HomeMy WebLinkAboutZ-5276-A Staff AnalysisFILE NO.: Z -5276-A
NAME: Faithway Baptist Church Short -form PCD
LOCATION: Located at 7510 South University Avenue
DEVELOPER:
Faithway Baptist Church
7516 South University Avenue
Little Rock, AR 72209
R 1R\/FYOR-
Brooks Surveying, Inc.
20820 Arch Street Pike
Hensley, AR 72065
FNC;INFFR-
Phillip Lewis Engineering, Inc.
2701 Kavanaugh Boulevard, Suite 200
Little Rock, AR 72205
AREA: 0.39 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
WARD: 7 PLANNING DISTRICT: 15 — Geyer Springs West CENSUS TRACT: 20.01
CURRENT ZONING:
ALLOWED USES
PROPOSED ZONING
PCD - Expired
C-3, General Commercial District uses
PCD
PROPOSED USE: Church
VARIANCEMAIVERS: A variance to allow the drive on Wanda Lane nearer the
property line and intersection than typically allowed per Sections 30-43 and 31-210.
BACKGROUND:
A request to rezone this property from R-2, Single-family to C-4, Open Display District
was reviewed by the Planning Commission in early 1990. During the Planning
Commission discussions it was stated the site had a C-3, General Commercial District,
FILE NO.: Z -5276-A (Cont.
non -conforming status due to the history. Staff stated small C-3 uses had utilized the
property over the years. The staff analysis states several months prior to the
application request being filed for rezoning to C-4, Open Display District a use was
occupying the site with outdoor display for sale of boats and campers. An enforcement
action was filed for the site and a rezoning request to C-4, Open Display District was
filed. Staff and the Commission did not support the requested rezoning to C-4 and
during the public hearing on January 2, 1990, a motion was made to recommend
approval of an amended request from C-4 to PCD and to defer the item for
two (2) weeks to the January 16, 1990 hearing.
The staff update provided at the January 16, 1990, hearing included conditions placed
on the PCD zoning which included:
— The PCD shall be for all C-3 uses;
Parking shall be provided in the front yard area and west of the building
(the existing parking areas);
— An opaque screening fence shall be maintained along the north property line;
No outside storage or parking shall be permitted in the yard area to the north of
the building (Lot 18); and
The structural involvement shall be limited to one single story building. If the
existing structure is destroyed by fire or natural causes, a new building can be
constructed with the same footprint and square footage.
The Commission approved the PCD request and the item was forwarded to the Board
of Directors for final action. Ordinance No. 15,821 adopted by the Little Rock Board of
Directors on February 20, 1990, rezoned this property from R-2, Single-family to PCD,
Planned Commercial Development.
In September 2009, the current owners, Faithway Baptist Church, were issued a
demolition permit to remove the structure. The structure has been removed and the site
is currently a grass covered lot.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The Faithway Baptist Church is proposing to develop this site (0.39 acres) to
provide a new church and meeting space. The building is proposed containing
1,600 square feet. The building will be provided with 15 parking spaces including
two (2) handicap accessible spaces. The new building will be wood framed with
a slab -on -grade foundation system.
B. EXISTING CONDITIONS:
The site is a vacant grass covered site. To the east of this site is Heritage
House. To the west of the site is a shopping center containing a number of office
uses. Faithway Baptist Church also occupies space within this center. North of
2
FILE NO.: Z -5276-A (Cont.
the site are single-family homes and south of the site is Interstate 30. Wanda
Lane is constructed with curb and gutter and sidewalk along the west side of the
street. Adjacent to this site there is not a sidewalk in place. There are no
sidewalks in place along South University Avenue adjacent to this site. The
street is constructed as a one-way street, the 1-30 Frontage Road, and has open
ditches for drainage.
C. NEIGHBORHOOD COMMENTS.-
All
OMMENTS:
All property owners located within 200 feet of the site along with the South
Brookwood Pondersosa Neighborhood Association and Southwest Little Rock
United for Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS. -
1 .
ONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan specifies that
Wanda Lane for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
3. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
4. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
5. Remove the existing curb cut and install new curb and gutter on Wanda Lane
near the 1-30 Frontage Road. Also remove the existing culverts and
driveways not proposed to be used on the 1-30 Frontage Road.
6. All driveways shall be concrete aprons on City streets per City Ordinance.
7. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveways must be located at
least 125 feet from side property lines and 250 feet from intersections and
other driveways. A variance is needed to be approved for the proposed
driveway location on Wanda Lane.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this site.
