit
(Z-5365)
12,400 Interstate 30
Owner/Applicant: Geyer Springs First Baptist
Church/Darrell Odom
PROPOSAL:
To construct a two story 42,000 sq. ft. education and
worship building.
ORDINANCE DESIGN STANDARDS:
SITE LOCATION•
North of the frontage road on Interstate 30, west of Otter
Creek, across from Jacuzzi Brothers, Inc.
COMPATIBILITY WITH NEIGHBORHOOD: �-
The site is surrounded by vacant land and commercial uses.
The proposed use will be compatible with the surrounding
area.
ON-SITE DRIVES AND PARKING:
The site contains two gravel drives which provide access to
the I-30 street frontage. The applicant is proposing over
the required number of parking spaces.
SCREENING AND BUFFERS:
The applicant plans to utilize existing trees as well as
provide for any additional landscaping that will be required
by the new landscape ordinance.
CITY ENGINEERING COMMENTS:
Engineering is unable to review this application without a
survey of the property. Recommend deferral until
application is complete.
1
November 20, 1990
SUBDIVISIONS
Item No. C (Continued)
ANALYSIS•
Staff found several problems with the site plan and survey
submitted by the applicant. The proposed use is compatible
with the surrounding area. However, the master parks plan
indicates this area as priority two for a possible park
site. The site consist of 130± acres. Because of a large
floodway, a buildable plateau of 35 acres that is abutted by
I-30 will be utilized. The floodway dedication was waived
by the city several months ago. One single family residence
exists on the site.
STAFF RECOMMENDATION:
Without the proper material for review, i.e. site plan and
survey, Staff recommends a deferral of this item until the
November 20, 1990 meeting.
SUBDIVISION COMMITTEE MEETING:
The agent for the applicant was in attendance. After
reading the Staff recommendation, the agent agreed to the
deferral because several issues concerning the application
had not been corrected. There being no further issues, this
item was passed on to the full Commission for action.
PLANNING COMMISSION ACTION: (October 9, 1990)
Neither the applicant nor a representative was in
attendance. Staff informed the Commission during the agenda
session that the application was incomplete. Therefore, a
deferral until November 20, 1990 was being recommended by
Staff. As part of the consent agenda, this item was voted
on to be deferred. The motion for approval was by a vote of
10 ayes, 0 nays, and 1 absent.
PLANNING COMMISSION ACTION:
(November 19, 1990)
Staff enformed the Commission that the application process
was still incomplete and recommended withdrawal without
prejudice. As part of the consent agenda, this item was
voted on and passed by a vote of 9 ayes, 0 nays, and 2
absent for withdrawal without prejudices.
2
October 9, 1990
SUBDIVISIONS
Name: Geyer Springs First Baptist
Church - Conditional Use Permit
(Z-5365)
Location:
12,400 Interstate 30
Owner/Applicant: Geyer Springs First Baptist
Church/Darrell Odom
PROPOSAL:
To construct a two story 42,000 sq. ft. education and
worship building.
ORDINANCE DESIGN STANDARDS:
SITE LOCATION•
North of the frontage road on Interstate 30, west of Otter
Creek, across from Jacuzzi Brothers, Inc.
COMPATIBILITY WITH NEIGHBORHOOD:
The site is surrounded by vacant land and commercial uses.
The proposed use will be compatible with the surrounding
area.
ON-SITE DRIVES AND PARKING:
The site contains two gravel drives which provide access to
the I-30 street frontage. The applicant is proposing over
the required number of parking spaces.
SCREENING AND BUFFERS:
The applicant plans to utilize existing trees as well as
provide for any additional landscaping that will be required
by the new landscape ordinance.
CITY ENGINEERING COMMENTS:
Engineering is unable to review this application without a
survey of the property. Recommend" deferral until
application is complete.
1
October 9, 1990
SUBDIVISIONS
Item No. 6 Continued
ANALYSIS•
Staff found several problems with the site plan and survey
submitted by the applicant. The proposed use is compatible
with the surrounding area. However, the master parks plan
indicates this area as priority two for a possible park
site. The site consist of 130± acres. Because of a large
floodway, a buildable plateau of 35 acres that is abutted by
I-30 will be utilized. The floodway dedication was waived
by the city several months ago. One single family residence
exists on the site.
STAFF RECOMMENDATION:
Without the proper material for review, i.e. site plan and
survey, Staff recommends a deferral of this item until the
November 20, 1990 meeting.
SUBDIVISION COMMITTEE MEETING:
The agent for the applicant was in attendance. After
reading the Staff recommendation, the agent agreed to the
deferral because several issues concerning the application
had not been corrected. There being no further issues, this
item was passed on to the full Commission for action.
PLANNING COMMISSION ACTION: (October 9, 1990)
Neither the applicant nor a representative was in
attendance. Staff informed the Commission during the agenda
session that the application was incomplete. Therefore, a
deferral until November 20, 1990 was being recommended by
Staff. As part of the consent agenda, this item was voted
on to be deferred. The motion for approval was by a vote of
10 ayes, 0 nays, and 1 absent.
2