HomeMy WebLinkAboutZ-5329 Staff AnalysisJune 5, 1990
SUBDIVISION
ITEM NO.: 4 FILE NO.: Z-5329
NAME: Cinmark Addition - Short Form "PCD"
LOCATION: Off Mabelvale Pike
DEVELOPER: ENGINEER:
Charles Menard White-Daters Inc.
401 Victory
Little Rock, AR 72201
376-1666
AREA: 2.2 acres NUMBER OF LOTS: 3 FT. NEW STREET: 0
ZONING: 11C-3"
PROPOSED USES: "PCD" - Auto related services
PLANNING DISTRICT: .65th Street East - 13
CENSUS TRACT: 2U.09 -
VARIANCES REQUESTED:
1. None
STATEMENT OF PROPOSAL:
Mr. Charles Menard, property owner, is seeking to rezone
property that he owns at Mabelvale Pike Road. The property
consists of 3 adjacent lots and three structures. One of
the structures was built as a service station and is
currently used as a repair garage.' The second -and third
structures are used for commercial, motor vehicle repair and
equipment rental.
The purpose of the request is to permit the use of the
property as an auto repair including transmission repair
shop, auto glass and muffler shop in addition to all uses
permitted under 11C-3" zoning.
In addition to the above request, the owner wishes to be
allowed an outside display of tools and rental equipment.
1
June 5, 1990
SUBDIVISION
ITEM NO.: 4 (Continued)
A. PROPOSAL RE VEST:
This proposal involves an auto repair and outside
display of rental equipment on the three lot
neighborhood shopping center in structures previously
used as a commercial shopping center zoned "C-311.
B. EXISTING CONDITIONS:
The site is currently occupied by three one story
structures. The parking is paved in asphalt with 8
curb cuts along Mabelvale Pike and one on West 51st
Street.
The surrounding properties on the south and northeast
consist of existing businesses. These businesses have
been in place for a number of years.
C. ENGINEERING COMMENTS:
Right-of-way dedication to accommodate a currently
planned bond issue widening project will be required.
The widening may require closing of some of the
driveways. Specific right-of-way and driveway
recommendations will be provided after meeting with the
applicant.
D. ISSUES LEGAL TECHNICAL DESIGN:
There are no issues of concern associated with this
"PCD". The only design concern relates to the
provision of additional right-of-way, closing curb cuts
and of meeting landscape requirements.
E. ANALYSIS•
The Planning Staff, in reviewing this plat, realizes
that the owner is keeping existing uses which have been
in place for a number of years
However, there are issues involved that should be dealt
with by the Planning and Engineering Staff. This is
based upon accommodating a recent bond project
involving the widening of Mabelvale Pike which would
require additional right-of-way dedication and closing
some of the driveways.
2
June 5, 1990
SUBDIVISION
ITEM NO.: 4 Continued
F. STAFF RECOMMENDATION:
The Staff recommends approval of the 11PCD11 subject to
dedication of additional right-of-way, closing curb
cuts and meeting City requirements for landscaping.
SUBDIVISION COMMITTEE COMMENTS: (May 24, 1990)
Mr. Joe White and Bill Rector were present representing this
application. Mr. Rector described this "PCD" and various
elements of the proposal. He indicated that this is an
existing business that was taken into the City Limits. He
also stated that the Staff recommendation presented no
serious problems, however, he questioned the Engineering
comments and specific recommendation concerning right-of-way
dedication. In a brief discussion, Jerry Gardner indicated
that he would need to work with the Engineer on this project
and the Public Works Director to determine the status of the
improvements on Mabelvale Pike.
PLANNING COMMISSION ACTION:
(jUNE 5, 1990)
The applicant was present. The Planning Commission briefly
discussed this PCD. Mr. Jerry Gardner of the City
Engineer's Staff was asked by the Chairman to provide a
statement on right-of-way modification for Mabelvale Pike.
Mr. Gardner stated that the existing design project will fit
in right-of-way. The only additional right-of-way,
requested by City Engineering, will be located on the curve.
After a brief discussion, the Commission determined it
appropriate to place this item on the consent agenda for
approval. The motion to that effect was made and passed by
a vote of 10 ayes, 0 noes, 1 absent.