Entergy: Entergy does not object to this proposal. A three (3) phase power line
exists along the frontage road to the south of this property and on the east side of
the property. Extreme caution must be used in the construction activities in the
vicinity of the power lines so that proper clearances are maintained. Contact
Entergy in advance to discuss future service requirements, new facilities
locations and adjustments to existing facilities (if any) as this project proceeds.
3
FILE NO.: Z -5276-A (Cont.
Centerpaint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
3. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
4. Contact Central Arkansas Water regarding the size and location of water
meter.
5. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 501.377.1226 if you would like to
discuss backflow prevention requirements for this project.
6. The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's materials
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
7. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are
used, a reduced pressure zone back flow preventer shall be required.
Fire Department:
1. Maintain access.
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations
as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
4
FILE NO.: Z-5276-A(Cont.)
fire apparatus access road, the minimum road width shall be 26 feet,
exclusive of shoulders.
3. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas
Fire Prevention Code. Section C101 — C105, in conjunction with Central
Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue
501.918.3754). Number and Distribution of Fire Hydrants as per Table
C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Location is currently served by METRO on route 17 at
Wanda Ln. and Forbing Rd. Some sidewalks are available to access transit in
this location. Pedestrian infrastructure must be included for transit rider and
disability community access, except where prohibited by highway regulation.
F. ISSUES/TECHNICAUDESIGN:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey _littlerock.org or
Mark Alderfer at 501.371.4875; malderfer@littlerock.orq.
Planning Divisions: This request is located in the Geyer Springs West Planning
District. The Land Use Plan shows Commercial (C) for this property. The
Commercial category includes a broad range of retail and wholesale sales of
products, personal and professional services and general business activities.
Commercial activities vary in type and scale, depending on the trade area that
they serve. The applicant has applied for revision of a PCD (Planned Commercial
District) to allow the construction of a new church on this vacant lot.
Master Street Plan: South side of the property is Interstate 30 and it is a
Freeway on the Master Street Plan. West part of the property is Wanda Lane and
it is a Local Street on the Master Street Plan. The primary function of a Local
Street is to provide access to adjacent properties. Local Streets that are abutted
by non-residential zoning/use or more intensive zoning than duplexes are
considered as "Commercial Streets". A Collector design standard is used for
Commercial Streets. This street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
R,
LE NO.: Z -5276-A (Cont.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. A land use buffer six (6) percent of the average width/depth of the lot will be
required when an adjacent property has a dissimilar use of a more
restrictive nature. The property to the north is zoned R-2, Single-family. As
a component of all land use buffer requirements, opaque screening,
whether a fence or other device, a minimum of six (6) feet in height shall be
required upon the property line side of the buffer. A minimum of seventy
(70) percent of the land use buffer shall be undisturbed. Easements cannot
count toward fulfilling this requirement. The plantings, existing and
purposed, shall be provided within the landscape ordinance of the City,
Section 15-102. The buffer adjacent to the northern residential property is
deficient. A minimum nine (9) foot perimeter planting strip will be required in
this area.
3. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property or the right-of-way of any street. This strip shall
be at least nine (9) feet wide. One (1) tree and three (3) shrubs or vines
shall be planted for every thirty (30) linear feet of perimeter planting strip.
4. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (Y2) the full width requirement
but in no case less than nine (9) feet. Trees and shrubs are required planted
adjacent to street right-of-way. Plant material is to be provided at one (1)
tree and three (3) shrubs for every 30 linear feet. A nine (9) foot street buffer
will be required along the 1-30 Frontage Road.
5. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape
area. Provide trees with an average linear spacing of not less than thirty
(30) feet.
6. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the
parking area(s). The minimum size of an interior landscape area shall be
one hundred fifty (150) square feet for developments with one hundred fifty
(150) or fewer parking spaces. Interior islands must be a minimum of seven
and one half (7 1/2) feet in width. Trees shall be included in the interior
landscape areas at the rate of one (1) tree for every twelve (12) parking
spaces.
7. Building landscape areas shall be provided between the vehicular use area
used for public parking and the general vicinity of the building. These shall
be provided at the rate equivalent to planter strip three (3) feet wide along
the vehicular use area. One (1) tree and four (4) shrubs shall be planted in
the building landscape areas for each forty (40) linear feet of vehicular use
area abutting the building.
FILE NO.: Z -5276-A (Cont.
8. An irrigation system shall be required for developments of one (1) acre or
larger.
9. For developments of less than one (1) acre a there shall be a water source
within seventy-five (75) feet of the plants to be irrigated.
10. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. SUBDIVISION COMMITTEE COMMENT: (April 27, 2016)
The applicant was present representing the request. Staff presented an
overview of the item stating there were few outstanding technical issues
associated with the request. Staff stated parking for a church was based on the
number of seats. Staff questioned the seating capacity of the proposed church.
Staff requested information concerning the proposed signage plan, the activities
proposed for the site and the proposed lighting plan. Staff questioned the days
and hours of activities on the site and the days and hours of dumpster service.
Public Works comments were addressed. Staff stated dedication of right of way
on Wanda Lane was required with the development of the site. Staff also stated a
radial dedication of right of way was required to the intersection of Wanda Lane
and South University Avenue. Staff stated driveway permits from AHTD were
required for the proposed development. Staff requested the existing curb cut on
South University be removed.
Landscaping comments were addressed. Staff stated the site was to come into
full compliance with the City's Landscape and Buffer ordinances. Staff stated a
perimeter planting strip was required along any side of a vehicular use area.
Staff stated street buffers were required along South University Avenue and
Wanda Lane. Staff stated the parking lot was to be landscaped with a minimum
of eight (8) percent interior landscaping including the placement of islands.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion.
The Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
technical issues associated with the request. The plan includes the seating
capacity of the church, the proposed signage plan and the days and hours of
activities to take place on the site. The applicant has indicated there will not be a
dumpster located on the site.
VA
ILE NO.: Z -5276-A (Cont.
The request is to revise a previously approved PCD for the property currently
owned by Faithway Baptist Church. The church is proposing to develop this site
(0.39 acres) to provide a new church and meeting space. The building is
proposed containing 1,600 square feet. The site plan indicates the placement of
15 parking spaces including two (2) handicap accessible spaces. The new
building will be wood framed with a slab -on -grade foundation system. There is
no parking lot lighting proposed with the new construction. All accent lighting will
be low level, directional, directed downward and into the site.
The applicant has indicated there will be a single ground sign located on the site
not to exceed six (6) feet in height and sixty-four (64) square feet in area.
Building signage will be limited to the facades with public street frontage.
The signage will be limited to thirty-two (32) square feet in sign area.
The seating capacity for the church is indicated at 44 persons. Parking for a
church is typically based on one (1) space per every four (4) seats. The parking
typically required for the church would be eleven (11) spaces.
The site plan currently does not comply with the minimum landscape
requirements per the zoning or landscape ordinances along South University
Avenue. Staff recommends the two (2) spaces on either side of the driveway
located along South University Avenue be removed to provide the proper
landscape strip. With the removal of the two (2) spaces the typical parking for
the use can still be met. All other perimeter landscaping appears to comply with
the typical minimum requirements of the landscape and buffer ordinances. The
site plan includes the placement of a six (6) foot fence along the northern
perimeter of the site, adjacent to the residentially zoned and used property.
The applicant has indicated the services are currently scheduled for Sunday,
8 a.m. to 10 p.m. and Wednesday from 5 p.m. to 10 p.m. The church does not
offer a mother's day out program or daycare service.
The request includes a variance to allow the drive on Wanda Lane nearer the
property line and intersection than typically allowed per Sections 3043 and
31-210. The drive is located approximately 9 -feet from the northern property line.
Staff is supportive of the driveway placement.
Staff is supportive of the applicant's request subject to the two (2) southern -most
parking spaces, adjacent to South University Avenue, being removed to provide
the required landscape strip and street buffer. To staffs knowledge there are no
remaining outstanding technical issues associated with the request. Staff feels
the revision to the previously approved PCD zoning to establish a site plan for
the church is appropriate.
FILE NO.: Z -5276-A (Cont.)
I. STAFF RECOMMENDATIO
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs. D, E and F of the agenda
staff report.
Staff recommends approval of the variance request from Sections 30-43 and
31-210 to allow the drives as indicated on the site plan.
Staff recommends the two (2) southern -most parking spaces be removed to
provide the proper landscape and street buffering.
PLANNING COMMISSION ACTION: (MAY 19, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request from Sections 30-43 and 31-210 to allow the drives as indicated on the site
plan. Staff presented a recommendation the two (2) southern -most parking spaces be
removed to provide the proper landscape and street buffering. There was no further
discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 11 ayes, 0 noes and 0 absent.
9