3
June 5, 1990
SUBDIVISION
ITEM NO.: 4 FILE NO.: Z-5329
NAME: Cinmark Addition - Short Form "PCD"
LOCATION: Off Mabelvale Pike
DEVELOPER: ENGINEER:
Charles Menard White-Daters Inc.
401 Victory
Little Rock, AR 72201
376-1666
AREA: 2.2 acres NUMBER OF LOTS: 3 FT. NEW STREET: 0
ZONING: "C-3"
PROPOSED USES: "PCD" - Auto related services
PLANNING DISTRICT: 65th Street East - 13
CENSUS TRACT: 20.0# -
VARIANCES REQUESTED
1. None
STATEMENT OF PROPOSAL:
Mr. Charles Menard, property owner, is seeking to rezone
property that he owns at Mabelvale Pike Road. The property
consists of 3 adjacent lots and three structures. One of
the structures was built as a service station and is
currently used as a repair garage.' The second -and third
structures are used for commercial, motor vehicle repair and
equipment rental.
The purpose of the request is to permit the use of the
property as an auto repair including transmission repair
shop, auto glass and muffler shop in addition to all uses
permitted under 11C-3" zoning.
In addition to the above request, the owner wishes to be
allowed an outside display of tools and rental equipment.
1
June 5, 1990
SUBDIVISION
ITEM NO.: 4 Continued
A. PROPOSAL RE UEST:
This proposal involves an auto repair and outside
display of rental equipment on the three lot
neighborhood shopping center in structures previously
used as a commercial shopping center zoned "C-311.
B. EXISTING CONDITIONS:
The site is currently occupied by three one story
structures. The parking is paved in asphalt with 8
curb cuts along Mabelvale Pike and one on West 51st
Street.
The surrounding properties on the south and northeast
consist of existing businesses. These businesses have
been in place for a number of years.
C. ENGINEERING COMMENTS:
Right-of-way dedication to accommodate a currently
planned bond issue widening project will be required.
The widening may require closing of some of the
driveways. Specific right-of-way and driveway
recommendations will be provided after meeting with the
applicant.
D. ISSUES LEGAL TECHNICAL DESIGN:
There are no issues of concern associated with this
"PCD". The only design concern relates to the
provision of additional right-of-way, closing curb cuts
and of meeting landscape requirements.
E. ANALYSIS•
The Planning Staff, in reviewing this plat, realizes
that the owner is keeping existing uses which have been
in place for a number of years
However, there are issues involved that should be dealt
with by the Planning and Engineering Staff. This is
based upon accommodating a recent bond project
involving the widening of Mabelvale Pike which would
require additional right-of-way dedication and closing
some of the driveways.
E
June 5, 1990
SUBDIVISION
ITEM NO.� 4 Continued
F. STAFF RECOMMENDATION:
The Staff recommends approval of the "PCD" subject to
dedication of additional right-of-way, closing curb
cuts and meeting City requirements for landscaping.
SUBDIVISION COMMITTEE COMMENTS: (May 24, 1990)
Mr. Joe White and Bill Rector were present representing this
application. Mr. Rector described this "PCD" and various
elements of the proposal. He indicated that this is an
existing business that was taken into the City Limits. He
also stated that the Staff recommendation presented no
serious problems, however, he questioned the Engineering
comments and specific recommendation concerning right-of-way
dedication. In a brief discussion, Jerry Gardner indicated
that he would need to work with the Engineer on this project
and the Public Works Director to determine the status of the
improvements on Mabelvale Pike.
PLANNING COMMISSION ACTION: (jUNE 5, 1990)
The applicant was present. The Planning Commission briefly
discussed this PCD. Mr. Jerry Gardner of the City
Engineer's Staff was asked by the Chairman to provide a
statement on right-of-way modification for Mabelvale Pike.
Mr. Gardner stated that the existing design project will fit
in right-of-way. The only additional right-of-way,
requested by City Engineering, will be located on the curve.
After a brief discussion, the Commission determined it
appropriate to place this item on the consent agenda for
approval. The motion to that effect was made and passed by
a vote of 10 ayes, 0 noes, 1 absent.
3